| ID | Date | Author | Project | Subject | Run Number | Events  | XYPosition | Cooling | Data | 
| 22 | Sat Jun  6 16:18:48 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run | hw003 | 50000 |  |  | Unknown | 
| Table: 100:70 Bias: +-50V Run to confirm trigger delay | 
| 23 | Sat Jun  6 16:48:41 2015 | Hao Yin | Belle II FADC (H6A) | Hardware | 008 | 50000 | 8 | No | Good | 
| room temp, FIRRun002, PedestalRun005, room temp target: FW, pos 8 (p-0, n-0) | 
| Attachment 1: FW_edge_1_p-side_008ModProp.pdf | 
| Attachment 2: FW_edge_1_n-side_008ModProp.pdf | 
| Attachment 3: FW_edge_1_p-side_008Result.pdf | 
| Attachment 4: FW_edge_1_n-side_008Result.pdf | 
| Attachment 5: L6_p-side_008ModProp.pdf | 
| Attachment 6: L6_n-side_008ModProp.pdf | 
| Attachment 7: L6_p-side_008Result.pdf | 
| Attachment 8: L5_p-side_008ModProp.pdf | 
| Attachment 9: L6_n-side_008Result.pdf | 
| Attachment 10: L5_n-side_008ModProp.pdf | 
| Attachment 11: L5_p-side_008Result.pdf | 
| Attachment 12: L3_p-side_008ModProp.pdf | 
| Attachment 13: L5_n-side_008Result.pdf | 
| Attachment 14: L3_n-side_008ModProp.pdf | 
| Attachment 15: L3_p-side_008Result.pdf | 
| Attachment 16: L3_n-side_008Result.pdf | 
| Attachment 17: L4_p-side_008ModProp.pdf | 
| Attachment 18: L4_n-side_008ModProp.pdf | 
| Attachment 19: L4_p-side_008Result.pdf | 
| Attachment 20: L4_n-side_008Result.pdf | 
| 35 | Sun Jun  7 13:21:15 2015 | Hao Yin | Belle II FADC (H6A) | Hardware | 011 | 50000 |  |  | Good | 
| cooled (see attachment) FIRRun002, PedestalRun006 target: -Z, pos 2 | 
| Attachment 1: Pos2.PNG | 
|  | 
| 37 | Sun Jun  7 15:03:31 2015 | Thomas Bergauer | SVD3 (H6B) | hardware run with TLU and Telescope | hw050 | 50000 | 2 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 50 Mimosa Threshold 7 Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)  | 
| 38 | Sun Jun  7 15:59:05 2015 | Hao Yin | Belle II FADC (H6A) | Hardware | 012 | 50000 |  |  | Unknown | 
| cooled (see attachment) FIRRun002, PedestalRun006 target: CE, pos 2
 cooling box emergency break ... ie about the last 1-10 k not useable.
 | 
| Attachment 1: Pos3.PNG | 
|  | 
| 40 | Sun Jun  7 20:03:09 2015 | Thomas Bergauer | SVD3 (H6B) | hardware run with TLU and Telescope | hw051 | 50000 | 3 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 51 Mimosa Threshold 7 Pos 3: x=38.6 mm, y=84 mm | 
| 41 | Sun Jun  7 20:03:31 2015 | Thomas Bergauer | SVD3 (H6B) | hardware run with TLU and Telescope | hw052 | 50000 | 4 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 52 Mimosa Threshold 7 Pos 4: x=130.7 mm, y=84 mm (hits auf APV 2 und (bisschen) 3, (bisschen) 8 und 9, 15 und 16 | 
| 42 | Sun Jun  7 20:37:56 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw053 | 50000 | 5 |  | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 53 Mimosa Threshold 6 Pos 5: x=30.5 mm, y= 99.74 mm (wide side top) | 
| 43 | Sun Jun  7 23:04:06 2015 | Hao Yin | Belle II FADC (H6A) | Hardware | 013 | 50000 |  |  | Good | 
| cooled (see attachment) FIRRun002, PedestalRun006 target: CE, pos 3
 cooling box emergency break ... ie about the last 1-10 k not useable.
 | 
| 48 | Mon Jun  8 09:37:30 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw056 | 50000 | 8 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 56 Mimosa Threshold 6 Pos 8: x=136.08 mm, y= 79 mm (narrow side center) | 
| Attachment 1: run000056-fitter-residuals.pdf | 
| 49 | Mon Jun  8 10:47:44 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw057 | 50000 | 9 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 57 Mimosa Threshold 6 Pos 9: x=30.5 mm, y= 60.67 mm (wide side down) | 
| Attachment 1: run000057-fitter-residuals.pdf | 
| 51 | Mon Jun  8 11:57:14 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw058 | 50000 | 10 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 58 Mimosa Threshold 6 Pos 10: x= 136.08mm, y=68.9 mm (narrow side down) | 
| 54 | Mon Jun  8 15:49:23 2015 | Benedikt Würkner | SVD3 (H6B) | Hardware FEI4 | 60 | 50000 | 10 | No | Unknown | 
| Hardware run with FEI4, Telescope and FW&BW Modules Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)   Bilder: Hitmap FE-I4 und Correlation zw. Mimosa und FE-I4 | 
| Attachment 1: Screenshot_2015-06-08_17.59.50.png | 
|  | 
| Attachment 2: Screenshot_2015-06-08_17.41.03.png | 
|  | 
| 57 | Mon Jun  8 18:00:06 2015 | Benedikt Würkner | SVD3 (H6B) | Hardware FEI4 | hw061 | 50000 | 2 | No | Unknown | 
| RUN WITH SVD3, telescope and FEI4 EUDET Run 61 Mimosa Threshold 6 Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)  | 
| 60 | Mon Jun  8 20:16:41 2015 | Benedikt Würkner | SVD3 (H6B) | Hardware FEI4 | 62 | 50000 | 3 | No | Unknown | 
| RUN WITH SVD3, telescope and FEI4 EUDET Run 62 Mimosa Threshold 6 Pos 3: x=38.6 mm, y=84 mm | 
| 64 | Tue Jun  9 09:50:15 2015 | Benedikt Würkner | SVD3 (H6B) | Hardware FEI4 | 64 | 50000 | 5 | No | Unknown | 
| RUN WITH SVD3, telescope and FEI4 EUDET Run 64 Mimosa Threshold 6 Pos 5: x=30.5 mm, y= 99.74 mm (wide side top) | 
| 67 | Tue Jun  9 11:20:25 2015 | Benedikt Würkner | SVD3 (H6B) | Vertical Beam Profile Run | 65 | 50000 | 2 | No | Unknown | 
| Trying to get a nice plot of the beam profile by only using the vertical PMTs (number 0 and 2) see http://elog.hephy.at/testbeam-SPS2015/66 for details.  Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)  Producer.TLU Config Change: | 
| 68 | Tue Jun  9 12:34:16 2015 | Benedikt Würkner | SVD3 (H6B) | Horizontal Beam Profile Run | 66 | 50000 | 2 | No | Unknown | 
| Trying to get a nice plot of the beam profile by only using the PMTs 1 and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66 for details.  Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)  Producer.TLU Config Change: | 
| 69 | Tue Jun  9 14:33:50 2015 | Benedikt Würkner | SVD3 (H6B) | Vertical Beam Profile Run | 67 | 50000 | 2 | No | Unknown | 
| Trying to get a nice plot of the beam profile by only using the vertical PMT 0 (upstream vertical, the long one)  see http://elog.hephy.at/testbeam-SPS2015/66 for details.  Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)  Producer.TLU Config Change: | 
| 82 | Wed Jun 10 19:05:04 2015 | Benedikt Würkner | SVD3 (H6B) | Hardware FEI4 | 71 | 50000 | 1 | No | Unknown | 
| RUN WITH SVD3, telescope and FEI4 EUDET Run 71 Mimosa Threshold 6 Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite ) Downstream FEI4 used |