Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015  Not logged in ELOG logo
Message ID: 49     Entry time: Mon Jun 8 10:47:44 2015
Author: Benedikt Würkner 
Project: SVD3 (H6B) 
Subject: hardware run with TLU and Telescope 
Run Number: hw057 
Events: 50000 
XYPosition:
Cooling: No 
Data: Good 

RUN WITH SVD3 plus telescope

EUDET Run 57

Mimosa Threshold 6

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Attachment 1: run000057-fitter-residuals.pdf  31 kB  Uploaded Thu Jun 11 11:34:59 2015
ELOG V3.1.5-fc6679b