Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015  Not logged in ELOG logo
Message ID: 64     Entry time: Tue Jun 9 09:50:15 2015
Author: Benedikt Würkner 
Project: SVD3 (H6B) 
Subject: Hardware FEI4 
Run Number: 64 
Events: 50000 
XYPosition:
Cooling: No 
Data: Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 64

Mimosa Threshold 6

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

ELOG V3.1.5-fc6679b