Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 3 of 5  Not logged in ELOG logo
ID Date Author Projectdown Subject Run Number Events StartTime EndTime Data Text Attachments
  61   Mon Oct 10 00:50:23 2011 Christian IrmlerHPKbaby_addrun023680k10.10.2011 00:51:2610.10.2011 09:15:35Goodno cooling
beam on; xy table position x=330 
y=74
  
  62   Mon Oct 10 10:37:52 2011 Christian IrmlerCNMCNM stackcal0128380010.10.2011 11:29:5510.10.2011 11:40:55Unknownno cooling
beam on; xy table position x=330 
y=64
  
  63   Mon Oct 10 12:15:52 2011 Manfred ValentanCNMCNM stackrun02411000010.10.2011 12:03:5810.10.2011 14:05:56Goodno cooling
beam on; xy table position x=320.5 
y=79.5
  
  65   Mon Oct 10 12:32:42 2011 Manfred ValentanCNMCNM stack configuration    UnknownModule order:
CNM-V1 (draws a lot of current, gives
only low signal)
 IMG_5102.JPGIMG_5092.JPG 
  66   Mon Oct 10 14:11:53 2011 Christian IrmlerCNMCNM stackrun02511000010.10.2011 14:09:0010.10.2011 16:11:57Goodno cooling
beam on; xy table position x=335.5 
y=79.5
  
  67   Mon Oct 10 16:26:20 2011 Marko DragicevicCNMCNM stackrun02630000010.10.2011 16:23:4610.10.2011 20:30:00Goodno cooling
beam on; xy table position x=328 
y=69.5
  
  30   Tue Oct 4 21:40:52 2011 Christian IrmlerBELLEOrigami stackcal0048380004.10.2011 21:18:0904.10.2011 21:50:23GoodOrigami6
HV=+-40V, no cooling
beam on
  
  31   Tue Oct 4 22:11:12 2011 Christian IrmlerBELLEOrigami stackrun00533000004.10.2011 22:09:3705.10.2011 09:11:54CrapOrigami6
HV=+-40V, no cooling
beam on
  
  32   Wed Oct 5 12:09:00 2011 Christian IrmlerBELLEOrigami stack cooled wrong I2C settingscal0058380005.10.2011 12:04:5005.10.2011 12:37:11CrapThis calibration file can not be
used, due to wrong I2C settings!
Origami6
  
  33   Wed Oct 5 13:00:41 2011 Christian IrmlerBELLEOrigami stack cooled run0062469205.10.2011 12:55:5305.10.2011 14:05:49CrapRun stopped after 24692 events,
because all n-side APV failed due to a shortcut
of a capacitor (C223) on n-side rebo
  
  34   Wed Oct 5 16:43:00 2011 Christian IrmlerBELLEOrigami stack cooledcal0068380005.10.2011 16:40:1805.10.2011 17:12:27GoodOrigami6
HV=+-40V
beam on
  
  35   Wed Oct 5 17:54:09 2011 Christian IrmlerBELLEOrigami stack cooledcal0078380005.10.2011 17:51:57  GoodI2C setting modified to improve the shape
of the p-side signal --> shaping time
reduced, pulse height still low
  
  37   Wed Oct 5 19:57:15 2011 Christian IrmlerBELLEOrigami stack cooled run0071784505.10.2011 18:27:5105.10.2011 19:31:43CrapRun stopped after 17845 events,
because of bad trigger timing
  
  38   Wed Oct 5 20:28:00 2011 Markus FriedlBELLEOrigami stack cooledrun0081058205.10.2011 20:25:1005.10.2011 20:45:10GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  39   Wed Oct 5 20:49:11 2011 Markus FriedlBELLEOrigami stack cooledrun009330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  40   Thu Oct 6 09:22:34 2011 Christian IrmlerBELLEOrigami stack cooledrun010330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  41   Thu Oct 6 15:57:51 2011 Christian IrmlerBELLEOrigami stack cooledcal0088380006.10.2011 15:53:2006.10.2011 16:25:29 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  42   Thu Oct 6 17:36:47 2011 Christian IrmlerBELLEOrigami stack cooledrun01118000006.10.2011 17:06:3807.10.2011 00:04:06GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  43   Fri Oct 7 00:20:15 2011 Christian IrmlerBELLEOrigami stack cooledrun012250k07.10.2011 00:15:54 07.10.2011 09:13:55GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  44   Fri Oct 7 10:13:12 2011 Christian IrmlerBELLEOrigami stack cooledrun013185k07.10.2011 10:02:2007.10.2011 17:17:32GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
ELOG V3.1.5-fc6679b