Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 3 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Events StartTimedown EndTime Data Text Attachments
  42   Thu Oct 6 17:36:47 2011 Christian IrmlerBELLEOrigami stack cooledrun01118000006.10.2011 17:06:3807.10.2011 00:04:06GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  41   Thu Oct 6 15:57:51 2011 Christian IrmlerBELLEOrigami stack cooledcal0088380006.10.2011 15:53:2006.10.2011 16:25:29 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  39   Wed Oct 5 20:49:11 2011 Markus FriedlBELLEOrigami stack cooledrun009330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  40   Thu Oct 6 09:22:34 2011 Christian IrmlerBELLEOrigami stack cooledrun010330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  38   Wed Oct 5 20:28:00 2011 Markus FriedlBELLEOrigami stack cooledrun0081058205.10.2011 20:25:1005.10.2011 20:45:10GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  37   Wed Oct 5 19:57:15 2011 Christian IrmlerBELLEOrigami stack cooled run0071784505.10.2011 18:27:5105.10.2011 19:31:43CrapRun stopped after 17845 events,
because of bad trigger timing
  
  35   Wed Oct 5 17:54:09 2011 Christian IrmlerBELLEOrigami stack cooledcal0078380005.10.2011 17:51:57  GoodI2C setting modified to improve the shape
of the p-side signal --> shaping time
reduced, pulse height still low
  
  34   Wed Oct 5 16:43:00 2011 Christian IrmlerBELLEOrigami stack cooledcal0068380005.10.2011 16:40:1805.10.2011 17:12:27GoodOrigami6
HV=+-40V
beam on
  
  33   Wed Oct 5 13:00:41 2011 Christian IrmlerBELLEOrigami stack cooled run0062469205.10.2011 12:55:5305.10.2011 14:05:49CrapRun stopped after 24692 events,
because all n-side APV failed due to a shortcut
of a capacitor (C223) on n-side rebo
  
  32   Wed Oct 5 12:09:00 2011 Christian IrmlerBELLEOrigami stack cooled wrong I2C settingscal0058380005.10.2011 12:04:5005.10.2011 12:37:11CrapThis calibration file can not be
used, due to wrong I2C settings!
Origami6
  
  90   Mon Mar 5 19:27:56 2012 Christian IrmlerBELLEOrigami Module #4run11150k05.03.2012 19:26:28 UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,30µA
  
  89   Mon Mar 5 19:06:41 2012 Christian IrmlerBELLEOrigami Module #4cal1108380005.03.2012 19:05:5205.03.2012 19:17:01UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
  
  88   Mon Mar 5 18:41:23 2012 Christian IrmlerBELLEOrigami Module #4run110100k05.03.2012 18:45:2105.03.2012 19:04:30UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
  
  87   Mon Mar 5 18:08:02 2012 Christian IrmlerBELLEOrigami Module #4cal1098380005.03.2012 18:07:4005.03.2012 18:18:32UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
  
  86   Mon Mar 5 17:36:46 2012 Christian IrmlerBELLEOrigami Module #4run109100k05.03.2012 17:36:19 05.03.2012 17:55:24 UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
  
  85   Mon Mar 5 17:35:31 2012 Christian IrmlerBELLEOrigami Module #4cal1088380005.03.2012 16:47:5105.03.2012 17:05:16UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
 run108-109.jpg 
  31   Tue Oct 4 22:11:12 2011 Christian IrmlerBELLEOrigami stackrun00533000004.10.2011 22:09:3705.10.2011 09:11:54CrapOrigami6
HV=+-40V, no cooling
beam on
  
  30   Tue Oct 4 21:40:52 2011 Christian IrmlerBELLEOrigami stackcal0048380004.10.2011 21:18:0904.10.2011 21:50:23GoodOrigami6
HV=+-40V, no cooling
beam on
  
  28   Tue Oct 4 15:16:06 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom leftrun003200k04.10.2011 11:29:1904.10.2011 13:57:54Goodhit modules in bottom left corner ->
Zones wide and half-wide for COMB_IRRAD,
Zones narrow and half-narrow for BOMM_IRRAD
  
  26   Tue Oct 4 10:44:48 2011 Christian IrmlerMicronInternal Calibrationcal0038380004.10.2011 10:33:5004.10.2011 10:48:51 micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
  
ELOG V3.1.5-fc6679b