Entry  Thu Oct 6 17:36:47 2011, Christian Irmler, BELLE, Origami stack cooled, run011, 180000, 06.10.2011 17:06:38, 07.10.2011 00:04:06, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=260.8 y=60.25
Entry  Thu Oct 6 15:57:51 2011, Christian Irmler, BELLE, Origami stack cooled, cal008, 83800, 06.10.2011 15:53:20, 06.10.2011 16:25:29 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=306 y=76.5
Entry  Wed Oct 5 20:49:11 2011, Markus Friedl, BELLE, Origami stack cooled, run009, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
Entry  Thu Oct 6 09:22:34 2011, Christian Irmler, BELLE, Origami stack cooled, run010, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
Entry  Wed Oct 5 20:28:00 2011, Markus Friedl, BELLE, Origami stack cooled, run008, 10582, 05.10.2011 20:25:10, 05.10.2011 20:45:10, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on
Entry  Wed Oct 5 19:57:15 2011, Christian Irmler, BELLE, Origami stack cooled , run007, 17845, 05.10.2011 18:27:51, 05.10.2011 19:31:43, Crap 
Run stopped after 17845 events, because of bad trigger timing

Origami6
Entry  Wed Oct 5 17:54:09 2011, Christian Irmler, BELLE, Origami stack cooled, cal007, 83800, 05.10.2011 17:51:57 , , Good 
I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low
Origami6
HV=+-40V
Entry  Wed Oct 5 16:43:00 2011, Christian Irmler, BELLE, Origami stack cooled, cal006, 83800, 05.10.2011 16:40:18, 05.10.2011 17:12:27, Good 
Origami6
HV=+-40V
beam on
Entry  Wed Oct 5 13:00:41 2011, Christian Irmler, BELLE, Origami stack cooled , run006, 24692, 05.10.2011 12:55:53, 05.10.2011 14:05:49, Crap 
Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo
Origami6
HV=+-40V
Entry  Wed Oct 5 12:09:00 2011, Christian Irmler, BELLE, Origami stack cooled wrong I2C settings, cal005, 83800, 05.10.2011 12:04:50, 05.10.2011 12:37:11, Crap 
This calibration file can not be used, due to wrong I2C settings!
Origami6
HV=+-40V
Entry  Mon Mar 5 19:27:56 2012, Christian Irmler, BELLE, Origami Module #4, run111, 50k, 05.03.2012 19:26:28, , Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,30µA
Entry  Mon Mar 5 19:06:41 2012, Christian Irmler, BELLE, Origami Module #4, cal110, 83800, 05.03.2012 19:05:52, 05.03.2012 19:17:01, Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 18:41:23 2012, Christian Irmler, BELLE, Origami Module #4, run110, 100k, 05.03.2012 18:45:21, 05.03.2012 19:04:30, Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 18:08:02 2012, Christian Irmler, BELLE, Origami Module #4, cal109, 83800, 05.03.2012 18:07:40, 05.03.2012 18:18:32, Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 17:36:46 2012, Christian Irmler, BELLE, Origami Module #4, run109, 100k, 05.03.2012 17:36:19 , 05.03.2012 17:55:24 , Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 17:35:31 2012, Christian Irmler, BELLE, Origami Module #4, cal108, 83800, 05.03.2012 16:47:51, 05.03.2012 17:05:16, Unknown run108-109.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Tue Oct 4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011 22:09:37, 05.10.2011 09:11:54, Crap 
Origami6
HV=+-40V, no cooling
beam on
Entry  Tue Oct 4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011 21:18:09, 04.10.2011 21:50:23, Good 
Origami6
HV=+-40V, no cooling
beam on
Entry  Tue Oct 4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011 11:29:19, 04.10.2011 13:57:54, Good 
hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD
Position of HEPHY x-z-table:
x = 336
Entry  Tue Oct 4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011 10:33:50, 04.10.2011 10:48:51,  
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced