Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 3 of 5  Not logged in ELOG logo
ID Datedown Author Project Subject Run Number Events StartTime EndTime Data Text Attachments
  54   Sat Oct 8 23:27:44 2011 Karl-Heinz HoffmannHPKbaby_stdrun02038200008.10.2011 23:24:1609.10.2011 09:24:20Goodno cooling
beam on; xy table position x=327,5 
y=65
  
  53   Sat Oct 8 20:33:58 2011 Karl-Heinz HoffmannHPKbaby_stdrun01915000008.10.2011 20:22:4508.10.2011 23:19:23Goodno cooling
beam on; xy table position x=333 
y=80
  
  52   Sat Oct 8 16:45:14 2011 Thomas BergauerHPKbaby_stdrun01815000008.10.2011 16:44:1308.10.2011 19:33:33Goodno cooling
beam on; xy table position x=322 
y=80
  
  51   Sat Oct 8 16:35:04 2011 Thomas BergauerHPKbaby_stdrun017 08.10.2011 16:26:10 Crapwrong timing
 
no cooling
  
  50   Sat Oct 8 14:33:25 2011 Thomas BergauerHPKbaby_stdrun016250k08.10.2011 14:31:40 Crapfalsches config file (single statt
multi6)
 
  
  49   Sat Oct 8 09:30:44 2011 Christian IrmlerBELLECooling plant tests  08.10.2011 09:30 UnknownSoftware run with 6 samples to ensure that
APV chips dissipate full power.
DAQ data not saved, bias current
 biascurrent_cooling_test1.jpgtemp_cooling_test1.jpg 
  48   Sat Oct 8 00:14:37 2011 Christian IrmlerBELLEOrigami stackrun01518011108.10.2011 00:06:4108.10.2011 08:24:38GoodOrigami6
HV=+-40V, 
no cooling
  
  47   Fri Oct 7 19:35:14 2011 Christian IrmlerBELLEOrigami stack cooledrun01490k07.10.2011 19:49:2607.10.2011 23:26:52GoodOrigami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9
  
  46   Fri Oct 7 18:40:07 2011 Christian IrmlerBELLEOrigami stack cooledcal0098380007.10.2011 18:35:04 07.10.2011 19:31:51GoodOrigami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9
  
  45   Fri Oct 7 18:28:53 2011 Christian Irmlercommonrun schedule    Unknown   run_schedule.pdfrun_schedule.xlsx 
  44   Fri Oct 7 10:13:12 2011 Christian IrmlerBELLEOrigami stack cooledrun013185k07.10.2011 10:02:2007.10.2011 17:17:32GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  43   Fri Oct 7 00:20:15 2011 Christian IrmlerBELLEOrigami stack cooledrun012250k07.10.2011 00:15:54 07.10.2011 09:13:55GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  42   Thu Oct 6 17:36:47 2011 Christian IrmlerBELLEOrigami stack cooledrun01118000006.10.2011 17:06:3807.10.2011 00:04:06GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  41   Thu Oct 6 15:57:51 2011 Christian IrmlerBELLEOrigami stack cooledcal0088380006.10.2011 15:53:2006.10.2011 16:25:29 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  40   Thu Oct 6 09:22:34 2011 Christian IrmlerBELLEOrigami stack cooledrun010330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  39   Wed Oct 5 20:49:11 2011 Markus FriedlBELLEOrigami stack cooledrun009330k05.10.2011 20:46:3006.10.2011 09:12:24 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  38   Wed Oct 5 20:28:00 2011 Markus FriedlBELLEOrigami stack cooledrun0081058205.10.2011 20:25:1005.10.2011 20:45:10GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9
g/s
  
  37   Wed Oct 5 19:57:15 2011 Christian IrmlerBELLEOrigami stack cooled run0071784505.10.2011 18:27:5105.10.2011 19:31:43CrapRun stopped after 17845 events,
because of bad trigger timing
  
  36   Wed Oct 5 19:33:40 2011 Markus FriedlcommonTrigger condition  4.10.2011 15:00  Changed trigger such that off-spill scintillator
triggers are vetoed.
Inserted Flip-Flop which is set by
 trigger_path_with_veto.png 
  35   Wed Oct 5 17:54:09 2011 Christian IrmlerBELLEOrigami stack cooledcal0078380005.10.2011 17:51:57  GoodI2C setting modified to improve the shape
of the p-side signal --> shaping time
reduced, pulse height still low
  
ELOG V3.1.5-fc6679b