| ID | 
Date | 
Author | 
Project | 
Subject | 
Run Number | 
Events | 
StartTime  | 
EndTime | 
Data | 
Text | 
  | 
| 
  38  
 | 
Fri Oct 19 00:56:16 2012 | 
Markus Friedl | MicronOrigami_gross | run | run017 | 197899 | 19.10.2012  00:54:21 | 19.10.2012  14:10:02  | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, 
wedge new #2
 
HV = +-50V, Ibias=76A | 
   | 
| 
  37  
 | 
Fri Oct 19 00:45:52 2012 | 
Markus Friedl | MicronOrigami_gross | run | run016 | 11855 | 19.10.2012  00:24:05 | 19.10.2012  00:48:24 | Crap |  
 
Belle Stack 4: 2 DSSD -z, Origami 
#3, #1, wedge new #2 | 
   | 
| 
  35  
 | 
Wed Oct 17 21:30:39 2012 | 
Markus Friedl | MicronOrigami_gross | cal | cal008 | 83800 | 17.10.2012  17:15:13 | 17.10.2012  18:08:11 | Good | Internal calibration for "stealth 
parasitic" mode Belle stack; taken without 
beam | 
     | 
| 
  33  
 | 
Wed Oct 17 05:16:22 2012 | 
Christian Irmler | MicronOrigami_gross | run | run015 | 54005 | 17.10.2012  05:10:06 | 17.10.2012  07:27:20 | Unknown | Origami Stack 2: Origami #4, #3, Wedge 
new1, old
 
HV = +-50V | 
    | 
| 
  31  
 | 
Tue Oct 16 23:35:28 2012 | 
Christian Irmler | MicronOrigami_gross | run | run014 | 150k | 16.10.2012  23:32:24 | 17.10.2012  04:59:02  | Unknown | Same as run011, but now with +- 50V bias 
voltage.
 
Origami Stack 2: Origami #4, #3, | 
    | 
| 
  29  
 | 
Tue Oct 16 22:19:21 2012 | 
Christian Irmler | MicronOrigami_gross | cal | cal007 | 83800 | 16.10.2012  20:25:17  | 16.10.2012  21:12:01  | Unknown | Origami Stack 2: Origami #4, #3, Wedge 
new1, old
 
HV = +-50V, Ibias=12.3µA | 
   | 
| 
  28  
 | 
Tue Oct 16 13:59:46 2012 | 
Christian Irmler | MicronOrigami_gross | run | run013 | 150k | 16.10.2012  13:43:05 | 16.10.2012  20:21:04 | Unknown | Origami Stack 2: Origami #4, #3, Wedge 
new1, old
 
HV = +-50V | 
    | 
| 
  27  
 | 
Tue Oct 16 11:23:43 2012 | 
Christian Irmler | MicronOrigami_gross | run | run012 | 20k | 16.10.2012  11:16:01 | 16.10.2012  12:27:03  | Unknown | Origami Stack 2a: Origami #4, Wedge new1
 
reading out all 6 APV of p-side
 
HV = +-40V, Ibias=10.4µA | 
    | 
| 
  26  
 | 
Tue Oct 16 11:07:17 2012 | 
Christian Irmler | MicronOrigami_gross | cal | cal006 | 83800 | 16.10.2012  10:30:34 | 16.10.2012  11:00:51 | Unknown | Origami Stack 2a: Origami #4, Wedge new1
 
reading out all 6 APV of p-side
 
HV = +-40V, Ibias=5.12µA | 
   | 
| 
  25  
 | 
Tue Oct 16 05:24:21 2012 | 
Christian Irmler | MicronOrigami_gross | run ATTENTION: wrong bias voltage | run011 | 150k | 16.10.2012  05:19:28  | 16.10.2012  09:59:24 | Crap | ATTENTION: Bias voltage was +-100 V instead 
of +- 50 V
 
Origami Stack 2: Origami #4, #3, | 
   | 
| 
  32  
 | 
Wed Oct 17 01:21:50 2012 | 
Marko Dragicevic | Infineon | run | run009 | 150k | 15.10.2012 08:20:15 | 15.10.2012 11:01:11 | Unknown |  This run was not recorded in original 
sequence in the ELOG!!!
 
  | 
   | 
| 
  19  
 | 
Mon Oct 15 00:08:26 2012 | 
Marko Dragicevic | Infineon | run | run008 | 339075 | 15.10.2012 01:49:33 | 15.10.2012 08:04:24 | Unknown |  Infineon Stack Version 
2 (no height information, BabyStrips vertical | 
   | 
| 
  24  
 | 
Mon Oct 15 23:26:52 2012 | 
Marko Dragicevic | MicronOrigami_gross | run ATTENTION: wrong bias voltage | run010 | 158k | 15.10.2012  23:10:40  | 16.10.2012  05:05:35 | Crap | ATTENTION: Bias voltage was +-100 V instead 
of +- 50 V
 
Same as run009. | 
   | 
| 
  23  
 | 
Mon Oct 15 22:13:28 2012 | 
Marko Dragicevic | MicronOrigami_gross | cal ATTENTION: wrong bias voltage  | cal005 | 83800 | 15.10.2012  22:16:26 | 15.10.2012  23:07:37  | Unknown | ATTENTION: Bias voltage was +-100 V instead 
of +- 50 V
 
Origami Stack 2: Origami #4, #3, | 
   | 
| 
  22  
 | 
Mon Oct 15 19:40:03 2012 | 
Marko Dragicevic | MicronOrigami_gross | run ATTENTION: wrong bias voltage | run009 | 31650 | 15.10.2012  19:28:30  | 15.10.2012  22:08:31  | Crap | ATTENTION! Bias voltage was +-100 V instead 
of +-50 V 
 
Origami Stack 2: Origami #4, #3, | 
   | 
| 
  18  
 | 
Sun Oct 14 23:01:11 2012 | 
Marko Dragicevic | Infineon | cal | cal004 | 83800 | 14.10.2012 21:44:00 | 14.10.2012 21:03:00 | Unknown | Infineon Stack Version 1 (with height information, 
BabyStrips horizontal Strixel vertical)
 
HV = 300V   I=3.1 uA | 
   | 
| 
  17  
 | 
Sun Oct 14 20:12:14 2012 | 
Marko Dragicevic | Infineon | run | run007 | 110k | 14.10.2012 20:07:12 | 14.10.2012 21:04:12 | Unknown | Infineon Stack Version 1 (with height information, 
BabyStrips horizontal Strixel vertical)
 
HV = 300V   I=3uA | 
   | 
| 
  16  
 | 
Sun Oct 14 09:08:42 2012 | 
Manfred Valentan | MicronBaby | run | run006 | 300k | 14.10.2012  09:01:15 |   | Unknown | Micron baby intermediate stack
 
HV = -100V   I=6.9uA
 
beam on | 
   | 
| 
  15  
 | 
Sun Oct 14 08:25:10 2012 | 
Manfred Valentan | MicronBaby | cal | cal003 | 83800 | 14.10.2012  08:21:46 | 14.10.2012  08:51:58 | Unknown | Micron baby intermediate stack
 
HV = -100 V
 
I = 6.9 uA | 
   | 
| 
  14  
 | 
Sun Oct 14 02:02:39 2012 | 
Manfred Valentan | MicronBaby | run | run005 | 300k | 14.10.2012  02:00:08 | 14.10.2012  08:17:02 | Unknown | Micron baby intermediate stack
 
HV = -100V   I=6.3uA
 
beam on | 
   |