| ID | 
Date | 
Author | 
Project | 
Subject | 
Run Number | 
Events | 
StartTime  | 
EndTime | 
Data | 
Text | 
  | 
| 
  12  
 | 
Sat Oct 13 23:04:22 2012 | 
Markus Friedl | MicronOrigami_gross | cal | cal002 | 83800 | 13.10.2012  23:03:18 | 13.10.2012  22:57:48 | Unknown | Belle stack 3 (2-DSSD, Micron new, Micron 
old)
 
HV = +-50V   I=10.5A  | 
   | 
| 
  11  
 | 
Sat Oct 13 23:01:54 2012 | 
Markus Friedl | MicronOrigami_gross | run with Belle stack 3 | run004 | 30k | 13.10.2012  21:41:34 | 13.10.2012  22:57:48 | Unknown | Belle stack 3, other position (CE)
 
 
 
Position of xy table: | 
   | 
| 
  9  
 | 
Sat Oct 13 19:04:02 2012 | 
Manfred Valentan | MicronOrigami_gross | run with Belle stack 3 | run003 | 30k | 13.10.2012  19:02:31 |   | Unknown |  Belle stack 3: 2DSSD-Origami, Wedge_New_1, 
Wedge_old
 
HV = +- 50V | 
   | 
| 
  7  
 | 
Sat Oct 13 06:55:47 2012 | 
Manfred Valentan | MicronBaby | run | run002 | 234019 | 13.10.2012  06:50:00 | 13.10.2012  13:50:40 | Unknown | Micron baby stack
 
HV = -100V   I=5.4uA
 
beam on | 
   | 
| 
  4  
 | 
Fri Oct 12 23:10:14 2012 | 
Christian Irmler | MicronBaby | run | run001 | 333000 | 12.10.2012  23:05:19 | 13.10.2012  06:29:00 | Good | Micron baby stack
 
HV = -100V   I=5.8uA
 
beam on | 
   | 
| 
  3  
 | 
Fri Oct 12 22:00:52 2012 | 
Christian Irmler | MicronBaby | cal | cal001 | 83800 | 12.10.2012  21:16:33 | 12.10.2012  21:59:02 | Good | 12.10.2012  21:16:33  event=0  
Disk space: Needed=0.00 GB, Available=206.59 
GB, Total=931.51 GB | 
   | 
| 
  1  
 | 
Fri Oct 12 15:04:55 2012 | 
Marko Dragicevic | common | Network configuration |   |   |   |   | Unknown | Router:
 
IP 137.138.113.230
 
Hostname ROUTERHEPHY.cern.ch | 
   | 
| 
  2  
 | 
Fri Oct 12 19:42:36 2012 | 
Christian Irmler | MicronBaby | Configuration of normal stack |   |   |   |   | Unknown | Micron baby stack with all strips connected 
to APV chips
 
n-side faces the beam, p-side not | 
    | 
| 
  5  
 | 
Fri Oct 12 23:51:35 2012 | 
Markus Friedl | common | Zimmernummer & Telefonnummern |   |   |   |   | Unknown | 2nd week:
 
Markus: 38 - 420   (phone: 70 
420) | 
   | 
| 
  6  
 | 
Fri Oct 12 23:52:57 2012 | 
Markus Friedl | common | Sozialisierung |   |   |   |   | Unknown | Prost, Bergi!
 
(Das ist nur ein Test, ob du wirklich 
all die Elog-Emails liest.) | 
   | 
| 
  8  
 | 
Sat Oct 13 14:44:47 2012 | 
Manfred Valentan | MicronOrigami_gross | Stack configuration, Belle Stack 3 |   |   |   |   | Unknown | Module in Beamrichtung:
 
2-DSSD Origami  -z
 
2-DSSD Origami ce | 
   | 
| 
  10  
 | 
Sat Oct 13 19:04:23 2012 | 
Markus Friedl | MicronOrigami_gross | CO2 cooling |   |   |   |   | Unknown | Wir haben ja schon seit langem vermutet, 
dass man mit reiner Gasphase nicht kühlen 
kann. Jetzt erbringen wir den experimentellen | 
   | 
| 
  13  
 | 
Sun Oct 14 02:00:12 2012 | 
Manfred Valentan | MicronBaby | Configuration of intermediate stack |   |   |   |   | Unknown | Micron baby stack with every other strip 
connected to APV chips
 
n-side faces the beam, p-side not | 
   | 
| 
  20  
 | 
Mon Oct 15 18:52:18 2012 | 
Marko Dragicevic | MicronOrigami_gross | Stack configuration, Belle Stack 2 |   |   |   |   | Unknown | Belle stack 2:
 
Modules:
 
 
    Origami #4
 
    Origami | 
   | 
| 
  21  
 | 
Mon Oct 15 19:21:56 2012 | 
Marko Dragicevic | common | Beam settings and profile |   |   |   |   | Unknown | Beam setting file:
 
H6A.804: FM HAD (H8=+180, H6=120@0mrad) 
PARALL IN H6A; RD42 | 
    | 
| 
  30  
 | 
Tue Oct 16 23:03:09 2012 | 
Markus Friedl | common | Sozialisierung |   |   |   |   | Unknown | So steuert man einen Testbeam!
 
 | 
     | 
| 
  34  
 | 
Wed Oct 17 14:06:24 2012 | 
Markus Friedl | MicronOrigami_gross | Stack für stealth parasitic mode |   |   |   |   | Good | Dieser Stack wird jetzt quasi als Pausenkasperl 
eingebaut und läuft im "stealth 
parasitic" mode während der Irradiation-Woche. | 
     | 
| 
  36  
 | 
Thu Oct 18 09:14:07 2012 | 
Manfred Valentan | common | Fahrt nach Mol |   |   |   |   | Unknown |  Liebe Kollegen,
 
wir brechen. auf. Wünscht uns 
Glück! | 
   | 
| 
  59  
 | 
Wed Oct 24 17:24:40 2012 | 
Thomas Bergauer | MicronOrigami_gross | run ohne Strom ;-( | run028 |   |   |   | Unknown |  
 
Belle Stack 4: 2 DSSD -z, Origami 
#3, #1, wedge new #2 | 
   | 
| 
  80  
 | 
Wed Oct 31 15:54:59 2012 | 
Christian Irmler | common | Ethernetkabel zu H6A |   |   |   |   | Unknown | Ethernetkabel HNA447 -> H6A:
 
Das obere Ende im Counting Hut liegt 
im Zwischenboden unterhalb der orangenen | 
     |