71
|
Sat Aug 22 15:12:44 2009 |
Thomas Bergauer | common | beam profile | | | | |
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)
Particle Production Applet
Calculator applet
For +120 Gev/c beam:
Pi+ |
55.67 % |
p |
38.95 % |
K+ |
5.38 % |
|
Attachment 1: 20090822_1511_beam_conditions.jpg
|
 |
80
|
Sun Aug 23 13:15:42 2009 |
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run | | | | |
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!!
after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again
Current of ITE512 plus 2 SiLC08 modules
HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable
|
Attachment 1: IandRH_first_Pt_run.png
|
 |
Attachment 2: Picture_1.png
|
 |
84
|
Sun Aug 23 23:38:27 2009 |
Georg Auzinger | | Phone numbers | | | | |
Georg #70
Wolfgang - Building: 41, Room: 204, Tel: ?
Manfred: Building 38, Room 522, Tel: 70522
Chrisu: B39, room 309, Tel: 79309
Bergi: Tel Zimmer: 79112, Handy: 16-2471
Maks: Tel Zimmer: 79117 |
94
|
Tue Aug 25 09:00:51 2009 |
Thomas Bergauer | | beam conditions | | | | |
manually changed TRIM3, TRIM4 and TRIM6 |
Attachment 1: magnet_settings_withH6B.802.jpg
|
 |
Attachment 2: 20090825_0859_beam_conditions.jpg
|
 |
106
|
Wed Aug 26 14:26:13 2009 |
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 | | | |
Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. |
Attachment 1: sn-pos_h13-h14_strips_pa_5bins.pdf
|
107
|
Wed Sep 2 14:15:17 2009 |
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 | | | |
Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise. |
Attachment 1: stripcorr_modall_thrs3_ktau.pdf
|
114
|
Fri Dec 4 12:21:56 2009 |
Wolfgang Kiesenhofer | | ITE128 strip correlation kendall tau (preliminary result) | | | | |
Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14), module 6 (standard sensor 2 / h12)
|
Attachment 1: stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdf
|
Attachment 2: stripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdf
|
Attachment 3: stripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf
|
16
|
Wed Aug 19 15:37:37 2009 |
Christian Irmler | ITE128 | internal calibration | cal001 | | 15:31:29 | |
8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline = PAD modules |
18
|
Wed Aug 19 20:43:14 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009 20:42:08 | 19.08.2009 22:54:21 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 154.0979
ITE128 shooting into strips w/o pitch adapter, low position |
19
|
Wed Aug 19 22:56:07 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009 22:54:23 | 20.08.2009 00:11:31 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 144.3099
ITE128 shooting into strips w pitch adapter, upper position |
32
|
Thu Aug 20 15:50:58 2009 |
Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs | | 20.08.09 10:36 | 4h 43m 52s later |
blue graph: h03
white graph: h04 |
Attachment 1: slow_control_alignment_sensors.gif
|
 |
21
|
Thu Aug 20 00:16:45 2009 |
Christian Irmler | ITE128 | pedestal correction | pedcorr001 | | 20.08.2009 00:14:21 | 20.08.2009 00:24:28 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction
beam on
|
22
|
Thu Aug 20 00:31:45 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009 00:27:36 | |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 139.3100
ITE128 shooting into strips w pitch adapter, upper edge of sensor |
23
|
Thu Aug 20 10:48:39 2009 |
Christian Irmler | alignment_beam | internal calibration | cal002 | | 20.08.2009 10:49:07 | 20.08.2009 10:59:43 |
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
no beam
module 1 (h03) is used w inverter off and higher base line |
24
|
Thu Aug 20 11:05:26 2009 |
Christian Irmler | alignment_beam | pedeatal correction | pedcorr002 | | 20.08.2009 11:05:41 | 20.08.2009 11:09:35 |
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
beam on
module 1 (h03) is used w inverter off and higher base line |
25
|
Thu Aug 20 11:23:04 2009 |
Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009 11:09:50 | 20.08.2009 11:25:16 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:141.3 (center- center, point 1) |
26
|
Thu Aug 20 11:38:11 2009 |
Christian Irmler | alignment_beam | top center, point 7 | run6861 (+6862) | 10600 | 20.08.2009 11:36:35 | 20.08.2009 11:53:51 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:121.3 (top center, point 7) |
27
|
Thu Aug 20 12:18:40 2009 |
Christian Irmler | alignment_beam | top left on sensor, point 2 | run6863 (telescope 6864) | 10600 | 20.08.2009 12:07:28 | 20.08.2009 12:25:57 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:57 y:121.3 (top left on sensor in beam direction) |
28
|
Thu Aug 20 12:35:13 2009 |
Christian Irmler | alignment_beam | top right on sensor, point 3 | run6865 | 10600 | 20.08.2009 12:31:35 | 20.08.2009 12:48:04 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:43 y:121.3 (top right on sensor in beam direction) |
29
|
Thu Aug 20 12:50:59 2009 |
Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009 12:51:04 | 20.08.2009 13:05:01 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:43 y:155 (bottom right on sensor in beam direction) |