  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Events StartTimeup EndTime
  103   Tue Aug 25 20:21:31 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent moderun0428518925.08.2009 20:18:1826.08.2009 01:27:12

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

  97   Tue Aug 25 11:26:23 2009 Thomas BergauerPt_ITE512Pt_ITE512 6deg NO air!run03620k25.08.2009 11:2525.08.2009 12:19:55

Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD

  100   Tue Aug 25 15:33:07 2009 Marko DragicevicPt_ITE512Pt_ITE512 12deg NO air! run03920k25.08.2009 15:3525.08.2009 17:10

Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36
  102   Tue Aug 25 18:22:25 2009 Manfred ValentanPt_ITE512Pt_ITE512 40deg NO air! (for calibration)run04110k25.08.2009 18:20:3025.08.2009

Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36
  104   Wed Aug 26 01:32:25 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun04310060026.08.2009 01:46:38 26.08.2009 07:10:14

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

  105   Wed Aug 26 07:19:42 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun0441350426.08.2009 07:18:1926.08.2009 08:46:11 (beam shut down @ 8:00)

Belle DUT, HV=80V,  31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 