| ID | 
Date | 
Author | 
Project | 
Subject | 
Run Number | 
Events | 
StartTime | 
EndTime  | 
| 
  90  
 | 
Mon Aug 24 18:30:07 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09  20:37:04 | 
Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  | 
| 
  83  
 | 
Sun Aug 23 17:19:50 2009 | 
Christian Irmler | Pt_ITE512 | internal calibration | cal011 |   | 23.08.2009  16:30:43 | 23.08.2009  17:02:14 | 
Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  | 
| 
  79  
 | 
Sun Aug 23 08:13:31 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009  08:06:58 | 23.08.2009  09:30:53 | 
ITE128 
HV = 70V, 40MHz, 120 GeV 
TLU trigger w telescope  
XY-Table: x=48, y=111.31  | 
| 
  78  
 | 
Sun Aug 23 02:18:20 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009  02:16:21 | 23.08.2009  08:04:09 | 
ITE128 
HV = 70V, 40MHz, 120 GeV 
TLU trigger w telescope  
XY-Table: x=48, y=112.31  | 
| Attachment 1: Picture_1.png
 | 
  | 
| 
  77  
 | 
Sun Aug 23 01:46:03 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009  02:15:10 | 
ITE128 
HV = 70V, 40MHz, 120 GeV 
TLU trigger w telescope  
XY-Table: x=48, y=115.31 
new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture  | 
| Attachment 1: Picture_1.png
 | 
  | 
| 
  76  
 | 
Sat Aug 22 23:06:22 2009 | 
Christian Irmler | BELLE | pedestal correction 40 MHz  transparent mode + cooling | pedcorr007 |   | 22.08.2009  23:04:29 | 22.08.2009  23:13:51 | 
Belle DUT, HV=80V, 40 MHz, beam off 
1 sample, transparent mode 
pedestal correction 
chiller set to 13 deg, 2900 rpm  | 
| 
  74  
 | 
Sat Aug 22 19:19:20 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009  19:17:29 | 22.08.2009  22:09:53 | 
Belle DUT, HV=80V, 40 MHz, 120 GeV 
6 samples, transparent mode 
chiller set to 13 deg,  2900 rpm 
 
water flow checked befor start of run  | 
| 
  73  
 | 
Sat Aug 22 15:52:33 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run019 | 75k | 22.08.2009  15:50:40 | 22.08.2009  19:14:21 | 
Belle DUT, HV=80V, 31.8 MHz, 120 GeV 
6 samples, transparent mode 
chiller set to 13 deg,  2900 rpm 
 
water flow checked befor start of run  | 
| 
  72  
 | 
Sat Aug 22 15:28:00 2009 | 
Christian Irmler | BELLE | pedestal correction 31.8 MHz  transparent mode + cooling | pedcorr006 |   | 22.08.2009  15:25:35 | 22.08.2009  15:36:00 | 
Belle DUT, HV=80V, 31.8 MHz, beam off 
1 sample, transparent mode 
pedestal correction 
chiller set to 13 deg, 2900 rpm  | 
| 
  70  
 | 
Sat Aug 22 14:46:12 2009 | 
Christian Irmler | BELLE | internal calibration 31.8 MHz  transparent mode + cooling | cal009 |   | 22.08.2009  14:43:55 | 22.08.2009  15:22:37 | 
Belle DUT, intcal 
HV=80V, 31.8 MHz, beam off 
1 sample, transparent mode 
cooling 
chiller set to 13 deg. 
Since there was no (or to less) water flow through the small pipe of the origami module, all previous runs with cooling must be repeated. 
Bypass removed to achieve better watter flow at the module! 
Chiller pump is set to 2800 rpm  | 
| 
  69  
 | 
Sat Aug 22 13:34:14 2009 | 
Christian Irmler | BELLE | pedestal correction 31.8 MHz  transparent mode (cooling?) | pedcorr005 |   | 22.08.2009  13:31:27 | 22.08.2009  13:41:42 | 
Belle DUT, intcal 
HV=80V, 31.8 MHz, beam off 
1 sample, transparent mode 
chiller set to 13 deg. 
 
external 31.8 MHz clock 
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated!  | 
| 
  68  
 | 
Sat Aug 22 13:30:28 2009 | 
Christian Irmler | BELLE | internal calibration 31.8 MHz  transparent mode (cooling?) | cal008 |   | 22.08.2009  12:50:48 | 22.08.2009  13:29:25 | 
Belle DUT, intcal 
HV=80V, 31.8 MHz, beam off 
1 sample, transparent mode 
chiller set to 13 deg. 
external 31.8 MHz clock 
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated  | 
| 
  66  
 | 
Sat Aug 22 12:12:34 2009 | 
Christian Irmler | BELLE | internal calibration 40 MHz  transparent mode (cooling?) | cal007 |   | 22.08.2009  12:10:32  | 22.08.2009  12:49:09 | 
Belle DUT, intcal 
HV=80V, 40 MHz, beam off 
1 sample, transparent mode 
chiller set to 13 deg. 
external 40 MHz clock 
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated  | 
| 
  64  
 | 
Sat Aug 22 11:26:00 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run018 | 75k | 22.08.2009  11:16:57 | 22.08.2009  11:58:56 | 
 HV=80V, 40 MHz, beam on, 120 GeV 
6 samples, hit mode, hitcut=5 
chiller set to 13 deg. 
  
f=40 MHz 
config file: cern09_belle_hit_cut5_multi6.cfg 
  
trigger rate about 3500 ev / spill 
  
there was probably no water flow throught the pipe of the origami module during this run! 
  | 
| 
  63  
 | 
Sat Aug 22 10:28:50 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run017 | 75k | 22.08.2009  10:26:28 | 22.08.2009  11:16:12 | 
 HV=80V, 40 MHz, beam on, 120 GeV 
6 samples, hit mode, hitcut=4 
chiller set to 13 deg. 
  
f=40 MHz 
config file: cern09_belle_hit_multi6.cfg 
  
there was probably no water flow throught the pipe of the origami module during this run! 
  | 
| 
  62  
 | 
Sat Aug 22 09:44:50 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run016 | 75k | 22.08.2009  09:42:38 | 22.08.2009  10:24:05 | 
 HV=80V, 31.8 MHz, beam on, 120 GeV 
6 samples, hit mode, hitcut=5 
chiller set to 13 deg. 
  
f=31.8 MHz 
config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg 
  
there was probably no water flow throught the pipe of the origami module during this run! 
  | 
| 
  61  
 | 
Sat Aug 22 08:32:02 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009  08:15:05 | 22.08.2009  09:25:21 | 
 HV=80V, 31.8 MHz, beam on, 120 GeV 
6 samples, hit mode, hitcut=4 
chiller set to 13 deg. 
  
f=31.8 MHz 
config file: cern09_belle_31.8mhz_hit_multi6.cfg 
  
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated 
  | 
| 
  60  
 | 
Sat Aug 22 03:27:13 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009  03:25:23 | 22.08.2009  07:08:09 | 
 HV=80V, 31.8 MHz, beam on, 120 GeV 
6 samples 
chiller set to 13 deg. 
  
f=31.8 MHz 
config file: cern09_belle_31.8mhz_multi6.cfg 
  
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated 
  | 
| 
  59  
 | 
Sat Aug 22 01:06:34 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009  23:49:38  | 22.08.2009  03:21:48 | 
Belle DUT, tranparent mode 
HV=80V, 40 MHz, beam on, 120 GeV 
6 samples 
chiller set to 13 deg. 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm 
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) 
APVDAQ and telescope runs are not synchronized 
trigger rate: about 300 - 500 ev / spill 
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated  | 
| 
  57  
 | 
Fri Aug 21 18:35:13 2009 | 
Christian Irmler | BELLE | APVDAQ  + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009  18:31:01 | 21.08.2009  23:25:03 | 
4 Belle DUTs 
HV=80V, 31.8 MHz, 6 sample, 120 GeV 
external clock source 
transparent mode 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm 
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) 
APVDAQ and telescope runs are not synchronized  |