| ID | 
Date | 
Author | 
Project | 
Subject | 
Run Number | 
Events | 
StartTime | 
EndTime  | 
| 
  29  
 | 
Thu Aug 20 12:50:59 2009 | 
Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009  12:51:04 | 20.08.2009  13:05:01 | 
2 alignement modules 
location in beam direction: h04-h03 
beam in center of sensor 
HV=70V, 40MHz, 6 samples 
beam on, 120 GeV 
module 1 (h03) is used w inverter off and higher base line 
XY coordinates: X:43 y:155 (bottom right on sensor in beam direction)  | 
| 
  28  
 | 
Thu Aug 20 12:35:13 2009 | 
Christian Irmler | alignment_beam | top right on sensor, point 3 | run6865 | 10600 | 20.08.2009  12:31:35 | 20.08.2009  12:48:04 | 
2 alignement modules 
location in beam direction: h04-h03 
beam in center of sensor 
HV=70V, 40MHz, 6 samples 
beam on, 120 GeV 
module 1 (h03) is used w inverter off and higher base line 
XY coordinates: X:43 y:121.3 (top right on sensor in beam direction)  | 
| 
  27  
 | 
Thu Aug 20 12:18:40 2009 | 
Christian Irmler | alignment_beam | top left on sensor, point 2 | run6863 (telescope 6864) | 10600 | 20.08.2009  12:07:28 | 20.08.2009  12:25:57 | 
2 alignement modules 
location in beam direction: h04-h03 
beam in center of sensor 
HV=70V, 40MHz, 6 samples 
beam on, 120 GeV 
module 1 (h03) is used w inverter off and higher base line 
XY coordinates: X:57 y:121.3 (top left on sensor in beam direction)  | 
| 
  26  
 | 
Thu Aug 20 11:38:11 2009 | 
Christian Irmler | alignment_beam | top center, point 7 | run6861 (+6862) | 10600 | 20.08.2009  11:36:35 | 20.08.2009  11:53:51 | 
2 alignement modules 
location in beam direction: h04-h03 
beam in center of sensor 
HV=70V, 40MHz, 6 samples 
beam on, 120 GeV 
module 1 (h03) is used w inverter off and higher base line 
XY coordinates: X:50 y:121.3 (top center, point 7)  | 
| 
  25  
 | 
Thu Aug 20 11:23:04 2009 | 
Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009  11:09:50  | 20.08.2009  11:25:16 | 
2 alignement modules 
location in beam direction: h04-h03 
beam in center of sensor 
HV=70V, 40MHz, 6 samples 
beam on, 120 GeV 
module 1 (h03) is used w inverter off and higher base line 
XY coordinates: X:50 y:141.3 (center- center, point 1)  | 
| 
  24  
 | 
Thu Aug 20 11:05:26 2009 | 
Christian Irmler | alignment_beam | pedeatal correction | pedcorr002 |   | 20.08.2009  11:05:41 | 20.08.2009  11:09:35 | 
2 alignement modules 
location in beam direction: h04-h03 
HV=70V, 40MHz, 1 sample 
beam on 
module 1 (h03) is used w inverter off and higher base line  | 
| 
  23  
 | 
Thu Aug 20 10:48:39 2009 | 
Christian Irmler | alignment_beam | internal calibration | cal002 |   | 20.08.2009  10:49:07 | 20.08.2009  10:59:43 | 
2 alignement modules 
location in beam direction: h04-h03 
HV=70V, 40MHz, 1 sample 
no beam  
module 1 (h03) is used w inverter off and higher base line  | 
| 
  21  
 | 
Thu Aug 20 00:16:45 2009 | 
Christian Irmler | ITE128 | pedestal correction | pedcorr001 |   | 20.08.2009  00:14:21 | 20.08.2009  00:24:28 | 
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2 
HV = 70V, 40MHz 
pedestal correction 
beam on 
   | 
| 
  19  
 | 
Wed Aug 19 22:56:07 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009  22:54:23 | 20.08.2009  00:11:31 | 
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2 
HV = 70V, 40MHz, 120 GeV 
TLU trigger, w/o telescope 
9x9 mm beam spot 
height (y) = 144.3099 
ITE128 shooting into strips w pitch adapter, upper position  | 
| 
  18  
 | 
Wed Aug 19 20:43:14 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009  20:42:08 | 19.08.2009  22:54:21 | 
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2 
HV = 70V, 40MHz, 120 GeV 
TLU trigger, w/o telescope 
9x9 mm beam spot 
height (y) = 154.0979 
ITE128 shooting into strips w/o pitch adapter, low position  | 
| 
  50  
 | 
Fri Aug 21 12:22:43 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009  12:53:02 |  21.08.2009  13:35:01 | 
4 Belle DUTs 
HV=80V, 31.8 MHz, 6 sample, 120 GeV 
switched to external clock source 
processed mode, hit cut = 4 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors) 
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)  | 
| 
  1  
 | 
Mon Jul  6 12:22:47 2009 | 
Stephan Hänsel | SiLC | Measurements - hybrids with APV |   |   |   |   | 
Pt Modules:  
  
Optical Modules: 
  
ITE Modules:  
 | 
| 
  2  
 | 
Mon Jul  6 12:24:53 2009 | 
Stephan Hänsel | SiLC | Module Drawings |   |   |   |   | 
 Pt Modules:  
  
Optical Modules:  
 ITE Modules: : 
   | 
| 
  5  
 | 
Mon Jul  6 12:29:20 2009 | 
Stephan Hänsel | SiLC | Sensors - layout |   |   |   |   | 
 Pt Modules:  
CMS OB1 Sensors: 
  
 Optical Modules:  
Sensors: 
  
  
ITE Modules:  
 | 
| Attachment 1: Wafer-Screenshot.png
 | 
  | 
| 
  6  
 | 
Mon Jul  6 14:30:45 2009 | 
Marko Dragicevic |   | Equipment List |   |   |   |   | 
Slow Control: 
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR 
-- Koax-Kabel + Adapter auf Banane 
Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 2000EUR 
-- Shunt-Widerstand-Platine 
-- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700 
TRHX 
-- 3 Sensoren 
-- 2 lange Flachbandkabel, 1 serielles Kabel 
LV-Power-Supplies, je 150EUR 
-- GW Instek GPC-1850, SN.: 4080392 
-- GW Instek GPC-1850D, Inv.Nr.: 545-059 
-- GW Instek GPC-1850D, Inv.Nr.: 545-062 
-- Systron Donner HR 20-10A, SN.: 781-092 
-- Systron Donner HR 20-10A, SN.: 781-096 
Oszilloskop Tektronix TDS 3054, SN.: B011109, 4000EUR 
-- 4 probes 
Die Katze (Belle-HV-Supply) 
-- HV-Kabel 30m 
GBIP-Kabel, 1x lang, 1x kurz 
Signalgenerator Agilent 81110A, Inv.Nr.: 541-054, 3000EUR 
 
DAQ: 
Chrisu-PC, Inv.Nr.: 401-925 
-- Monitore 
---- Belinea, Inv.Nr.: 401-696 
---- Gericom, SN.: M1132GR5467345 
-- Keyboard & Maus 
Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 3000EUR 
-- Power Supply 
-- VME-Controller 
-- 4 VME-Module (1x Buffer, 3x FADC) 
DOCK-Box 
-- Power Kabel 
VME-Kabel (bockig) + Verlaengerung 
30m-Kabel (8xCat7, 2xCat5, 2xgrau) 
Lemo-Kabel 
100pin-Flachkabel Neco-Buffer 
Bananenkabel 
Hybridkabel (8x SiLC, Belle-Kabel) 
Special TLU-Adapter (flipping pin order of RJ45) 
Schrauben für Crate-Montage 
Erdungskabel (liegen am CERN im Labor) 
THRX + Hum. Sensoren! 
Magic Box 
 
DUT: 
Schrauben für Montage am Drehteller 
4mm Steckschlauch Stickstoff (Laenge?) 
Anschluss 1/8" auf 4mm Steckschlauch  
Druckminderer, SN.: 717.06143 
-- 6mm Snap-In 
-- 6mm Schlauch 
Chiller Huber ministat 230, Inv.Nr.: 482-021, 4000EUR 
-- Manual  
-- Netzteil 
-- langes serielles Kabel 
-- 5-6mm Schlauch 
-- Adapter 
-- 5 Liter dest. Wasser (falls noch Platz ist) 
-- LabView (falls ferngesteuert) 
Box-Deckel 
Baseplates (4?) 
Gaffa 
Doppelscotch 
Schwarze Selbstklebefolie 
Alufolie 
Sockel (2 verschiedene) 
Schablonen für SiLC-Angle Scan (08-Modules) 
gscheites Verlängerungskabel 
genug Schrauben, Gewindestangen, Flügelmuttern 
2 Balken für Pt-Module Drehungen (+ genug "Bolzen") 
GROSSES SCHWARZES LICHTDICHTES TUCH !!!! 
THRX-Kabel & Sensoren 
25 Module 
-- 4 Belle-Module (1 Stack) 
-- 2 pt-Module 
-- 2 Alignment-Module 
-- 2 Stacks mit Warschau-Sensoren (1x 6 Sensoren, 1x 3 Sensoren) 
-- 8 SiLC-Module (1 Stack) 
 
 
EDV: 
Netzwerkkabel 
Netzwerk-Switch:  
-- 3com Gigabit Switch 8, SN.: AB/9XRQ9J00171B0 
-- D-Link 8-Port GBit-Switch 
WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR 
1TB externe Festplatte: Western Digital MyBook, SN.: WCA551469094 
-- Netzgeraet 
-- USB-Kabel 
-- Firewire 400/800 Kabel 
Webcam 
USB-Stick 
Etikettiergeraet: Brother P-touch 1000 
Verlaengerungskabel ohne Ende… 
1 Dose Druckluft zur Reinigung 
Laptops 
-- Apple MacBook (MV) Inv.Nr.: 401-810 
-- Apple MacBook Pro (MD) Inv Nr.: 401-831 
-- Apple MacBook (GA) SN.:W87411Q3Z5Z 
2x PCI Express-Karten (noch zu kaufen), je 30EUR 
2x USB-Seriell Adapter 
1 Trommel Ethernet-Kabel (100m, vom Walzel) 
einige RJ-45 Stecker 
2.5" externe HD 
CD und DVD Rohlinge 
 
Tools: 
Diverse Adaptoren Lemo-BNC, Lemo-Lemo 
Taschenlampe +  2x Hirnbirn 
Massband 
Multimeter 
Werkzeug (Schraubenzieher & Co) 
Pinzetten 
Laserpointer 
Schwarze Fetzen 
Scotch tape 
Kabelbinder 
Adapter f. Steckdosen 
Verteiler-Leisten 
Tixo klein & gross 
Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer 
Ethernet-Crimp-Zange 
Eisensagl 
Schublehre 
 
Misc: 
Fondueset   
Spiegelreflex Digitalkamera Canon 450D (400EUR) 
-- Stativ 
-- Reflexionszelt 
SLR Marko 
Stativ 
Scheinwerfer (fuer ordentliche Fotos) 
Akkus+Ladegerät 
Dickes Logbook 
Kugelschreiber/Bleistifte 
Pflaster 
Carnet ATA | 
| Attachment 1: carnet_aug09.xls
 | 
| 
  7  
 | 
Mon Jul  6 16:22:36 2009 | 
Stephan Hänsel | SiLC | Measurements - Sensors |   |   |   |   | 
 Pt Modules:  
  
Optical Modules:  
  
ITE Modules:  
  
   | 
| 
  8  
 | 
Mon Jul  6 16:23:51 2009 | 
Stephan Hänsel | SiLC | Module Components |   |   |   |   | 
 Pt Modules:  
 
Pt-1: 
hybrid:  h01-4APV  
bottom sensor:  30210331516116  
top sensor: 30210332911309  
 
Pt-2: 
hybrid:  h02-4APV  
bottom sensor:  30210331415917  
top sensor:  30210314845402  
  
 Optical Modules:  
 
Opt_AC-Test-1: 
hybrid:  h21-2APV  
sensor:  HPK-ILC-TS-SPL-6687-05  
 
Opt_AC-Test-2: 
hybrid:  h22-2APV  
sensor:  HPK-ILC-TS-SPL-6687-07  
 
modules with SiLC alignment sensors: 
Opt-1: 
hybrid: h03  
sensor: HPK-SPL-6686-03  
 
Opt-2: 
hybrid: h04  
sensor: HPK-SPL-6686-07 
  
ITE Modules:   | 
| 
  9  
 | 
Thu Jul  9 10:29:58 2009 | 
Stephan Hänsel | SiLC | Measurements - Modules |   |   |   |   | 
 Pt Modules:  
- Sensoren sind Luftfeuhtigkeitsempfindlich 
- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren  
small Problems: 
  
Optical Modules:  
small Problems with h03-Module: 
ITE Modules:  
   | 
| 
  10  
 | 
Fri Jul 17 14:03:21 2009 | 
Stephan Hänsel |   | What to measure |   |   |   |   | 
 Origami 
  
Testbeam08 Module 
- Anglescan 
  
Pt Modules (2Stück - je 2 Sensoren):  
Anglescan 
- einzelne module (auch als "stub" (fixer Abstand zwischen ihnen) ?) 
wichtig: brauchen wir 2 Testbeam08 module um 90° verdreht für höheninformation??? (sensoren in den Pt-modulen sind nicht 100%ig parallel - MESSEN!) 
  
 Optical Modules:(DAUER ca 18 Stunden) 
 
- tests in box mit laserbeam (laser auf anderer Höhe al beam?!? - sonst geht der beam durch den Laser) 
  
ITE Modules:  
- 8 ter stack: (2 Testbeam08 module quer + 2 x 1stmetal128 + 2 x 2nd metal 128 + 2 x normal128) 
- 2ndmetal512 module 3 stück bauen und im beam versetzt einbauen parasitär bei den spanier-modulen) 
  
zusätliche ideen: 
- CMS-Tracker slice (2Pt + 2 optische + 3 2ndmetal512 hintereinander in unterschiedlichen winkeln um einen tracker-slice zu simulieren - CMS-layout !?!) 
  
   | 
| 
  11  
 | 
Fri Jul 31 19:23:26 2009 | 
Thomas Bergauer |   | Laser Spot size |   |   |   |   | 
| 10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm nach Kollimator: Durchmesser 1,54mm (FWHM) | 
| Attachment 1: laser_spot_overview.jpg
 | 
  | 
| Attachment 2: laser_spot_10cm.jpg
 | 
  | 
| Attachment 3: laser_spot_20cm.jpg
 | 
  | 
| Attachment 4: laser_spot_30cm.jpg
 | 
  |