Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
testbeam-rd50-desy-Oct2024
testbeam-RD50-DESY-Apr2024
testbeam-RD50-DESY-Jul2023
testbeam-RD50-CERN-Oct2022
testbeam-DESY-Oct2017
testbeam-DESY-April2017
testbeam-SPS2015
testbeam-SPS2014
testbeam-DESY14
testbeam-SPS12
testbeam-SPS11
testbeam-SPS10
testbeam-SPS09
testbeam-SPS08
LP-TPC
HEPHY logbook for testbeam at SPS June 2009, Page 2 of 6
Not logged in
Find
|
Login
|
Help
Full
|
Summary
| Threaded | Collapse |
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Project --
common
SiLC
BELLE
Pt_ITE512
ITE128
alignment_laser
alignment_beam
106 Entries
Goto page
Previous
1
, 2,
3
,
4
,
5
,
6
Next
All
Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54
Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009 14:27:07, 24.08.2009 15:26:20
Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009 14:11:45
Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25
Sun Aug 23 23:38:27 2009, Georg Auzinger, , Phone numbers, , , ,
Sun Aug 23 17:19:50 2009, Christian Irmler, Pt_ITE512, internal calibration, cal011, , 23.08.2009 16:30:43, 23.08.2009 17:02:14
Sun Aug 23 17:18:25 2009, Christian Irmler, Pt_ITE512, pedestal correction, pedcorr008, , 23.08.2009 17:17:36 ,
Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,
Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,
Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53
Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09
Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10
Sat Aug 22 23:06:22 2009, Christian Irmler, BELLE, pedestal correction 40 MHz transparent mode + cooling, pedcorr007, , 22.08.2009 23:04:29, 22.08.2009 23:13:51
Sat Aug 22 22:14:50 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode + cooling, cal010, , 22.08.2009 22:24:22,
Sat Aug 22 19:19:20 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run020, 75k, 22.08.2009 19:17:29, 22.08.2009 22:09:53
Sat Aug 22 15:52:33 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run019, 75k, 22.08.2009 15:50:40, 22.08.2009 19:14:21
Sat Aug 22 15:28:00 2009, Christian Irmler, BELLE, pedestal correction 31.8 MHz transparent mode + cooling, pedcorr006, , 22.08.2009 15:25:35, 22.08.2009 15:36:00
Sat Aug 22 15:12:44 2009, Thomas Bergauer, common, beam profile, , , ,
Sat Aug 22 14:46:12 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz transparent mode + cooling, cal009, , 22.08.2009 14:43:55, 22.08.2009 15:22:37
Sat Aug 22 13:34:14 2009, Christian Irmler, BELLE, pedestal correction 31.8 MHz transparent mode (cooling?), pedcorr005, , 22.08.2009 13:31:27, 22.08.2009 13:41:42
Goto page
Previous
1
, 2,
3
,
4
,
5
,
6
Next
All
ELOG V3.1.5-fc6679b