Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 2 of 6  Not logged in ELOG logo
IDdown Date Author Project Subject Run Number Events StartTime EndTime
  88   Mon Aug 24 15:28:49 2009 Georg AuzingerPt_ITE512Pt_ITE512 7deg airrun02820k24.08.09 15:39:5024.08.09 16:40:54

Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  87   Mon Aug 24 14:23:01 2009 Georg AuzingerPt_ITE512Pt_ITE512 5deg airrun02720k24.08.2009 14:27:0724.08.2009 15:26:20

Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  86   Mon Aug 24 13:01:14 2009 Georg AuzingerPt_ITE512Pt_ITE512 3deg airrun02620k24.08.09 11:24:3324.08.2009 14:11:45

Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  85   Mon Aug 24 11:58:23 2009 Georg AuzingerPt_ITE512Pt_ITE512 1deg airrun02520k24.08.09 11:24:3324.08.09 12:40:25

Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  84   Sun Aug 23 23:38:27 2009 Georg Auzinger Phone numbers    

 Georg #70

Wolfgang - Building: 41, Room: 204, Tel: ?

Manfred: Building 38, Room 522, Tel: 70522

Chrisu: B39, room 309, Tel: 79309

Bergi: Tel Zimmer: 79112, Handy: 16-2471

Maks: Tel Zimmer: 79117

  83   Sun Aug 23 17:19:50 2009 Christian IrmlerPt_ITE512internal calibrationcal011 23.08.2009 16:30:4323.08.2009 17:02:14

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

  82   Sun Aug 23 17:18:25 2009 Christian IrmlerPt_ITE512pedestal correctionpedcorr008 23.08.2009 17:17:36  

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 

Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316

  80   Sun Aug 23 13:15:42 2009 Marko DragicevicPt_ITE512Current and Humindity during first Run    

Current of Pt modules during first run

Data of the run was dicarded.

Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.

Timescales for RH and I graph are different!!!

after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again

 

Current of ITE512 plus 2 SiLC08 modules

HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable

 

  79   Sun Aug 23 08:13:31 2009 Thomas BergauerITE1282nd run with ITE128: top position (4mm below center)run023100k23.08.2009 08:06:5823.08.2009 09:30:53

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

  78   Sun Aug 23 02:18:20 2009 Thomas BergauerITE1282nd run with ITE128: top position (3mm below center); during nightrun02240789523.08.2009 02:16:2123.08.2009 08:04:09

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=112.31

  77   Sun Aug 23 01:46:03 2009 Thomas BergauerITE1282nd run with ITE128: central positionrun021100k23.08.09 00:10 (ca.)23.08.2009 02:15:10

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

  76   Sat Aug 22 23:06:22 2009 Christian IrmlerBELLEpedestal correction 40 MHz transparent mode + coolingpedcorr007 22.08.2009 23:04:2922.08.2009 23:13:51

Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction

chiller set to 13 deg, 2900 rpm

  75   Sat Aug 22 22:14:50 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent mode + coolingcal010 22.08.2009 22:24:22 

Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
external clock
cooling
chiller set to 13 deg.

Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm

  74   Sat Aug 22 19:19:20 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun02075k22.08.2009 19:17:2922.08.2009 22:09:53

Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

  73   Sat Aug 22 15:52:33 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun01975k22.08.2009 15:50:4022.08.2009 19:14:21

Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

  72   Sat Aug 22 15:28:00 2009 Christian IrmlerBELLEpedestal correction 31.8 MHz transparent mode + coolingpedcorr006 22.08.2009 15:25:3522.08.2009 15:36:00

Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction

chiller set to 13 deg, 2900 rpm

  71   Sat Aug 22 15:12:44 2009 Thomas Bergauercommonbeam profile    

playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position

Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)

Particle Production Applet
Calculator applet

For +120 Gev/c beam:

Pi+ 55.67 %
p 38.95 %
K+ 5.38 %

  70   Sat Aug 22 14:46:12 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent mode + coolingcal009 22.08.2009 14:43:5522.08.2009 15:22:37

Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
cooling
chiller set to 13 deg.

Since there was no (or to less) water flow through the small pipe of the origami module, all previous runs with cooling must be repeated.

Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm

  69   Sat Aug 22 13:34:14 2009 Christian IrmlerBELLEpedestal correction 31.8 MHz transparent mode (cooling?)pedcorr005 22.08.2009 13:31:2722.08.2009 13:41:42

Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.


external 31.8 MHz clock

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated!

ELOG V3.1.5-fc6679b