Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
|
Sat May 31 17:36:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2718, 100000, 31.05.2008 16:21:57, 31.05.2008 21:08:32
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
|
Sat May 31 17:32:35 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) , run2717, 6490, 31.05.2008 15:57:58, 31.05.2008 16:09:21
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
|
Sat May 31 17:29:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2716, 20000, 31.05.2008 14:59:26, 31.05.2008 15:56:23
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Fri May 30 19:42:13 2008, stephan hänsel, SiLC, APVDAQ only, run0001, 51803, 30.05.2008 19:38:04, 30.05.2008 22:54:59
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
|
Tue Jun 3 11:03:27 2008, Thomas Bergauer, , telescope alignment run, run2830, 3897, 2008-06-03 10:52:16.783, 2008-06-03 10:58:52.790
|
telescope run with reduced beam intensity (BEND4=-600A instead of -620A and BEND7=-605A instead of -615A) |
Sun Jun 1 15:52:03 2008, Eudet Telescope, SiLC, Telescope Pedestal Run, run2738, 1247, 1.6.2008. 15:50, 1.6.2008. 15:58
|
Telescope Pedestal Run
no DUTs!
no Beam!
|
Tue Jun 3 18:17:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2838, 478159, 03.06.2008 18:38:07, 04.06.2008 10:41:51
|
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
|
Tue Jun 3 16:53:20 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2837, 20000, 03.06.2008 16:49:40, 03.06.2008 17:26:49
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
|
Tue Jun 3 16:14:26 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2836, 10000, 03.06.2008 16:13:18, 03.06.2008 16:33:20
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 60 degrees
8 modules, 40MHz, 6 samples, hor position centered
|
Tue Jun 3 15:39:57 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2835, 10000, 03.06.2008 15:36:47, 03.06.2008 15:55:34
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 50 degrees
8 modules, 40MHz, 6 samples, hor position centered
|
Tue Jun 3 14:59:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2834, 10000, 03.06.2008 14:56:32, 03.06.2008 15:15:37
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 40 degrees
8 modules, 40MHz, 6 samples, hor position centered
|
Tue Jun 3 14:12:02 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2833, 10000, 03.06.2008 14:10:40, 03.06.2008 14:29:26
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 30 degrees
8 modules, 40MHz, 6 samples, hor position centered
|
Tue Jun 3 13:28:15 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2832, 10000, 03.06.2008 13:24:07, 03.06.2008 13:53:18
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 20 degrees
8 modules, 40MHz, 6 samples, hor position centered
|
Tue Jun 3 12:32:51 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2831, 10000, 03.06.2008 12:31:42, 03.06.2008 13:19:36
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 10 degrees
8 modules, 40MHz, 6 samples, hor position centered
|
Tue Jun 3 10:58:54 2008, Markus Friedl, BELLE, APVDAQ only, ped007, 10000, 03.06.2008 10:53:04, 03.06.2008 10:58:47
|
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity) |
Tue Jun 3 09:57:17 2008, Markus Friedl, BELLE, APVDAQ only, run0007, 105000, 03.06.2008 09:40:18, 03.06.2008 10:12:48
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
|
Tue Jun 3 09:27:27 2008, Markus Friedl, BELLE, APVDAQ only, run0006, 23929, 03.06.2008 09:26:16, 03.06.2008 09:34:22
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Tue Jun 3 09:12:42 2008, Markus Friedl, BELLE, APVDAQ only, run0005, 45020, 03.06.2008 09:11:30, 03.06.2008 09:24:42
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Tue Jun 3 02:38:21 2008, Markus Friedl, BELLE, APVDAQ + telescope (0-sup), run2829, 105000, 03.06.2008 02:29:51, 03.06.2008 09:08:58
|
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Tue Jun 3 00:20:06 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2828, 10000, 02.06.2008 23:55:06, 03.06.2008 00:18:56
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=200V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 23:34:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2827, 10000, 02.06.2008 23:33:40, 02.06.2008 23:52:04
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=150V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 23:14:58 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2826, 10000, 02.06.2008 23:14:19, 02.06.2008 23:31:29
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=120V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 22:55:49 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2825, 10000, 02.06.2008 22:55:03, 02.06.2008 23:12:09
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=90V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 22:37:13 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2824, 10000, 02.06.2008 22:36:37, 02.06.2008 22:53:15
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=80V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 22:13:17 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2823, 10000, 02.06.2008 22:12:44, 02.06.2008 22:34:49
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=70V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 21:54:34 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2822, 10000, 02.06.2008 21:53:37, 02.06.2008 22:10:53
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=60V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 21:37:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2821, 10000, 02.06.2008 21:32:57, 02.06.2008 21:51:55
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 16:01:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2792, 4536, 02.06.2008 16:00:09, 02.06.2008 16:19:42
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 15:41:20 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2791, 10000, 02.06.2008 15:40:20, 02.06.2008 15:58:16
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=40V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 15:21:53 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2790, 10000, 02.06.2008 15:20:44, 02.06.2008 15:38:04
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=30V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 14:55:38 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2789, 10000, 02.06.2008 14:54:33, 02.06.2008 15:19:12
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=20V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 14:32:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2788, 10000, 02.06.2008 14:31:15, 02.06.2008 14:51:55
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Mon Jun 2 13:19:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2787, 30000, 02.06.2008 13:15:04, 02.06.2008 14:27:57
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
|
Sun Jun 1 08:06:57 2008, stephan hänsel, SiLC, APVDAQ + telescope (raw), run2721-2737, 22000, 01.06.2008 - 08:01:53, 01.06.2008 - 14:19:13
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Sun Jun 1 23:46:33 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2758 - run2783, 34873, 01.06.2008 23:44:57, 02.06.2008 10:08:46
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Sun Jun 1 23:23:16 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0004, 100000, 01.06.2008 23:21:12, 01.06.2008 23:41:09
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
|
Sun Jun 1 23:20:10 2008, Markus Friedl, SiLC, APVDAQ only, ped004, 10000, 01.06.2008 23:16:52, 01.06.2008 23:19:59
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
|
Sun Jun 1 16:06:42 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2741 - run2757, 22000, 01.06.2008 16:02:56, 01.06.2008 22:02:34
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Sun Jun 1 15:08:17 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0003, 100000, 01.06.2008 15:05:51, 01.06.2008 15:33:58
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
|
Sun Jun 1 15:02:51 2008, Markus Friedl, SiLC, APVDAQ only, ped003, 10000, 01.06.2008 15:00:54, 01.06.2008 15:04:14
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
|
Sun Jun 1 14:58:53 2008, Markus Friedl, SiLC, APVDAQ only, ped002, 10000, 01.06.2008 14:55:31, 01.06.2008 14:59:06
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
|
Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
|
Sun Jun 1 01:56:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2720, 100000, 01.06.2008 01:51:45, 01.06.2008 07:48:09
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Tue May 6 13:51:43 2008, Thomas Bergauer, other, Equipment list, , , ,
|
[B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
|
Wed May 7 10:43:09 2008, Thomas Bergauer, SiLC, Documentation: twiki, Stephans Hardware Drawings,...., , , ,
|
DUT, APVDAQ Documentation
CERN TWiki: https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
Stephan's Documentation: http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/
|
Wed May 7 16:28:23 2008, stephan hänsel, SiLC, Photos, , , ,
|
Module Photos
[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview of module (without cover)[/URL]
|
Fri May 9 11:46:36 2008, Markus Friedl, SiLC, Data file format, (work in progress), , ,
|
APVDAQ Data Analysis
====================
|
Fri May 9 15:29:28 2008, Thomas Bergauer, SiLC, Sensor Layout, , , ,
|
pplus strip
|
Wed May 14 09:21:39 2008, stephan hänsel, SiLC, capacity measurements - HPK-ILC-TS-6687-24, , , ,
|
ich hab mal die Kapazitäts-Messungen vom Thomas in ein Diagram gegeben
interessant ist, dass die Kapazität mit 2 intermediate strips (int. strips) kleiner ist als mit einem int. strip -> das bedeutet, dass der eine int. strip |
Wed May 14 16:15:30 2008, Markus Friedl, BELLE, Micron DDD5 Photos, , , ,
|
This is the new Micron DDD5 double-sided module with 3+3 APV25 readout chips on each side.
The p-side flex hybrid sits at the edge of the sensor, while the n-side flex hybrid is located on top of about
|
Mon May 19 15:14:40 2008, Markus Friedl, other, Tentative Beam Test Schedule, , , ,
|
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
|
Mon May 19 15:21:49 2008, Markus Friedl, other, CERN SPS page 1, , , ,
|
SPS Status
SPS Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
Manual - http://jwenning.web.cern.ch/jwenning/documents/SPS/Operation/Page-1%20description.htm
Linac, |
Fri May 23 15:17:49 2008, Markus Friedl, SiLC, Module/chip/strip/zone numbering scheme, (work in progress), , ,
|
The SILC DUT is a stack of 8 silicon sensors surrounded by the telescope.
The spacing between each of the 8 layers is 20mm. Seen with the beam, the fourth layer is exactly centered
between the telescope legs. This means that the stack as a whole is not exactly centered, as there is no
|
Mon May 26 15:38:53 2008, Markus Friedl, SiLC, How to run APVDAQ, , , ,
|
Power-on Procedure
==================
|
Fri May 30 10:36:18 2008, Marko Dragicevic, other, Important Information/Contact, , , ,
|
[B]IPs[/B]
Linksys Router
[LIST]
|
Sat May 31 13:34:28 2008, Thomas Bergauer, , how to copy data from lab2pc to eudetmac, , , ,
|
rsync -rltvz --exclude "data_vie" --exclude "hitfit_cern08" --exclude "output_vie" --exclude "run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/
/Volumes/Data/eudet/APVDAQ/
|
Sat May 31 18:33:50 2008, Thomas Bergauer, other, beam profile, , , ,
|
[SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
|
Sun Jun 1 17:01:12 2008, Thomas Bergauer, SiLC, path do data, , , ,
|
[SIZE=4]The data of all runs are stored on eudetmac001.cern.ch:[/SIZE]
[b]APVDAQ:[/b] /Volumes/Data/eudet/APVDAQ/silc/data
|
Sun Jun 1 18:23:38 2008, Markus Friedl, SiLC, Very simple tracking, run2719, 100000, ,
|
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
|
Sun Jun 1 20:13:37 2008, Eudet Telescope, SiLC, BZIP2 compressed APVDAQ data, , , ,
|
[b]Processed APVDAQ data_cluster - in tar.bzip2 format:[/b]
- on machine: eudetmac001.cern.ch
|
Sun Jun 1 23:36:21 2008, Christian Irmler, SiLC, HowTo analyse data, , , ,
|
The analysis consists of two stages:
[LIST]
[*] The first is zero supression an cluster finding done with "apvdaq_analysis_fadc" (Labwindows/CVI application)
|
Tue Jun 3 12:41:22 2008, Eudet Telescope, , useful eudaq software commands, (work in progress), , ,
|
[b]to show information about a run (number of events, start and end timestamp,....:[/b]
./TestReader.exe -b -e 2828 |
Wed Jun 4 15:41:04 2008, Thomas Bergauer, , end., , , ,
|
testbeam is over. DUTs and APVDAQ have been dismounted and will be shipped back to Vienna. EUDET telescope is still in H6B and taking data for alignment
and pedestal during the night. |
Tue Jun 17 09:43:07 2008, Thomas Bergauer, , Data analysis progress, overview (in progress), , ,
|
[TABLE border="1"]
run number|What?|APVDAQ mode|Telescope mode|#events|hit data processed|hitfit processed
|-
|
|