SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
- long break in the middle due to power outage after thunderstorm
horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position
all 3 positions are:
RIGHT: +2.00 mm <--- this run
MID: -2.75 mm
LEFT: -7.50 mm |