Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008  Not logged in ELOG logo
Message ID: 8     Entry time: Mon May 19 15:14:40 2008
Author: Markus Friedl 
Project: other 
Subject: Tentative Beam Test Schedule 
Run Number:  
Events:  
StartTime:  
EndTime:  
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on

1) Telescope + 8xSilC (~7hrs, overnight; first part)
2) 8xSilc, no telescope (fast runs during day)
3) Telescope + 8xSilC (~7hrs, overnight; second part after DUT shift)
4) 1xSilc, rotation
5) Belle, telescope

* starting telescope alignement
* adc delay scan, intcal, pedrun, pedcorr
* DUT alignement
* std. settings, telescope zero supr.(zp) 1st half, lunch break
* std. settings, telescope zero supr. 2nd half
* std. settings, telescope raw data, 1st half
* std. settings, telescope raw data, 2nd half
* optionally HV scan, tel. zp., (10 HV settings --> 2x 10 runs)
* unmount 7 DUTs
* std run 0 deg., (2 runs)
* angle scan (about 10 runs)      
* install Belle DUT
* std. settings, telescope raw, transparent mode
* std. settings, telescope sp, transparent mode, high statistics
* std. settings, telescope sp, processed mode, high statistics
ELOG V3.1.5-fc6679b