| 
| ID | Date | Author | Type | Subject  |  | 6 | Thu Oct 22 08:04:51 2009 | Stephan Hänsel | Setup | geometry - silicon envelope |  | distance si-sledge-front to silicon-Z-center = 23 cm -> silicon sledge front 35 cm inside from front of TPC-support at a beam position 58 cm from front of TPC-support 
 CCU119 = 0x77 
    position 7 = I2C16 = SiLC12 -> front Xposition 1 = I2C17 = SiLC11 -> front Z CCU123 = 0x7b 
    position 7 = I2C16 = SiLC01 -> back Zposition 1 = I2C17 = SiLC02 -> back X |  | 13 | Mon Nov  2 13:59:09 2009 | Stephan Hänsel | Setup | ToDo before data-taking |  | in hut: 
    plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you look from the back of the PC))power on CCUM in spacing behind electronic hutswitch on opto-electrical converter for FED (on top of PC (switch in the back) and switch on power supply (front))LV on -> 01,30 and 02,60 (two times)HV on -> 200V T24/1 
    power the scintillators for triggeringmove envelope into beamline - sledge front to sensor center is 220,5mm -> switch on the beam |  | 4 | Fri Feb 27 14:03:53 2009 | Stephan Hänsel | Setup | Setup 3D |  |  |  | 2 | Wed Feb 25 09:57:15 2009 | Stephan Hänsel | Measurements | Sensor IV-Kurven + CV-Messungen (vor Modulbau) |  |   
    
    
        
            | Object ID | Vdepl | I bei 300V | I bei 450V |  
            | ILC-6684-01 | 53 | 1,96E-07 | 2,10E-07 |  
            | ILC-6684-05 | 53 | 1,95E-07 | 2,16E-07 |  
            | ILC-6684-19 | 50 | 1,98E-07 | 2,21E-07 |  
            | ILC-6684-23 | 50 | 1,74E-07 | 1,93E-07 |  
            | ILC-6684-27 | 55 | 2,62E-07 | 2,77E-07 |  
            | ILC-6684-34 | 58 | 2,30E-07 | 2,56E-07 |  |  | 31 | Fri Nov 27 12:23:25 2009 | Stephan Hänsel | Measurements | Run 20077 - Pedestal |  | 16196 events with 2 Micromegas modules Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    -> front Z: 5mm too far inside the gap-> back Z: 5mm too far outside the gap   HV: 200V -> 1,2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,632 / 1,739   //   0,622 / 1,752       |  | 30 | Fri Nov 27 12:22:19 2009 | Stephan Hänsel | Measurements | Run 20075 - Micromegas 817 |  | 46196 events (usable: 42433 events) with 2 Micromegas modules (TPCDAQ stopped at 46195 events) Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    -> front Z: 5mm too far inside the gap-> back Z: 5mm too far outside the gap rate: 4,1 Hz HV: 200V -> 1,2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,632 / 1,739   //   0,622 / 1,752       |  | 29 | Fri Nov 27 12:21:00 2009 | Stephan Hänsel | Measurements | Run 20074 - Micromegas 816 |  | 10010 events with 2 Micromegas modules (TPCDAQ stopped at 10003 events) Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    -> front Z: 5mm too far inside the gap-> back Z: 5mm too far outside the gap rate: 4,1 Hz HV: 200V -> 1,2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,632 / 1,739   //   0,622 / 1,752       |  | 28 | Thu Nov  5 19:46:15 2009 | Stephan Hänsel | Measurements | Run 20073 - Micromegas 815 |  | 10070 events with 2 Micromegas modules (TPCDAQ stopped at 9864 events) Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    -> front Z: 5mm too far inside the gap-> back Z: 5mm too far outside the gap   HV: 200V -> 1,2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,632 / 1,739   //   0,622 / 1,752       |  | 27 | Thu Nov  5 19:44:28 2009 | Stephan Hänsel | Measurements | Run 20070 - positionrun |  | 2257 events without Micromegas Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    -> front Z: 5mm too far inside the gap-> back Z: 5mm too far outside the gap     HV: 200V -> 1,2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,632 / 1,739   //   0,622 / 1,752       |  | 26 | Thu Nov  5 19:36:48 2009 | Stephan Hänsel | Measurements | Run 20069 - pedestal |  | 13600 events without Micromegas Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front HV: 200V -> 1,2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,632 / 1,739   //   0,622 / 1,752       |  | 25 | Thu Nov  5 19:34:58 2009 | Stephan Hänsel | Measurements | Run 20065 - pedestal |  | 18400 events without Micromegas Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front HV: 200V -> 1,2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,632 / 1,739   //   0,622 / 1,752       |  | 24 | Thu Nov  5 19:33:53 2009 | Stephan Hänsel | Measurements | Run 20064 - pedestal |  | 12199 events without Micromegas Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front HV: 100V -> 1µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,648 / 1,760   //   0,638 / 1,774       |  | 23 | Wed Nov  4 18:24:48 2009 | Stephan Hänsel | Measurements | Run 20063 - Micromegas #808 |  | crashed at 18577 events - TPC 19220 events Beam: 5,6 GeV one Micromegas module in center position silicon sledge 35cm inside from TPC-support-front     HV: 200V -> 2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,627 / 1,605   //   0,618 / 1,617       |  | 22 | Wed Nov  4 18:19:44 2009 | Stephan Hänsel | Measurements | Run 20062 - data |  | 6493 events without Micromegas Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front HV: 200V -> 2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,621 / 1,722   //   0,610 / 1,734       |  | 21 | Wed Nov  4 17:12:47 2009 | Stephan Hänsel | Measurements | Run 20061 - Latency Scan -> 70 |  | LATENCY IS SET TO 70 spillsize = 500       Beam: 5,6 GeV silicon sledge 35cm inside from TPC-support-front HV: 200V -> 2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,621 / 1,722   //   0,610 / 1,734       |  | 20 | Wed Nov  4 16:31:42 2009 | Stephan Hänsel | Measurements | Run 20059 - Micromegas #807 |  | crashed at 3648 events -> TPC got much more events Beam: 5,6 GeV one Micromegas module in center position silicon sledge 35cm inside from TPC-support-front HV: 200V -> 2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,621 / 1,722   //   0,610 / 1,734       |  | 19 | Wed Nov  4 16:12:33 2009 | Stephan Hänsel | Measurements | Run 20057 - Micromegas #806 |  | 1076 events trigger rate 7,25Hz bx = real trigger number     HV: 200V -> 2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,621 / 1,722   //   0,610 / 1,734 
     |  | 18 | Wed Nov  4 16:10:24 2009 | Stephan Hänsel | Measurements | Run 20056 - Micromegas #805 |  | 10989 events HV: 200V -> 2µA LV: 
    01,30 / 02,60   //   01.30 / 02.600,621 / 1,722   //   0,610 / 1,734 trigger rate 7,25Hz  !!!!! in eventfile: time-stamp instead of real trigger number !!!!!     |  | 16 | Wed Nov  4 15:29:00 2009 | Stephan Hänsel | Measurements | Run 20055 - Pedestal |  |  |  | 17 | Wed Nov  4 15:31:39 2009 | Stephan Hänsel | Measurements | Run 20055 - Pedestal |  | 15399 triggers HV: 200V -> 2µA LV:  
    01,30 / 02,60   //   01.30 / 02.600,621 / 1,722   //   0,610 / 1,734     |  | 11 | Fri Oct 23 08:09:04 2009 | Stephan Hänsel | Measurements | Run 11273 - data |  | B=0, TPC inbetween but no TPC readout Beam: 3GeV silicon position from TPC-support-ring:       123: x=center, z=56.5 cm (measuring tape: sledge 35cm inside the gap)      116: x=center, z=57 cm (measuring tape: sledge 35cm inside the gap) 2 APVs dead:   apvlatency = 75 (in fedpmc_silc.xml) |  | 10 | Fri Oct 23 08:02:57 2009 | Stephan Hänsel | Measurements | Run 11271 - position run |  | B=0, TPC inbetween but no TPC readout Beam: 3GeV moved silicon to center position (~58cm from TPC-support-ring) 2 APVs dead:   apvlatency = 75 (in fedpmc_silc.xml)   2-sensor-module in center 1-sensor-module not exactly in center-position:      12316 -> move out of the magnet 1,5cm      11917 -> move out of the magnet 1cm |  | 9 | Fri Oct 23 07:57:01 2009 | Stephan Hänsel | Measurements | Run 11270 - latency scan |  | B=0, TPC inbetween but no TPC readout scan from 70 to 120 with 1000 events each root-diagram -> latency ~ 75 -> set apvlatency in fedpmc_silc.xml to 75 |  | 8 | Fri Oct 23 07:52:52 2009 | Stephan Hänsel | Measurements | Run 11269 - Pedestal Run |  | B=0, TPC inbetween but no TPC readout |  | 7 | Thu Oct 22 11:18:34 2009 | Stephan Hänsel | Setup | Pictures |  | Photo Gallery zusätliche Photos: labeled SiLC in front of TPC |  | 1 | Wed Oct  1 11:42:44 2008 | stephan hänsel | Setup | Modulkomponenten |  | MODULE 0 1 Sensor Module (SiLC01):    Hybrid: TEC_6D.2.1 / 30216662133923    Sensor: HPK-ILC-6684-01 2 Sensor Module (SiLC02):    Hybrid: TEC_6D.2.1 / 30216662133993    Sensor Near: HPK-ILC-6684-19    Sensor Far: HPK-ILC-6684-05     MODULE 1 1 Sensor Module (SiLC11b):    Hybrid: TEC_6D.2.1 / 30216662133904    Sensor: HPK-ILC-6684-23 2 Sensor Module (SiLC12):    Hybrid: TEC_6D.2.1 / 30216661605173    Sensor Near: HPK-ILC-6684-34    Sensor Far: HPK-ILC-6684-27   (OLD - 1 Sensor Module (SiLC11):    Hybrid: TEC_6D.2.1 / 30216662133922    Sensor: HPK-ILC-6684-23)   |  | 5 | Thu Oct 22 08:02:26 2009 | Stephan Hänsel | Setup | Electronics |  | HV-Kapton-PIN-assignment     CCUM-to-Module Adapter-Cards  CCUM-to-Module Adapter-Cards Pin-assignment (xls)     schematic of the adopted readout (A.Dierlamm)    TEC-R2-Hybrid  |  | 12 | Mon Nov  2 13:22:50 2009 | Stephan Hänsel | Setup | DAQ |  | start data-taking: ssh xxx@bastion.desy.de -X ssh xdaq@flctpcikhero1.desy.de -X - at PC reboot: 
    source xdaq_profilecd scripts./fedpmc 0  + ctrl C when ready    //initialise the first FED./fedpmc 1  + ctrl C when ready    //initialise the second FED./gatecalib     //sets adresses for the TSC + gate./setdll 3 5     //sets width of the gate when controllring newly connected 
    source xdaq_profile (if not done before)cd scripts./ProgramTest.exe -pci -reset     //-> controllring 0x4c90 test of devices: 
    source xdaq_profile (if not done before)cd scripts./ProgramTest.exe -pci -scanCCU     // searches for CCUs./ProgramTest.exe -pci -scantrackerdevice     // searches for CCUs and APVs start xdaq: 
    source xdaq_profile (if not done before)/opt/firefox/firefox & -> http://ikhero2.desy.de:40000     // not working for now./xdaq.sh -p40000reload firefox HyperDAQ: 
    -> Control Panel -> Configure Cluster -> load /home/xdaq/xml/peak_silc.xml 
 
        tick: Configure Cluster-> submit-> view Applications -> Tracker Supervisor:
    
        choose run type -> normaltick: TLU in physics Runtype spillsize = 20tick: No gate if xdaq kills itself:    analysis: 
    root:
    
        in /Analysis/AC1Analysis-1.4>.L runAna_silc.CrunAna(pedestalnumber,runnumber) get file with number of single events in all 4 sensors + HitProfile 
    root
    
        .L readClusterTree_silc.cxx++readClusterTree_silc(event number)                 |  | 14 | Tue Nov  3 10:45:01 2009 | Stephan Hänsel | Setup | Beam On |  | clear test beam areas: go to T24 (front area): 
    use (red) key from interlockgo into T24 area, close door, use red key in keyhole next to door -> big red light onpush the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttonsgo back to the door, turn key and keep it turned!
    
        open the door, move out and close it again behind younow it is the time to return the key again -> two green lights should go on go to T24/1 (LPTPC area): 
    use (black) key from interlockgo into T24/1 area, close door, use black key in keyhole next to door -> big red light onpush the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttonsgo back to the door, turn key and keep it turned!
 
        open the door, move out and close it again behind younow it is the time to return the key again -> two green lights should go on power bending magnets: 
    choose beam energy according to list sticked to monitor get beam: 
    phone Control Room 3500tell them to put the wire into DesyII at the position written in their lock book open shutter: 
    go back to hutput back the red and black keys into the interlockturn all four keys -> 5 green lights should be on next to each pair of keysopen shutter T24 with the button "Beam  Shutter auf" -> bottom green light next to the keys should go outopen shutter T24/1 with the button "Beam  Shutter auf" -> bottom green light next to the keys  should go outnow you should see beam  -> start data taking             |  | 15 | Tue Nov  3 11:18:46 2009 | Stephan Hänsel | Setup | Beam Off |  | close shutter: 
    close shutter T24/1 with the button "Beam  Shutter zu" (green) -> bottom green light next to the keys  should go onclose shutter T24 with the button "Beam  Shutter auf" (green) -> bottom green light next to the keys should go onturn all four keys -> (the top) 4 green lights should go out next to each pair of keys go to T24/1 (LPTPC area): 
    just open the door -> the two green and the big red lights go out If you do not need the test beam any more: 
    open door at test beam area T24  -> the two green and the big red lights go outcall Control Room 3500switch off bending magnets 
 |  | 3 | Fri Feb 27 13:34:11 2009 | Stephan Hänsel | Measurements | ARCs Noise PIoff + channels 2 repair |  |   
        
    
        
            |  Noise Peak Inverter Off (SiLC11b after   repair --- b ... 2nd module with same sensors but different hybrid and PA) |  
            |  |  |  |  |  |  
            |  | Noise Pioff [ADC*100] | optical inspection | Noise Pioff [ADC*100] |  |  
            |  | 1ADC-count entspricht ca 770 e- |    |  
 1ADC-count entspricht ca 770 e- |  |  
            | CHANNEL | SiLC01 | After Repair | Measurement 06 | CCU123-16 back Z
 repair-action |  
            | 5 | 64 |  | 142 | non |  
            | 6 | 65 |  | 142 | non |  
            | 7 | 80 |  | 135 | non |  
            | 8 | 135 | good | 72 | PA-PA rebond |  
            | 9 | 80 |  | 133 | non |  
            | 10 | 139 | good | 77 | PA-PA rebond |  
            | 12 | 139 | good | 76 | PA-PA   rebond |  
            | 15 | 73 |  | 59 | PA-PA   rebond |  
            | 21 | 145 | good | 57 | PA-PA   rebond |  
            | 73 | 77 |  | 134 | non |  
            | 74 | 70 |  | 135 | non |  
            | 75 | 137 | good | 62 | ? PA-PA rebond |  
            | 137 | 76 |  | 137 | non |  
            | 236 | 76 |  | 69 | ? PA-PA rebond |  
            | 281 | 55 |  | 126 | non |  
            | 453 | 67 |  | 118 | non |  
            | 570 | 63 |  | 61 | Jakkoo-PA Open |  
            | 666 | 64 |  | 134 | non |  
            | 668 | 62 |  | 136 | non |  
            | 715 | 74 |  | 144 | non |  
            | 764 | 67 |  | 134 | non |  
            | 765 | 141 | good | 66 | PA-PA rebond |  
            | 766 | 145 | good | 65 | PA-PA   rebond |  
            | 768 | 136 | good | 63 | PA-PA   rebond |  
            |  |  |  |  |  |  
            |  |  |  |  |  |  
            | CHANNEL | SiLC02 |  |  |  |  
            | 21 | 75 | Jakkoo-PA Open |  | CCU123-17 back X
 |  
            | 63 | 64 | PA-SE rebond |  |  |  
            | 73 | 81 | ? |  |  |  
            | 91 | 77 | PA-PA rebond |  |  |  
            | 170 | 69 | ? |  |  |  
            | 696 | 72 | PA-SE rebond |  |  |  
            | 704 | 67 | PA-SE rebond |  |  |  
            | 719 | 148 | SE-SE rebond |  |  |  
            |  |  |  |  |  |  
            |  |  |  |  |  |  
            | CHANNEL | SiLC11b | Measurement 06 |  | CCU119-17 front Z 
 |  
            | 13 | 80 | Jakkoo-PA Open |  |  |  
            | 153 | 62 | Jakkoo-PA Open |  |  |  
            | 415 |  | ? Remove bond -> IV   verbesserung |  |  |  
            | 713 |  | ? Remove bond -> IV   verbesserung |  |  |  
            |  |  |  |  |  |  
            |  |  |  |  |  |  
            | CHANNEL | SiLC12 | Measurement 02 |  | CCU119-16 front X 
 |  
            | 3 | 68 | Jakkoo-PA Open |  |  |  
            | 128 | 63 | ? |  |  |  
            | 346 | 57 | APV-PA Open |  |  |  
            | 523 | 128 | ? |  |  |  
            | 651 | 71 | Jakkoo-PA Open |  |  |  
            | 652 | 72 | Jakkoo-PA Open |  |  |  
            | 653 | 71 | Jakkoo-PA Open |  |  |  
            | 654 | 71 | Jakkoo-PA Open |  |  |  
            | 655 | 71 | Jakkoo-PA Open |  |  |  
            | 675 | 149 | ? |  |  |  
            | 767 | 74 | ? Jakkoo-PA Open |  |  |    |  |