in hut:
- plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you look from the back of the PC))
- power on CCUM in spacing behind electronic hut
- switch on opto-electrical converter for FED (on top of PC (switch in the back) and switch on power supply (front))
- LV on -> 01,30 and 02,60 (two times)
- HV on -> 200V
T24/1
- power the scintillators for triggering
- move envelope into beamline - sledge front to sensor center is 220,5mm
-> switch on the beam |