Message ID: 13     Entry time: Mon Nov 2 13:59:09 2009
Author: Stephan Hänsel 
Type: Setup 
Subject: ToDo before data-taking 

in hut:

  • plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you look from the back of the PC))
  • power on CCUM in spacing behind electronic hut
  • switch on opto-electrical converter for FED (on top of PC (switch in the back) and switch on power supply (front))
  • LV on -> 01,30 and 02,60 (two times)
  • HV on -> 200V

T24/1

  • power the scintillators for triggering
  • move envelope into beamline - sledge front to sensor center is 220,5mm

-> switch on the beam