Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC  Not logged in ELOG logo
Message ID: 21     Entry time: Wed Nov 4 17:12:47 2009
Author: Stephan Hänsel 
Type: Measurements 
Subject: Run 20061 - Latency Scan -> 70 

LATENCY IS SET TO 70

spillsize = 500

 

 

 

Beam: 5,6 GeV

silicon sledge 35cm inside from TPC-support-front

HV: 200V -> 2µA

LV:

  • 01,30 / 02,60   //   01.30 / 02.60
  • 0,621 / 1,722   //   0,610 / 1,734

 

 

 

ELOG V3.1.5-fc6679b