Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC  Not logged in ELOG logo
Message ID: 11     Entry time: Fri Oct 23 08:09:04 2009
Author: Stephan Hänsel 
Type: Measurements 
Subject: Run 11273 - data 

B=0, TPC inbetween but no TPC readout

Beam: 3GeV

silicon position from TPC-support-ring: 

     123: x=center, z=56.5 cm (measuring tape: sledge 35cm inside the gap)

     116: x=center, z=57 cm (measuring tape: sledge 35cm inside the gap)

2 APVs dead:

 

apvlatency = 75 (in fedpmc_silc.xml)

ELOG V3.1.5-fc6679b