Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC  Not logged in ELOG logo
Message ID: 15     Entry time: Tue Nov 3 11:18:46 2009
Author: Stephan Hänsel 
Type: Setup 
Subject: Beam Off 

close shutter:

  • close shutter T24/1 with the button "Beam  Shutter zu" (green) -> bottom green light next to the keys should go on
  • close shutter T24 with the button "Beam  Shutter auf" (green) -> bottom green light next to the keys should go on
  • turn all four keys -> (the top) 4 green lights should go out next to each pair of keys

go to T24/1 (LPTPC area):

  • just open the door -> the two green and the big red lights go out

If you do not need the test beam any more:

  • open door at test beam area T24 -> the two green and the big red lights go out
  • call Control Room 3500
  • switch off bending magnets

ELOG V3.1.5-fc6679b