16196 events
with 2 Micromegas modules
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|