Fri Nov 27 12:23:25 2009, Stephan Hänsel, Measurements, Run 20077 - Pedestal
|
16196 events
with 2 Micromegas modules
Beam: 5,6 GeV |
Fri Nov 27 12:22:19 2009, Stephan Hänsel, Measurements, Run 20075 - Micromegas 817
|
46196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ stopped at 46195 events)
Beam: 5,6 GeV |
Fri Nov 27 12:21:00 2009, Stephan Hänsel, Measurements, Run 20074 - Micromegas 816
|
10010 events
with 2 Micromegas modules (TPCDAQ stopped at 10003 events)
Beam: 5,6 GeV |
Thu Nov 5 19:46:15 2009, Stephan Hänsel, Measurements, Run 20073 - Micromegas 815
|
10070 events
with 2 Micromegas modules (TPCDAQ stopped at 9864 events)
Beam: 5,6 GeV |
Thu Nov 5 19:44:28 2009, Stephan Hänsel, Measurements, Run 20070 - positionrun
|
2257 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position |
Thu Nov 5 19:36:48 2009, Stephan Hänsel, Measurements, Run 20069 - pedestal
|
13600 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
Thu Nov 5 19:34:58 2009, Stephan Hänsel, Measurements, Run 20065 - pedestal
|
18400 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
Thu Nov 5 19:33:53 2009, Stephan Hänsel, Measurements, Run 20064 - pedestal
|
12199 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
Wed Nov 4 18:24:48 2009, Stephan Hänsel, Measurements, Run 20063 - Micromegas #808
|
crashed at 18577 events - TPC 19220 events
Beam: 5,6 GeV
one Micromegas module in center position |
Wed Nov 4 18:19:44 2009, Stephan Hänsel, Measurements, Run 20062 - data
|
6493 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
Wed Nov 4 17:12:47 2009, Stephan Hänsel, Measurements, Run 20061 - Latency Scan -> 70
|
LATENCY IS SET TO 70
spillsize = 500
|
Wed Nov 4 16:31:42 2009, Stephan Hänsel, Measurements, Run 20059 - Micromegas #807
|
crashed at 3648 events -> TPC got much more events
Beam: 5,6 GeV
one Micromegas module in center position |
Wed Nov 4 16:12:33 2009, Stephan Hänsel, Measurements, Run 20057 - Micromegas #806
|
1076 events
trigger rate 7,25Hz
bx = real trigger number |
Wed Nov 4 16:10:24 2009, Stephan Hänsel, Measurements, Run 20056 - Micromegas #805
|
10989 events
HV: 200V -> 2µA
LV: |
Wed Nov 4 15:31:39 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal
|
15399 triggers
HV: 200V -> 2µA
LV: |
Wed Nov 4 15:29:00 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal
|
|
Tue Nov 3 11:18:46 2009, Stephan Hänsel, Setup, Beam Off
|
close shutter:
close shutter T24/1 with the button "Beam Shutter zu" (green) -> bottom green light next to the keys should go on
close shutter T24 with the button "Beam Shutter auf" (green) -> bottom green light next to the keys should go on
turn |
Tue Nov 3 10:45:01 2009, Stephan Hänsel, Setup, Beam On
|
clear test beam areas:
go to T24 (front area):
use (red) key from interlock
go into T24 area, close door, use red key in keyhole next to door -> big red light on
|
Mon Nov 2 13:59:09 2009, Stephan Hänsel, Setup, ToDo before data-taking
|
in hut:
plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you
look from the back of the PC))
power on CCUM in spacing behind electronic hut
switch on opto-electrical converter for FED (on |
Mon Nov 2 13:22:50 2009, Stephan Hänsel, Setup, DAQ
|
start data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X |
Fri Oct 23 08:09:04 2009, Stephan Hänsel, Measurements, Run 11273 - data
|
B=0, TPC inbetween but no TPC readout
Beam: 3GeV
silicon position from TPC-support-ring: |
Fri Oct 23 08:02:57 2009, Stephan Hänsel, Measurements, Run 11271 - position run
|
B=0, TPC inbetween but no TPC readout
Beam: 3GeV
moved silicon to center position (~58cm from TPC-support-ring) |
Fri Oct 23 07:57:01 2009, Stephan Hänsel, Measurements, Run 11270 - latency scan
|
B=0, TPC inbetween but no TPC readout
scan from 70 to 120 with 1000 events each
root-diagram -> latency ~ 75 |
Fri Oct 23 07:52:52 2009, Stephan Hänsel, Measurements, Run 11269 - Pedestal Run
|
B=0, TPC inbetween but no TPC readout |
Thu Oct 22 11:18:34 2009, Stephan Hänsel, Setup, Pictures
|
Photo Gallery
zusätliche Photos:
labeled SiLC in front of TPC |
Thu Oct 22 08:04:51 2009, Stephan Hänsel, Setup, geometry - silicon envelope
|
distance si-sledge-front to silicon-Z-center = 23 cm
-> silicon sledge front 35 cm inside from front of TPC-support at a beam position 58 cm from front of TPC-support
|
Thu Oct 22 08:02:26 2009, Stephan Hänsel, Setup, Electronics
|
HV-Kapton-PIN-assignment
CCUM-to-Module Adapter-Cards |
Fri Feb 27 14:03:53 2009, Stephan Hänsel, Setup, Setup 3D
|
|
Fri Feb 27 13:34:11 2009, Stephan Hänsel, Measurements, ARCs Noise PIoff + channels 2 repair
|
|
Wed Feb 25 09:57:15 2009, Stephan Hänsel, Measurements, Sensor IV-Kurven + CV-Messungen (vor Modulbau)
|
|
Wed Oct 1 11:42:44 2008, stephan hänsel, Setup, Modulkomponenten
|
MODULE 0
1 Sensor Module (SiLC01):
Hybrid: TEC_6D.2.1 / 30216662133923 |