ID |
Date |
Author |
Type |
Subject |
Text |
|
6
|
Thu Oct 22 08:04:51 2009 |
Stephan Hänsel | Setup | geometry - silicon envelope | distance si-sledge-front to silicon-Z-center
= 23 cm
-> silicon sledge front 35 cm |
|
13
|
Mon Nov 2 13:59:09 2009 |
Stephan Hänsel | Setup | ToDo before data-taking | in hut:
plug twisted pair cable
from CCUM into PC (Attention - connector |
|
4
|
Fri Feb 27 14:03:53 2009 |
Stephan Hänsel | Setup | Setup 3D | |
|
2
|
Wed Feb 25 09:57:15 2009 |
Stephan Hänsel | Measurements | Sensor IV-Kurven + CV-Messungen (vor Modulbau) |
|
|
31
|
Fri Nov 27 12:23:25 2009 |
Stephan Hänsel | Measurements | Run 20077 - Pedestal | 16196 events
with 2 Micromegas modules
Beam: 5,6 GeV |
|
30
|
Fri Nov 27 12:22:19 2009 |
Stephan Hänsel | Measurements | Run 20075 - Micromegas 817 | 46196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ
stopped at 46195 events) |
|
29
|
Fri Nov 27 12:21:00 2009 |
Stephan Hänsel | Measurements | Run 20074 - Micromegas 816 | 10010 events
with 2 Micromegas modules (TPCDAQ
stopped at 10003 events) |
|
28
|
Thu Nov 5 19:46:15 2009 |
Stephan Hänsel | Measurements | Run 20073 - Micromegas 815 | 10070 events
with 2 Micromegas modules (TPCDAQ
stopped at 9864 events) |
|
27
|
Thu Nov 5 19:44:28 2009 |
Stephan Hänsel | Measurements | Run 20070 - positionrun | 2257 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
|
26
|
Thu Nov 5 19:36:48 2009 |
Stephan Hänsel | Measurements | Run 20069 - pedestal | 13600 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
|
25
|
Thu Nov 5 19:34:58 2009 |
Stephan Hänsel | Measurements | Run 20065 - pedestal | 18400 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
|
24
|
Thu Nov 5 19:33:53 2009 |
Stephan Hänsel | Measurements | Run 20064 - pedestal | 12199 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
|
23
|
Wed Nov 4 18:24:48 2009 |
Stephan Hänsel | Measurements | Run 20063 - Micromegas #808 | crashed at 18577 events - TPC 19220 events
Beam: 5,6 GeV
one Micromegas module in center position |
|
22
|
Wed Nov 4 18:19:44 2009 |
Stephan Hänsel | Measurements | Run 20062 - data | 6493 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
|
21
|
Wed Nov 4 17:12:47 2009 |
Stephan Hänsel | Measurements | Run 20061 - Latency Scan -> 70 | LATENCY IS SET TO 70
spillsize = 500
|
|
20
|
Wed Nov 4 16:31:42 2009 |
Stephan Hänsel | Measurements | Run 20059 - Micromegas #807 | crashed at 3648 events -> TPC got much
more events
Beam: 5,6 GeV |
|
19
|
Wed Nov 4 16:12:33 2009 |
Stephan Hänsel | Measurements | Run 20057 - Micromegas #806 | 1076 events
trigger rate 7,25Hz
bx = real trigger number |
|
18
|
Wed Nov 4 16:10:24 2009 |
Stephan Hänsel | Measurements | Run 20056 - Micromegas #805 | 10989 events
HV: 200V -> 2µA
LV: |
|
16
|
Wed Nov 4 15:29:00 2009 |
Stephan Hänsel | Measurements | Run 20055 - Pedestal | |
|
17
|
Wed Nov 4 15:31:39 2009 |
Stephan Hänsel | Measurements | Run 20055 - Pedestal | 15399 triggers
HV: 200V -> 2µA
LV: |
|
11
|
Fri Oct 23 08:09:04 2009 |
Stephan Hänsel | Measurements | Run 11273 - data | B=0, TPC inbetween but no TPC readout
Beam: 3GeV
silicon position from TPC-support-ring: |
|
10
|
Fri Oct 23 08:02:57 2009 |
Stephan Hänsel | Measurements | Run 11271 - position run | B=0, TPC inbetween but no TPC readout
Beam: 3GeV
moved silicon to center position |
|
9
|
Fri Oct 23 07:57:01 2009 |
Stephan Hänsel | Measurements | Run 11270 - latency scan | B=0, TPC inbetween but no TPC readout
scan from 70 to 120 with 1000 events
each |
|
8
|
Fri Oct 23 07:52:52 2009 |
Stephan Hänsel | Measurements | Run 11269 - Pedestal Run | B=0, TPC inbetween but no TPC readout |
|
7
|
Thu Oct 22 11:18:34 2009 |
Stephan Hänsel | Setup | Pictures | Photo
Gallery
zusätliche Photos: |
|
1
|
Wed Oct 1 11:42:44 2008 |
stephan hänsel | Setup | Modulkomponenten | MODULE 0
1 Sensor Module (SiLC01):
Hybrid: TEC_6D.2.1 / |
|
5
|
Thu Oct 22 08:02:26 2009 |
Stephan Hänsel | Setup | Electronics | HV-Kapton-PIN-assignment
|
|
12
|
Mon Nov 2 13:22:50 2009 |
Stephan Hänsel | Setup | DAQ | start data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X |
|
14
|
Tue Nov 3 10:45:01 2009 |
Stephan Hänsel | Setup | Beam On | clear test beam areas:
go to T24 (front area):
use (red) key from interlock
|
|
15
|
Tue Nov 3 11:18:46 2009 |
Stephan Hänsel | Setup | Beam Off | close shutter:
close shutter T24/1 with
the button "Beam Shutter zu" |
|
3
|
Fri Feb 27 13:34:11 2009 |
Stephan Hänsel | Measurements | ARCs Noise PIoff + channels 2 repair |
|
|