Fri Nov 27 12:23:25 2009, Stephan Hänsel, Measurements, Run 20077 - Pedestal 
 | 
16196 events
 
with 2 Micromegas modules
 
Beam: 5,6 GeV | 
   Fri Nov 27 12:22:19 2009, Stephan Hänsel, Measurements, Run 20075 - Micromegas 817    
 | 
46196 events (usable: 42433 events)
 
with 2 Micromegas modules (TPCDAQ stopped at 46195 events)
 
Beam: 5,6 GeV | 
   Fri Nov 27 12:21:00 2009, Stephan Hänsel, Measurements, Run 20074 - Micromegas 816   
 | 
10010 events
 
with 2 Micromegas modules (TPCDAQ stopped at 10003 events)
 
Beam: 5,6 GeV | 
   Thu Nov  5 19:46:15 2009, Stephan Hänsel, Measurements, Run 20073 - Micromegas 815   
 | 
10070 events
 
with 2 Micromegas modules (TPCDAQ stopped at 9864 events)
 
Beam: 5,6 GeV | 
   Thu Nov  5 19:44:28 2009, Stephan Hänsel, Measurements, Run 20070 - positionrun 
 | 
2257 events without Micromegas
 
Beam: 5,6 GeV
 
silicon sledge 35cm inside from TPC-support-front and 36mm above center position | 
   Thu Nov  5 19:36:48 2009, Stephan Hänsel, Measurements, Run 20069 - pedestal 
 | 
13600 events without Micromegas
 
Beam: 5,6 GeV
 
silicon sledge 35cm inside from TPC-support-front | 
   Thu Nov  5 19:34:58 2009, Stephan Hänsel, Measurements, Run 20065 - pedestal 
 | 
18400 events without Micromegas
 
Beam: 5,6 GeV
 
silicon sledge 35cm inside from TPC-support-front | 
   Thu Nov  5 19:33:53 2009, Stephan Hänsel, Measurements, Run 20064 - pedestal 
 | 
12199 events without Micromegas
 
Beam: 5,6 GeV
 
silicon sledge 35cm inside from TPC-support-front | 
   Wed Nov  4 18:24:48 2009, Stephan Hänsel, Measurements, Run 20063 - Micromegas #808 
 | 
crashed at 18577 events - TPC 19220 events
 
Beam: 5,6 GeV
 
one Micromegas module in center position | 
   Wed Nov  4 18:19:44 2009, Stephan Hänsel, Measurements, Run 20062 - data 
 | 
6493 events without Micromegas
 
Beam: 5,6 GeV
 
silicon sledge 35cm inside from TPC-support-front | 
   Wed Nov  4 17:12:47 2009, Stephan Hänsel, Measurements, Run 20061 - Latency Scan -> 70 
 | 
LATENCY IS SET TO 70
 
spillsize = 500
 
  | 
   Wed Nov  4 16:31:42 2009, Stephan Hänsel, Measurements, Run 20059 - Micromegas #807 
 | 
crashed at 3648 events -> TPC got much more events
 
Beam: 5,6 GeV
 
one Micromegas module in center position | 
   Wed Nov  4 16:12:33 2009, Stephan Hänsel, Measurements, Run 20057 - Micromegas #806 
 | 
1076 events
 
trigger rate 7,25Hz
 
bx = real trigger number | 
   Wed Nov  4 16:10:24 2009, Stephan Hänsel, Measurements, Run 20056 - Micromegas #805 
 | 
10989 events
 
HV: 200V -> 2µA
 
LV: | 
   Wed Nov  4 15:31:39 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal 
 | 
15399 triggers
 
HV: 200V -> 2µA
 
LV:  | 
   Wed Nov  4 15:29:00 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal 
 | 
|   | 
   Tue Nov  3 11:18:46 2009, Stephan Hänsel, Setup, Beam Off 
 | 
close shutter:
 
 
    close shutter T24/1 with the button "Beam  Shutter zu" (green) -> bottom green light next to the keys  should go on
 
 
   close shutter T24 with the button "Beam  Shutter auf" (green) -> bottom green light next to the keys should go on
 
    turn | 
   Tue Nov  3 10:45:01 2009, Stephan Hänsel, Setup, Beam On 
 | 
clear test beam areas:
 
go to T24 (front area):
 
 
    use (red) key from interlock
 
    go into T24 area, close door, use red key in keyhole next to door -> big red light on
 
 | 
   Mon Nov  2 13:59:09 2009, Stephan Hänsel, Setup, ToDo before data-taking 
 | 
in hut:
 
 
    plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you 
look from the back of the PC))
 
    power on CCUM in spacing behind electronic hut
 
    switch on opto-electrical converter for FED (on | 
   Mon Nov  2 13:22:50 2009, Stephan Hänsel, Setup, DAQ 
 | 
start data-taking:
 
ssh xxx@bastion.desy.de -X
 
ssh xdaq@flctpcikhero1.desy.de -X | 
   Fri Oct 23 08:09:04 2009, Stephan Hänsel, Measurements, Run 11273 - data 
 | 
B=0, TPC inbetween but no TPC readout
 
Beam: 3GeV
 
silicon position from TPC-support-ring:  | 
   Fri Oct 23 08:02:57 2009, Stephan Hänsel, Measurements, Run 11271 - position run 
 | 
B=0, TPC inbetween but no TPC readout
 
Beam: 3GeV
 
moved silicon to center position (~58cm from TPC-support-ring) | 
   Fri Oct 23 07:57:01 2009, Stephan Hänsel, Measurements, Run 11270 - latency scan 
 | 
B=0, TPC inbetween but no TPC readout
 
scan from 70 to 120 with 1000 events each
 
root-diagram -> latency ~ 75 | 
   Fri Oct 23 07:52:52 2009, Stephan Hänsel, Measurements, Run 11269 - Pedestal Run 
 | 
| B=0, TPC inbetween but no TPC readout | 
   Thu Oct 22 11:18:34 2009, Stephan Hänsel, Setup, Pictures 
 | 
Photo Gallery
 
zusätliche Photos:
 
labeled SiLC in front of TPC | 
   Thu Oct 22 08:04:51 2009, Stephan Hänsel, Setup, geometry - silicon envelope  
 | 
distance si-sledge-front to silicon-Z-center = 23 cm
 
-> silicon sledge front 35 cm inside from front of TPC-support at a beam position 58 cm from front of TPC-support
 
 | 
   Thu Oct 22 08:02:26 2009, Stephan Hänsel, Setup, Electronics 
 | 
HV-Kapton-PIN-assignment 
 
  
 
CCUM-to-Module Adapter-Cards  | 
   Fri Feb 27 14:03:53 2009, Stephan Hänsel, Setup, Setup 3D  
 | 
|   | 
   Fri Feb 27 13:34:11 2009, Stephan Hänsel, Measurements, ARCs Noise PIoff + channels 2 repair  
 | 
 
 
 
        
 
    
 
         | 
   Wed Feb 25 09:57:15 2009, Stephan Hänsel, Measurements, Sensor IV-Kurven + CV-Messungen (vor Modulbau)  
 | 
 
 
 
    
 
    
 
        
 
             | 
   Wed Oct  1 11:42:44 2008, stephan hänsel, Setup, Modulkomponenten 
 | 
MODULE 0
 
1 Sensor Module (SiLC01):
 
   Hybrid: TEC_6D.2.1 / 30216662133923 |