Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 3 of 4  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTimedown EndTime Data Text Attachments
  38   Fri Oct 19 00:56:16 2012 Markus FriedlMicronOrigami_grossrunrun01719789919.10.2012 00:54:2119.10.2012 14:10:02 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-50V, Ibias=76A
  
  37   Fri Oct 19 00:45:52 2012 Markus FriedlMicronOrigami_grossrunrun0161185519.10.2012 00:24:0519.10.2012 00:48:24Crap 
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
  
  35   Wed Oct 17 21:30:39 2012 Markus FriedlMicronOrigami_grosscalcal0088380017.10.2012 17:15:1317.10.2012 18:08:11GoodInternal calibration for "stealth
parasitic" mode Belle stack; taken without
beam
 currents.pngcurrents2.png 
  33   Wed Oct 17 05:16:22 2012 Christian IrmlerMicronOrigami_grossrunrun0155400517.10.2012 05:10:0617.10.2012 07:27:20UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 run015_temperatures.JPG 
  31   Tue Oct 16 23:35:28 2012 Christian IrmlerMicronOrigami_grossrunrun014150k16.10.2012 23:32:2417.10.2012 04:59:02 UnknownSame as run011, but now with +- 50V bias
voltage.
Origami Stack 2: Origami #4, #3,
 run014_temperatures.jpg 
  29   Tue Oct 16 22:19:21 2012 Christian IrmlerMicronOrigami_grosscalcal0078380016.10.2012 20:25:17 16.10.2012 21:12:01 UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V, Ibias=12.3µA
  
  28   Tue Oct 16 13:59:46 2012 Christian IrmlerMicronOrigami_grossrunrun013150k16.10.2012 13:43:0516.10.2012 20:21:04UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 belle_2_temperatures.jpg 
  27   Tue Oct 16 11:23:43 2012 Christian IrmlerMicronOrigami_grossrunrun01220k16.10.2012 11:16:0116.10.2012 12:27:03 UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA
 belle_2a_temperatures.jpg 
  26   Tue Oct 16 11:07:17 2012 Christian IrmlerMicronOrigami_grosscalcal0068380016.10.2012 10:30:3416.10.2012 11:00:51UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
  
  25   Tue Oct 16 05:24:21 2012 Christian IrmlerMicronOrigami_grossrun ATTENTION: wrong bias voltagerun011150k16.10.2012 05:19:28 16.10.2012 09:59:24CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  32   Wed Oct 17 01:21:50 2012 Marko DragicevicInfineonrunrun009150k15.10.2012 08:20:1515.10.2012 11:01:11Unknown This run was not recorded in original
sequence in the ELOG!!!
 
  
  19   Mon Oct 15 00:08:26 2012 Marko DragicevicInfineonrunrun00833907515.10.2012 01:49:3315.10.2012 08:04:24Unknown Infineon Stack Version
2 (no height information, BabyStrips vertical
  
  24   Mon Oct 15 23:26:52 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun010158k15.10.2012 23:10:40 16.10.2012 05:05:35CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Same as run009.
  
  23   Mon Oct 15 22:13:28 2012 Marko DragicevicMicronOrigami_grosscal ATTENTION: wrong bias voltage cal0058380015.10.2012 22:16:2615.10.2012 23:07:37 UnknownATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  22   Mon Oct 15 19:40:03 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun0093165015.10.2012 19:28:30 15.10.2012 22:08:31 CrapATTENTION! Bias voltage was +-100 V instead
of +-50 V 
Origami Stack 2: Origami #4, #3,
  
  18   Sun Oct 14 23:01:11 2012 Marko DragicevicInfineoncalcal0048380014.10.2012 21:44:0014.10.2012 21:03:00UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
  
  17   Sun Oct 14 20:12:14 2012 Marko DragicevicInfineonrunrun007110k14.10.2012 20:07:1214.10.2012 21:04:12UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3uA
  
  16   Sun Oct 14 09:08:42 2012 Manfred ValentanMicronBabyrunrun006300k14.10.2012 09:01:15 UnknownMicron baby intermediate stack
HV = -100V   I=6.9uA
beam on
  
  15   Sun Oct 14 08:25:10 2012 Manfred ValentanMicronBabycalcal0038380014.10.2012 08:21:4614.10.2012 08:51:58UnknownMicron baby intermediate stack
HV = -100 V
I = 6.9 uA
  
  14   Sun Oct 14 02:02:39 2012 Manfred ValentanMicronBabyrunrun005300k14.10.2012 02:00:0814.10.2012 08:17:02UnknownMicron baby intermediate stack
HV = -100V   I=6.3uA
beam on
  
ELOG V3.1.5-fc6679b