| 
|  Tue Oct 16 11:07:17 2012, Christian Irmler, MicronOrigami_gross, cal, cal006, 83800, 16.10.2012  10:30:34, 16.10.2012  11:00:51, Unknown |  | Origami Stack 2a: Origami #4, Wedge new1 reading out all 6 APV of p-side
 HV = +-40V, Ibias=5.12µA
 |  |  Tue Oct 16 11:23:43 2012, Christian Irmler, MicronOrigami_gross, run, run012, 20k, 16.10.2012  11:16:01, 16.10.2012  12:27:03 , Unknown   |  | Origami Stack 2a: Origami #4, Wedge new1 reading out all 6 APV of p-side
 HV = +-40V, Ibias=10.4µA
 |  |  Tue Oct 16 13:59:46 2012, Christian Irmler, MicronOrigami_gross, run, run013, 150k, 16.10.2012  13:43:05, 16.10.2012  20:21:04, Unknown   |  | Origami Stack 2: Origami #4, #3, Wedge new1, old HV = +-50V
 Ibias=5.2µA
 |  |  Tue Oct 16 22:19:21 2012, Christian Irmler, MicronOrigami_gross, cal, cal007, 83800, 16.10.2012  20:25:17 , 16.10.2012  21:12:01 , Unknown |  | Origami Stack 2: Origami #4, #3, Wedge new1, old HV = +-50V, Ibias=12.3µA
 Position: verticallbtween APV 1&2 of 6,  left side of sensor,
 |  |  Tue Oct 16 23:03:09 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown    |  | So steuert man einen Testbeam! 
 |  |  Tue Oct 16 23:35:28 2012, Christian Irmler, MicronOrigami_gross, run, run014, 150k, 16.10.2012  23:32:24, 17.10.2012  04:59:02 , Unknown   |  | Same as run011, but now with +- 50V bias voltage. Origami Stack 2: Origami #4, #3, Wedge new1, old
 HV = +-10V
 |  |  Wed Oct 17 01:21:50 2012, Marko Dragicevic, Infineon, run, run009, 150k, 15.10.2012 08:20:15, 15.10.2012 11:01:11, Unknown |  | This run was not recorded in original sequence in the ELOG!!! 
 
 
 
 
 |  |  Wed Oct 17 05:16:22 2012, Christian Irmler, MicronOrigami_gross, run, run015, 54005, 17.10.2012  05:10:06, 17.10.2012  07:27:20, Unknown   |  | Origami Stack 2: Origami #4, #3, Wedge new1, old HV = +-50V
 Ibias=4.43µA
 |  |  Thu Oct 18 09:14:07 2012, Manfred Valentan, common, Fahrt nach Mol, , , , , Unknown |  | Liebe Kollegen, wir brechen. auf. Wünscht uns Glück!
 |  |  Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012  16:04:47, 23.10.2012  23:04:56, Unknown |  | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2 HV = +-10V, Ibias=36uA
 Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
 |  |  Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012  23:10:14, 24.10.2012  08:19:51, Unknown |  | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2 HV = +-5V, Ibias=23.5uA
 Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
 = p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
 #3
 = n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
 SPS Status during whole run: Still problems with North
 |  |  Wed Oct 24 08:25:04 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal027, 83800, 24.10.2012  08:22:25, 24.10.2012  09:10:19, Unknown |  | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2 HV = +-5V, Ibias=23.5uA
 Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
 = p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
 #3
 = n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 |  |  Wed Oct 24 09:51:41 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal028, 83800, 24.10.2012  09:50:53, 24.10.2012  10:39:43, Unknown |  | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2 HV = +-2.5V, Ibias=14.5uA
 Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
 = p: 2DSSD #2, Origami3 #3, Origami1 #3,
 wedgenew #3
 = n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 |  |  Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown |  | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
 HV = +-2.5V, Ibias=14.5uA
 |  |  Sun Oct 28 08:37:53 2012, Christian Irmler, MicronOrigami_gross, run, run033, 66937, 28.10.2012  08:33:42, 28.10.2012  14:10:43 , Unknown    |  | Belle stack 2 after gamma irradiation HV = +50V -50V
 I = 101 uA
 |  |  Mon Oct 29 04:02:16 2012, Manfred Valentan, MicronBaby, run, run036, 296294, 29.10.2012  03:53:33, 29.10.2012  11:05:35, Unknown |  | Micron Baby stack 2 after irradiation (intermediate strips) HV = -100 V
 I = 36 uA
 |  |  Mon Oct 29 23:13:52 2012, Markus Friedl, HPK_baby, run, run038, 476500, 29.10.2012  23:13:05, 30.10.2012  10:22:54, Unknown |  | HPK baby stack after irradiation with partial cooling (HPK neutron & HPK neutron/gamma) HV = +75 V  -75V
 I =  176A
 |  |  Tue Oct 30 11:05:32 2012, Markus Friedl, HPK_baby, run, run039, 150k, 30.10.2012  11:03:19, 30.10.2012  14:57:57, Unknown |  | HPK baby stack after irradiation - no cooling I =  420A and growing (warming up)
 positioned centered on p and n
 |  |  Tue Oct 30 17:24:01 2012, Markus Friedl, MicronOrigami_gross, cal, cal040, 83800, 30.10.2012  17:20:28 , 30.10.2012  17:54:09, Unknown |  | Cooling for 2DSSD established after some struggle. 2DSSD fully read out with cooling
 HV= +40 V -40 V    I = 2 uA
 |  |  Tue Oct 30 18:35:51 2012, Christian Irmler, MicronOrigami_gross, run, run040, 100k, 30.10.2012  18:23:21, 30.10.2012  21:55:53 , Unknown   |  | Cooling for 2DSSD established after some struggle. 2DSSD fully read out with cooling
 HV= +40 V -40 V    I = 2.1 uA
 |  |