Sat Oct 13 19:04:02 2012, Manfred Valentan, MicronOrigami_gross, run with Belle stack 3, run003, 30k, 13.10.2012 19:02:31, , Unknown
|
Belle stack 3: 2DSSD-Origami, Wedge_New_1, Wedge_old
HV = +- 50V
I_ges = 11.6 µA |
Sat Oct 13 23:01:54 2012, Markus Friedl, MicronOrigami_gross, run with Belle stack 3, run004, 30k, 13.10.2012 21:41:34, 13.10.2012 22:57:48, Unknown
|
Belle stack 3, other position (CE)
Position of xy table: |
Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA |
Mon Oct 15 19:40:03 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run009, 31650, 15.10.2012 19:28:30 , 15.10.2012 22:08:31 , Crap
|
ATTENTION! Bias voltage was +-100 V instead of +-50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V |
Mon Oct 15 23:26:52 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run010, 158k, 15.10.2012 23:10:40 , 16.10.2012 05:05:35, Crap
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Same as run009.
Origami Stack 2: Origami #4, #3, Wedge new1, old |
Tue Oct 16 05:24:21 2012, Christian Irmler, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run011, 150k, 16.10.2012 05:19:28 , 16.10.2012 09:59:24, Crap
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V |
Fri Oct 12 23:10:14 2012, Christian Irmler, MicronBaby, run, run001, 333000, 12.10.2012 23:05:19, 13.10.2012 06:29:00, Good
|
Micron baby stack
HV = -100V I=5.8uA
beam on |
Sat Oct 13 06:55:47 2012, Manfred Valentan, MicronBaby, run, run002, 234019, 13.10.2012 06:50:00, 13.10.2012 13:50:40, Unknown
|
Micron baby stack
HV = -100V I=5.4uA
beam on |
Sun Oct 14 02:02:39 2012, Manfred Valentan, MicronBaby, run, run005, 300k, 14.10.2012 02:00:08, 14.10.2012 08:17:02, Unknown
|
Micron baby intermediate stack
HV = -100V I=6.3uA
beam on |
Sun Oct 14 09:08:42 2012, Manfred Valentan, MicronBaby, run, run006, 300k, 14.10.2012 09:01:15, , Unknown
|
Micron baby intermediate stack
HV = -100V I=6.9uA
beam on |
Sun Oct 14 20:12:14 2012, Marko Dragicevic, Infineon, run, run007, 110k, 14.10.2012 20:07:12, 14.10.2012 21:04:12, Unknown
|
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V I=3uA
beam on |
Mon Oct 15 00:08:26 2012, Marko Dragicevic, Infineon, run, run008, 339075, 15.10.2012 01:49:33, 15.10.2012 08:04:24, Unknown
|
Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)
HV = 300V I=4uA
beam on |
Tue Oct 16 11:23:43 2012, Christian Irmler, MicronOrigami_gross, run, run012, 20k, 16.10.2012 11:16:01, 16.10.2012 12:27:03 , Unknown
|
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA |
Tue Oct 16 13:59:46 2012, Christian Irmler, MicronOrigami_gross, run, run013, 150k, 16.10.2012 13:43:05, 16.10.2012 20:21:04, Unknown
|
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=5.2µA |
Tue Oct 16 23:35:28 2012, Christian Irmler, MicronOrigami_gross, run, run014, 150k, 16.10.2012 23:32:24, 17.10.2012 04:59:02 , Unknown
|
Same as run011, but now with +- 50V bias voltage.
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-10V |
Wed Oct 17 01:21:50 2012, Marko Dragicevic, Infineon, run, run009, 150k, 15.10.2012 08:20:15, 15.10.2012 11:01:11, Unknown
|
This run was not recorded in original sequence in the ELOG!!!
|
Wed Oct 17 05:16:22 2012, Christian Irmler, MicronOrigami_gross, run, run015, 54005, 17.10.2012 05:10:06, 17.10.2012 07:27:20, Unknown
|
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=4.43µA |
Fri Oct 19 00:45:52 2012, Markus Friedl, MicronOrigami_gross, run, run016, 11855, 19.10.2012 00:24:05, 19.10.2012 00:48:24, Crap
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A |
Fri Oct 19 00:56:16 2012, Markus Friedl, MicronOrigami_gross, run, run017, 197899, 19.10.2012 00:54:21, 19.10.2012 14:10:02 , Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=76A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Fri Oct 19 19:25:29 2012, Markus Friedl, MicronOrigami_gross, run, run018, 318756, 19.10.2012 19:23:55, 20.10.2012 10:27:11, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
|