Entry  Tue Oct 4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011 11:29:19, 04.10.2011 13:57:54, Good 

hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD

Position of HEPHY x-z-table:
x = 336
z = 89

Entry  Tue Oct 4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011 19:36:50, Crap 

HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.

hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD

Position of HEPHY x-z-table:
x = 322
z = 89

Entry  Fri Oct 7 10:13:12 2011, Christian Irmler, BELLE, Origami stack cooled, run013, 185k, 07.10.2011 10:02:20, 07.10.2011 17:17:32, Good 

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=321 y=99
I=18.6µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltage

The beam is directly focused onto APV chip #2 of n-side, so that it hits the area underneath chip and cooling pipe.
On p-side this location is attached to chip #4, which currently can not be read out, hence we only get data for the n-side.

currents:
07.10.2011  10:03:22  event=979  rate=0events/s temp/curr=33.2/-05.6 33.3/-06.0 33.2/-06.7 32.2/001.6 32.2/002.0 32.2/018.7
07.10.2011  17:17:18  event=184992  rate=0events/s temp/curr=33.8/-05.6 33.8/-06.0 33.8/-06.9 32.7/001.7 32.7/002.0 32.7/018.7
 

Entry  Sat Oct 8 00:14:37 2011, Christian Irmler, BELLE, Origami stack, run015, 180111, 08.10.2011 00:06:41, 08.10.2011 08:24:38, Good 

Origami6
HV=+-40V,
no cooling
beam on; xy table position x=306 y=74.5
Istart=57µA;
std. I2C settings

centered

currents:
8.10.2011  00:07:43  event=991  rate=0events/s temp/curr=33.0/-15.4 33.0/-17.3 33.0/-17.7 31.9/011.5 31.9/013.2 32.0/040.20
...

08.10.2011  06:32:34  event=179710  rate=0events/s temp/curr=33.1/-22.1 33.0/-25.6 33.1/-22.6 31.9/018.2 31.8/021.7 31.9/048.5
08.10.2011  06:33:28  event=180105  ***WARNING*** Error detected in APV 0, subevent 2. Event discarded, reset sent.
 

Permanent APV errors at several (all p-side, some n-side) APV chips after 180105 events, which could not be recovered by software resets. After restart of run, all APVs where alive again, hence hardware reset and I2C reconfiguration after 5 or 10 consecutive APV errors should be added to TUXDAQ software.

After APV errors occured, the cummulative bias current decrised from 78µA to 54µA. This effect can occures whenever the digital part of the APV is switched between idle and full operation. It seems that this is a thermal effect, caused by  the slightly higher power consumption of the digital part of the chips.

 

Entry  Thu Oct 6 17:36:47 2011, Christian Irmler, BELLE, Origami stack cooled, run011, 180000, 06.10.2011 17:06:38, 07.10.2011 00:04:06, Good 

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=260.8 y=60.25
I=19.4µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltages 

beam focused on APV #0 of p- and n-side, respectively

currents:
06.10.2011  17:07:41  event=639  rate=3events/s temp/curr=35.2/-05.6 35.2/-06.0 35.2/-06.9 34.5/001.7 34.5/002.2 34.5/019.6

Entry  Wed Oct 5 19:57:15 2011, Christian Irmler, BELLE, Origami stack cooled , run007, 17845, 05.10.2011 18:27:51, 05.10.2011 19:31:43, Crap 

Run stopped after 17845 events, because of bad trigger timing

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.77 bar
mass flow = 0.9 g/s

I=20µA

longterm files (same files used for cal005 and run006):
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  19:30:51  event=17469  rate=0events/s temp/curr=35.6/-05.6 35.6/-06.1 35.6/-07.1 35.1/001.9 35.1/002.4 35.1/020.9
 

Entry  Wed Feb 22 12:15:11 2012, Christian Irmler, BELLE, Origami Module #4, run102, 170k, 22.02.2012 12:31:08, 22.02.2012 13:03:27 , Good 

same as run101

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA
CO2 cooling on, Tin=-20.2°C, Tout=-21.3°C

I²C settings for cooled APV chips --> same as used in run010
e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator.

CO2 empty after 24497 events --> run stopped --> no corresponding calibration available, but for rought analysis cal100 can be used for this run, too

Entry  Sat Oct 8 16:45:14 2011, Thomas Bergauer, HPK, baby_std, run018, 150000, 08.10.2011 16:44:13, 08.10.2011 19:33:33, Good 

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings, now with correct timing

Entry  Sat Oct 8 20:33:58 2011, Karl-Heinz Hoffmann, HPK, baby_std, run019, 150000, 08.10.2011 20:22:45, 08.10.2011 23:19:23, Good 

no cooling
beam on; xy table position x=333  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

Entry  Sun Oct 9 11:00:33 2011, Karl-Heinz Hoffmann, HPK, baby_add, run021, 150000, 09.10.2011 10:56:47, 09.10.2011 12:47:23, Good 

no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
std. I2C settings

Entry  Mon Oct 10 12:15:52 2011, Manfred Valentan, CNM, CNM stack, run024, 110000, 10.10.2011 12:03:58, 10.10.2011 14:05:56, Good 

no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

Entry  Mon Oct 10 14:11:53 2011, Christian Irmler, CNM, CNM stack, run025, 110000, 10.10.2011 14:09:00, 10.10.2011 16:11:57, Good 

no cooling
beam on; xy table position x=335.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 31 / 1.4 uA;  Istart_BSTD= 0.2 uA

Entry  Wed Oct 5 20:28:00 2011, Markus Friedl, BELLE, Origami stack cooled, run008, 10582, 05.10.2011 20:25:10, 05.10.2011 20:45:10, Good 

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on
I=20.5µA; new I2C settings; corrected trigger delay (htr)

New run with cold Origami and new I2C settings (shorter peaking time) and hopefully correct timing.

corresponding cal file: cal007

Entry  Wed Feb 22 13:37:11 2012, Christian Irmler, BELLE, Origami Module #4, run103, 100k, 22.02.2012 13:35:08, 22.02.2012 13:54:08 , Crap 

Sr90, large scintillator,
HVret @ Origami closed
HVret @ SMU connected
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

Wires between HV connectors ground and HVret conntact at the mambo were open --> no HVret conntection between module and SMUs!
Moreover the SMU Inv. Nr. 545-078 has either an unstable output or problems with the current measurement.

Entry  Wed Feb 22 16:21:23 2012, Christian Irmler, BELLE, Origami Module #4, run104, 100k, 22.02.2012 16:22:34, 22.02.2012 16:41:26, Good run104.jpgrun104_current.xls

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 1

J7... HV ret @ hybrid

APV 0 1 2 3 4 5 6 7
avg noise 2.564 2.124 2.094 2.200 1.696 1.666 1.870 1.888
CM noise 1.7 0.9 0.9 1.3 4.0 4.1 4.1 4.2

 

 

Entry  Wed Feb 22 17:38:29 2012, Christian Irmler, BELLE, Origami Module #4, run105, 100k, 22.02.2012 17:39:10 , 22.02.2012 17:58:01, Good run105.jpg

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as run104, but now J7 open

Again spikes in bias current!

 

Entry  Mon Mar 5 17:34:43 2012, Christian Irmler, BELLE, Origami Module #4, run108, 100k, , 05.03.2012 16:24:12, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 17:36:46 2012, Christian Irmler, BELLE, Origami Module #4, run109, 100k, 05.03.2012 17:36:19 , 05.03.2012 17:55:24 , Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 18:41:23 2012, Christian Irmler, BELLE, Origami Module #4, run110, 100k, 05.03.2012 18:45:21, 05.03.2012 19:04:30, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

Entry  Wed Mar 7 15:12:42 2012, Christian Irmler, BELLE, Origami Module #4, run112, 100k, 07.03.2012 15:13:18, 07.03.2012 14:31:07, Unknown 

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

ELOG V3.1.5-fc6679b