Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 1 of 5  Not logged in ELOG logo
Entry  Tue Oct 4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011 19:36:50, Crap 
HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.
hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
Position of HEPHY x-z-table:
Entry  Wed Oct 5 19:33:40 2011, Markus Friedl, common, Trigger condition, , , 4.10.2011 15:00, ,  trigger_path_with_veto.png
Changed trigger such that off-spill scintillator triggers are vetoed.
Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator
trigger.
Entry  Wed Feb 22 18:32:24 2012, Christian Irmler, BELLE, Origami Module #4, run107, 50k, 22.02.2012 18:30:33, 22.02.2012 18:40:11, Good run107_apv5_raw_data.jpgrun107.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 17:38:29 2012, Christian Irmler, BELLE, Origami Module #4, run105, 100k, 22.02.2012 17:39:10 , 22.02.2012 17:58:01, Good run105.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 18:10:29 2012, Christian Irmler, BELLE, Origami Module #4, run106, 50k, 22.02.2012 17:39:10 , 22.02.2012 18:23:47, Good run106.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 17:25:34 2012, Christian Irmler, BELLE, Origami Module #4, cal105, 83800, 22.02.2012 17:23:13 , 22.02.2012 17:34:27, Good 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 16:49:29 2012, Christian Irmler, BELLE, Origami Module #4, cal104, 83800, 22.02.2012 16:51:13, 22.02.2012 17:02:11, Good 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 16:21:23 2012, Christian Irmler, BELLE, Origami Module #4, run104, 100k, 22.02.2012 16:22:34, 22.02.2012 16:41:26, Good run104.jpgrun104_current.xls
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 13:37:11 2012, Christian Irmler, BELLE, Origami Module #4, run103, 100k, 22.02.2012 13:35:08, 22.02.2012 13:54:08 , Crap 
Sr90, large scintillator, 
HVret @ Origami closed
HVret @ SMU connected
Entry  Wed Feb 22 13:17:34 2012, Christian Irmler, BELLE, Origami Module #4, cal102, 83800, 22.02.2012 13:11:30, 22.02.2012 13:25:18, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA
Entry  Wed Feb 22 12:15:11 2012, Christian Irmler, BELLE, Origami Module #4, run102, 170k, 22.02.2012 12:31:08, 22.02.2012 13:03:27 , Good 
same as run101
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
Entry  Mon Feb 20 17:27:02 2012, Christian Irmler, BELLE, Origami Module #4, run101, 24497, 20.02.2012 17:33:33, 20.02.2012 17:38:21, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Feb 20 17:20:20 2012, Christian Irmler, BELLE, Origami Module #4, cal100, 50k, 20.02.2012 17:19:03, 20.02.2012 17:29:58, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Feb 20 17:17:27 2012, Christian Irmler, BELLE, Origami Module #4, run100, 50k, 20.02.2012 17:07:21, 20.02.2012 17:17:22, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Oct 10 21:54:24 2011, Marko Dragicevic, Micron, Micron-Baby-Stack p-spray, run bottom right, run027, 700k, 10.10.2011 22:40:31, 11.10.2011 09:49:11, Unknown 
hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
timing corrected w.r.t. run004
Position of HEPHY x-z-table:
Entry  Mon Oct 10 21:55:30 2011, Marko Dragicevic, Micron, Internal Calibration, cal013, 83800, 10.10.2011 21:52:32, , Unknown 
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
Entry  Mon Oct 10 16:26:20 2011, Marko Dragicevic, CNM, CNM stack, run026, 300000, 10.10.2011 16:23:46, 10.10.2011 20:30:00, Good 
no cooling
beam on; xy table position x=328  y=69.5
HV_CNM=20V, HV_BSTD1-N=200V
Entry  Mon Oct 10 14:11:53 2011, Christian Irmler, CNM, CNM stack, run025, 110000, 10.10.2011 14:09:00, 10.10.2011 16:11:57, Good 
no cooling
beam on; xy table position x=335.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Entry  Mon Oct 10 12:15:52 2011, Manfred Valentan, CNM, CNM stack, run024, 110000, 10.10.2011 12:03:58, 10.10.2011 14:05:56, Good 
no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Entry  Mon Oct 10 10:37:52 2011, Christian Irmler, CNM, CNM stack, cal012, 83800, 10.10.2011 11:29:55, 10.10.2011 11:40:55, Unknown 
no cooling
beam on; xy table position x=330  y=64
HV_CNM=20V, HV_BSTD1=200V
ELOG V3.1.5-fc6679b