Entry  Fri Oct 7 19:35:14 2011, Christian Irmler, BELLE, Origami stack cooled, run014, 90k, 07.10.2011 19:49:26, 07.10.2011 23:26:52, Good 

Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
beam on; xy table position x=306 y=74.5

centered

I=17.8µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltages 

CO2 pressure reduced to 14.9 bar --> temp is about 4K colder
Temp. at pipe inlet (K7) = -18°C
Temp. at pipe outlet (K8) = -21.8°C

currents:

07.10.2011  23:26:21  event=89786  rate=0events/s temp/curr=33.0/-05.3 33.0/-05.8 33.0/-06.6 31.9/001.4 32.0/001.9 31.9/017.7
 

Entry  Tue Oct 4 10:44:09 2011, Christian Irmler, Micron, Internal Calibration, cal002, 83800, 04.10.2011 10:04:49, 04.10.2011 10:19:41,  

micronbaby p-spray/irrad
HV = -100V
beam on,

irrad APVs with standard baseline settings --> too high

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

Entry  Tue Oct 4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011 10:33:50, 04.10.2011 10:48:51,  

micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

Entry  Tue Oct 4 10:47:59 2011, Manfred Valentan, Micron, Internal Calibration, cal001, 83800, 03.10.2011 20:34:48, 03.10.2011 20:50:57,  

micronbaby p-stop stack
HV = -100V
beam on

Entry  Tue Oct 4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011 21:18:09, 04.10.2011 21:50:23, Good 

Origami6
HV=+-40V, no cooling
beam on
I=91µA

longterm files (same files used for cal004 and run005):
It-pos-0410112056.txt 
It-neg-0410112056.txt  

currents and temperatures:
04.10.2011  21:50:13  event=83750  rate=50events/s temp/curr=35.2/-26.1 35.2/-28.7 35.2/-31.4 34.6/022.6 34.6/025.0 34.6/060.4
 

Entry  Wed Oct 5 12:09:00 2011, Christian Irmler, BELLE, Origami stack cooled wrong I2C settings, cal005, 83800, 05.10.2011 12:04:50, 05.10.2011 12:37:11, Crap 

This calibration file can not be used, due to wrong I2C settings!

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.77 bar
mass flow = 0.9 g/s

I=22.45µA

longterm files (same files used for cal005 and run006):
It-pos-0510111122.txt 
It-neg-0510111122.txt  

currents and temperatures:
05.10.2011  12:05:53  event=2883  rate=37events/s temp/curr=35.0/-05.6 35.0/-06.3 35.0/-06.9 34.2/001.9 34.1/002.5 34.1/022.6
05.10.2011  12:36:53  event=83350  rate=48events/s temp/curr=34.4/-05.5 34.5/-06.1 34.5/-06.9 33.9/001.7 33.9/002.4 33.9/022.5
 

Entry  Wed Oct 5 16:43:00 2011, Christian Irmler, BELLE, Origami stack cooled, cal006, 83800, 05.10.2011 16:40:18, 05.10.2011 17:12:27, Good 

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.2 bar
mass flow = 0.9 g/s

I=21.8µA

longterm files (same files used for cal005 and run006):
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  16:41:21  event=2850  rate=50events/s temp/curr=35.4/-05.8 35.3/-06.3 35.4/-07.2 34.9/002.0 34.9/002.5 34.9/021.7
05.10.2011  17:11:20  event=81237  rate=37events/s temp/curr=35.1/-05.8 35.1/-06.1 35.0/-07.1 34.5/002.0 34.5/002.5 34.5/021.4
 

Entry  Wed Oct 5 17:54:09 2011, Christian Irmler, BELLE, Origami stack cooled, cal007, 83800, 05.10.2011 17:51:57 , , Good 

I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.2 bar
mass flow = 0.9 g/s

I=18.0µA

longterm files
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  17:53:00  event=2900  rate=47events/s temp/curr=35.3/-05.6 35.3/-06.0 35.3/-06.9 34.6/001.9 34.8/002.2 34.8/020.7
 

Entry  Thu Oct 6 15:57:51 2011, Christian Irmler, BELLE, Origami stack cooled, cal008, 83800, 06.10.2011 15:53:20, 06.10.2011 16:25:29 , Good 

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=306 y=76.5
I=19.5µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltages

Temp. at pipe inlet (K7) = -14°C
Temp. at pipe outlet (K8) = -17°C

Before this run, the front-end voltages (+2.5 and +1.25) were readjusted so that the nominal values appear on MAMBO. (Previously, both were about 50mV too low.) Not sure if this makes a big difference, let's see.

currents:
06.10.2011  15:54:24  event=2901  rate=36events/s temp/curr=35.5/-05.6 35.5/-06.0 35.4/-06.9 34.9/001.9 35.0/002.2 35.0/019.6
06.10.2011  16:24:25  event=81350  rate=50events/s temp/curr=34.9/-05.6 34.9/-06.1 34.9/-06.9 34.3/001.7 34.3/002.2 34.3/019.6
 

Entry  Fri Oct 7 18:40:07 2011, Christian Irmler, BELLE, Origami stack cooled, cal009, 83800, 07.10.2011 18:35:04 , 07.10.2011 19:31:51, Good 

Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5

I=18.6µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltages 

CO2 pressure reduced to 14.9 bar --> temp is about 4K colder
Temp. at pipe inlet (K7) = -18°C
Temp. at pipe outlet (K8) = -21.8°C

used multi6 config instead of single hit config (cern11_origami_cooled2_multi6.cfg)

currents:
07.10.2011  18:36:07  event=1581  rate=31events/s temp/curr=33.9/-05.3 33.9/-05.6 33.9/-06.6 32.8/001.4 32.8/001.9 32.8/018.1

Entry  Sun Oct 9 10:05:34 2011, Markus Friedl, HPK, baby_std, cal010, 83800, 08.10.2011 13:36:25, 08.10.2011 13:54:07, Good 

HV=+-40V,
no cooling
beam off; xy table position x=  y=
HV= Istart=uA;
std. I2C settings
 

Entry  Sun Oct 9 10:13:11 2011, Karl-Heinz Hoffmann, HPK, baby_add, cal011, 83800, 09.10.2011 10:05:01, , Good 

no cooling
beam on; xy table position x=  y=
HV=200V Istart_P=1.5uA;  Istart_N=0.22uA
std. I2C settings

Entry  Mon Oct 10 10:37:52 2011, Christian Irmler, CNM, CNM stack, cal012, 83800, 10.10.2011 11:29:55, 10.10.2011 11:40:55, Unknown 

no cooling
beam on; xy table position x=330  y=64
HV_CNM=20V, HV_BSTD1=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

Entry  Mon Oct 10 21:55:30 2011, Marko Dragicevic, Micron, Internal Calibration, cal013, 83800, 10.10.2011 21:52:32, , Unknown 

micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line is open

Entry  Wed Feb 22 13:17:34 2012, Christian Irmler, BELLE, Origami Module #4, cal102, 83800, 22.02.2012 13:11:30, 22.02.2012 13:25:18, Good 

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA
CO2 cooling on, Tin=-20.2°C, Tout=-21.3°C

I²C settings for cooled APV chips --> same as used in run010
e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

Lab measurement with new dark box but old, large scintillator.

Entry  Wed Feb 22 16:49:29 2012, Christian Irmler, BELLE, Origami Module #4, cal104, 83800, 22.02.2012 16:51:13, 22.02.2012 17:02:11, Good 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 1

J7... HV ret @ hybrid

 

Entry  Wed Feb 22 17:25:34 2012, Christian Irmler, BELLE, Origami Module #4, cal105, 83800, 22.02.2012 17:23:13 , 22.02.2012 17:34:27, Good 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as cal104, but now J7 open

 

Entry  Mon Mar 5 17:35:31 2012, Christian Irmler, BELLE, Origami Module #4, cal108, 83800, 05.03.2012 16:47:51, 05.03.2012 17:05:16, Unknown run108-109.jpg

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 18:08:02 2012, Christian Irmler, BELLE, Origami Module #4, cal109, 83800, 05.03.2012 18:07:40, 05.03.2012 18:18:32, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 19:06:41 2012, Christian Irmler, BELLE, Origami Module #4, cal110, 83800, 05.03.2012 19:05:52, 05.03.2012 19:17:01, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid