Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 1 of 5  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTimedown EndTime Data
  29   Tue Oct 4 15:16:45 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom right NOT USABLErun004200k4.10.2011 15:28:4804.10.2011 19:36:50Crap

HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.

hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD

Position of HEPHY x-z-table:
x = 322
z = 89

  36   Wed Oct 5 19:33:40 2011 Markus FriedlcommonTrigger condition  4.10.2011 15:00  

Changed trigger such that off-spill scintillator triggers are vetoed.

Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator trigger.

This also changes the timing, which was unfortunately not detected until 30 hours later. Thus, runs 4-7 have bad (wrong) timing -> UNUSABLE

  83   Wed Feb 22 18:32:24 2012 Christian IrmlerBELLEOrigami Module #4run10750k22.02.2012 18:30:3322.02.2012 18:40:11Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 0 0 1

J7... HV ret @ hybrid

Same as run106, but now J7 closed

APV pedestals slightly unstable.

  81   Wed Feb 22 17:38:29 2012 Christian IrmlerBELLEOrigami Module #4run105100k22.02.2012 17:39:10 22.02.2012 17:58:01Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as run104, but now J7 open

Again spikes in bias current!

 

  82   Wed Feb 22 18:10:29 2012 Christian IrmlerBELLEOrigami Module #4run10650k22.02.2012 17:39:10 22.02.2012 18:23:47Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 0 0 0

J7... HV ret @ hybrid

Same as run105, but now J5 and J7 open

 

  80   Wed Feb 22 17:25:34 2012 Christian IrmlerBELLEOrigami Module #4cal1058380022.02.2012 17:23:13 22.02.2012 17:34:27Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as cal104, but now J7 open

 

  79   Wed Feb 22 16:49:29 2012 Christian IrmlerBELLEOrigami Module #4cal1048380022.02.2012 16:51:1322.02.2012 17:02:11Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 1

J7... HV ret @ hybrid

 

  78   Wed Feb 22 16:21:23 2012 Christian IrmlerBELLEOrigami Module #4run104100k22.02.2012 16:22:3422.02.2012 16:41:26Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 1

J7... HV ret @ hybrid

APV 0 1 2 3 4 5 6 7
avg noise 2.564 2.124 2.094 2.200 1.696 1.666 1.870 1.888
CM noise 1.7 0.9 0.9 1.3 4.0 4.1 4.1 4.2

 

 

  77   Wed Feb 22 13:37:11 2012 Christian IrmlerBELLEOrigami Module #4run103100k22.02.2012 13:35:0822.02.2012 13:54:08 Crap

Sr90, large scintillator,
HVret @ Origami closed
HVret @ SMU connected
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

Wires between HV connectors ground and HVret conntact at the mambo were open --> no HVret conntection between module and SMUs!
Moreover the SMU Inv. Nr. 545-078 has either an unstable output or problems with the current measurement.

  76   Wed Feb 22 13:17:34 2012 Christian IrmlerBELLEOrigami Module #4cal1028380022.02.2012 13:11:3022.02.2012 13:25:18Good

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA
CO2 cooling on, Tin=-20.2°C, Tout=-21.3°C

I²C settings for cooled APV chips --> same as used in run010
e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

Lab measurement with new dark box but old, large scintillator.

  75   Wed Feb 22 12:15:11 2012 Christian IrmlerBELLEOrigami Module #4run102170k22.02.2012 12:31:0822.02.2012 13:03:27 Good

same as run101

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA
CO2 cooling on, Tin=-20.2°C, Tout=-21.3°C

I²C settings for cooled APV chips --> same as used in run010
e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator.

CO2 empty after 24497 events --> run stopped --> no corresponding calibration available, but for rought analysis cal100 can be used for this run, too

  74   Mon Feb 20 17:27:02 2012 Christian IrmlerBELLEOrigami Module #4run1012449720.02.2012 17:33:3320.02.2012 17:38:21Good

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
CO2 cooling on, Tin=-16°C, Tout=-16,7°C

I²C settings for cooled APV chips --> same as used in run010.

Lab measurement with new dark box but old, large scintillator.

CO2 empty after 24497 events --> run stopped

  73   Mon Feb 20 17:20:20 2012 Christian IrmlerBELLEOrigami Module #4cal10050k20.02.2012 17:19:0320.02.2012 17:29:58Good

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
CO2 cooling on, Tin=-16°C, Tout=-16,7°C

standard I²C settings for uncooled APV chips.

Lab measurement with new dark box but old, large scintillator.

Calibration run for run100.

  72   Mon Feb 20 17:17:27 2012 Christian IrmlerBELLEOrigami Module #4run10050k20.02.2012 17:07:2120.02.2012 17:17:22Good

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
CO2 cooling on, Tin=-16°C, Tout=-16,7°C

standard I²C settings for uncooled APV chips.

Lab measurement with new dark box but old, large scintillator.

20.02.2012  17:08:27  event=5771  ***WARNING*** Error detected in APV 6, subevent 0. Event discarded, reset sent. --> APV 6 recovered afterwards

  68   Mon Oct 10 21:54:24 2011 Marko DragicevicMicronMicron-Baby-Stack p-spray, run bottom rightrun027700k10.10.2011 22:40:3111.10.2011 09:49:11Unknown

hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
timing corrected w.r.t. run004

Position of HEPHY x-z-table:
x = 322
z = 70

Note: z-Position not identical with position of run004, x-z-table seemed to have moved vertically. This configuration now hits the same sensor position.

  69   Mon Oct 10 21:55:30 2011 Marko DragicevicMicronInternal Calibrationcal0138380010.10.2011 21:52:32 Unknown

micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line is open

  67   Mon Oct 10 16:26:20 2011 Marko DragicevicCNMCNM stackrun02630000010.10.2011 16:23:4610.10.2011 20:30:00Good

no cooling
beam on; xy table position x=328  y=69.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 27 / 1.5 uA;  Istart_BSTD= 0.2 uA

  66   Mon Oct 10 14:11:53 2011 Christian IrmlerCNMCNM stackrun02511000010.10.2011 14:09:0010.10.2011 16:11:57Good

no cooling
beam on; xy table position x=335.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 31 / 1.4 uA;  Istart_BSTD= 0.2 uA

  63   Mon Oct 10 12:15:52 2011 Manfred ValentanCNMCNM stackrun02411000010.10.2011 12:03:5810.10.2011 14:05:56Good

no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

  62   Mon Oct 10 10:37:52 2011 Christian IrmlerCNMCNM stackcal0128380010.10.2011 11:29:5510.10.2011 11:40:55Unknown

no cooling
beam on; xy table position x=330  y=64
HV_CNM=20V, HV_BSTD1=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

ELOG V3.1.5-fc6679b