Mon Oct 4 16:15:48 2010, Christian Irmler, Pt, run, run042, 25600, 04.10.2010 16:12:52, 04.10.2010 16:35:18
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg
repetition of run040, but now biased :-)
telescope run 20148 |
Mon Oct 4 14:15:22 2010, Manfred Valentan, Pt, run, run040 --> unusable --> no bias, 25600, 04.10.2010 14:?:?, 04.10.2010 14:32:14
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 47 deg
telescope run 20146
bias voltage has been ramped down during run039 --> needs to be repeated. |
Mon Oct 4 12:24:38 2010, Erik Huemer, Pt, run, run038, 25600, 04.10.2010 12:22:09, 04.10.2010 12:43:40
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A
HV=200V beam on
angle: 43 deg
telescope run 20144 |
Mon Oct 4 11:43:05 2010, Christian Irmler, Pt, run, run037, 25600, 04.10.2010 11:40:15, 04.10.2010 12:15:03
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg
telescope run 20143 |
Mon Oct 4 10:43:45 2010, Marko Dragicevic, Pt, run, run036, 25600, 04.10.2010 10:33:05, 04.10.2010 11:35:51
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
HV=200V beam on
angle: 39 deg
telescope run 20142 |
Sun Oct 3 21:49:19 2010, Erik Huemer, Pt, run, run032, 25600, 03.10.2010 21:44:30, 03.10.2010 22.40.07
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
HV=200V beam on
angle: 31
telescope run 20136 |
Sun Oct 3 08:19:13 2010, Markus Friedl, ITE, run, run029, 75000, 03.10.2010 08:33:28, 03.10.2010 10:50:27
|
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample! |
Sat Oct 2 18:36:57 2010, Markus Friedl, ITE, run, run028, 162263, 02.10.2010 18:34:06, 03.10.2010 08:11:13
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
short break ~2.10.2010 20:00 (beam off for a couple of minutes for access by marcos)
telescope run 20126 |
Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39
|
2 x SILC + 2 x ITE
HV=100V
telescope position: 107
telescope run 20125
beam not found yet |
Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51
|
2 x SILC + 2 x ITE
HV=100V
trying to find beam
telescope run 20124 |
Sat Oct 2 09:57:20 2010, Thomas Bergauer, CNM, run, run025, 150k, 02.10.2010 09:54:28, 02.10.2010 14:21:20
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
new position along the CNM strips (XY-table to 143/76/187.5)
telescope run 20122
|
Fri Oct 1 23:55:12 2010, Thomas Bergauer, CNM, run, run024, 320k, 01.10.2010 23:53:12, 02.10.2010 09:47:37
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
optimized alignment (XY-table to 133/76/187.5)
telescope run 20120 |
Thu Sep 30 23:09:29 2010, Thomas Bergauer, Micron Baby, run, run019, 162000, 30.09.2010 23:08:03, 01.10.2010 9:33:38
|
micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on
45° rotation
telescope run 20115 (after JTAG programming of telescope chips due to config errors)
|
Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05
|
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation
Teleskop nicht neu gestartet, machma nochamal |
Fri Oct 1 23:50:28 2010, Thomas Bergauer, CNM, run, run023, 2275, 01.10.2010 23:49:29, 01.10.2010 23:53:12
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
too much optimized alignment (XY-table to 133/74/187.5) ;-)
telescope run 20119 |
Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
not optimized alignment
telescope run 20118 |
Fri Oct 1 10:06:59 2010, Manfred Valentan, Micron Baby, run, run021, 75000, 01.10.2010 10:07:37, 01.10.2010 15:24:44
|
micron baby: 4 DUTs
HV=100V I=10.9uA (beginning) 13.6uA (end of run)
Beam on
60° rotation
telescope run 20116 |
Wed Sep 15 10:25:13 2010, Marko Dragicevic, common, Equipment List, , , ,
|
Slow Control:
3x Source Measurement Unit Keithley K2410
-- Inv.Nr.: 540-702, 1000EUR
-- Inv.Nr.: 540-730, 1000EUR
-- Inv.Nr.: 540-709, 1000EUR
-- Koax-Kabel + Adapter auf Banane
Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 1000EUR
-- Shunt-Widerstand-Platine
-- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700
TRHX
-- 3 Sensoren
-- 2 lange Flachbandkabel, 1 serielles Kabel
LV-Power-Supplies, je 150EUR
-- GW Instek GPC-1850, SN.: 4080392
-- GW Instek GPC-1850D, Inv.Nr.: 545-059
-- GW Instek GPC-1850D, Inv.Nr.: 545-062
-- Systron Donner HR 20-10A, SN.: 781-092
-- Systron Donner HR 20-10A, SN.: 781-096
-- GW Instek GPS-3030D SN.: E871711
-- HAMEG MHP4030 SN.: 057910044 500EUR
Oszilloskop Tektronix TDS 3054, SN.: B011109, 2500EUR
-- 3 probes
Die Katze (Belle-HV-Supply)
-- 2x HV-Kabel 30m (rot/schwarz)
GBIP
USB Adapter NI GPIB-USB-HS, S/N 14693EB, 100EUR
-Kabel, 3x lang, 1x kurz
USB Temperaturlogger PicoTech TC-08, S/N.: VSR 08/519 100EUR
BELLE DAQ (CERN):
Chrisu-PC, Inv.Nr.: 401-925
-- Monitore
---- Belinea, Inv.Nr.: 401-696
---- Gericom, SN.: M1132GR5467345
-- Keyboard & Maus
Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 2000EUR
-- Power Supply
-- VME-Controller
-- 4 VME-Module (1x Buffer, 1, Neco, 2x FADC)
DOCK-Box
-- Power Kabel
VME-Kabel (bockig) + Verlaengerung
30m-Kabel (8xCat7, 2xCat5, 2xgrau)
Lemo-Kabel
100pin-Flachkabel Neco-Buffer
Bananenkabel
Hybridkabel
Special TLU-Adapter (flipping pin order of RJ45)
Schrauben für Crate-Montage
Erdungskabel (liegen am CERN im Labor)
Magic Box
APVDAQ (Mol):
PC Inv.Nr: 401-943
-- Ilyama E2407, S/N 1105702000889
-- Keyboard & Maus
VME Crate Inv.Nr: 545-030
-- Create Controller Inv.Nr: 540-732
-- 3x APVDAQ
Repeater Board
-- 3x auf Platte montiert
Kabel
-- VME-Kabel (bockig)
-- 4x Netzwerk (gelb 1:1 verschalten)
-- 4x Netzwerk (grau 1:1 verschalten)
-- 1x Flachband
-- diverse Bananen
DUT:
Schraubenbox bau
-- diverse Schrauben
-- Gewindestangen
-- Fluegelmittern
-- 2x Sockel
4mm Steckschlauch fuer Trockenluft
Anschluss 1/8" auf 4mm Steckschlauch
Druckminderer
-- 6mm Snap-In
-- 6mm Schlauch
Chiller Huber ministat 230, Inv.Nr.: 482-021, 3000EUR
-- Manual
-- Netzteil
-- langes serielles Kabel
-- 5-6mm Schlauch
-- Adapter
-- 5 Liter dest. Wasser (falls noch Platz ist)
-- Frostschutz
-- LabView (falls ferngesteuert)
Box-Deckel
Baseplates (4?)
Schwarze Selbstklebefolie
Alufolie
GROSSES SCHWARZES LICHTDICHTES TUCH !!!!
Module
-- 2 x Micron Trapezoid
-- 2 x 6" Origami
-- 9 x Micron Baby
-- 2 x CNM 2D Sensoren
-- 8x SiLC (No. 0-7)
-- 2x Pt
EDV:
Netzwerk-Switch:
-- D-Link 8-Port GBit-Switch DGS1008D S/N F37v89B010104, 40 EUR
WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR
1TB externe Festplatte: Western Digital MyBook, SN.: WCAJ1469094, 40 EUR
-- Netzgeraet
-- USB-Kabel
-- Firewire 400/800 Kabel
Webcam
USB-Stick
Etikettiergeraet: Brother P-touch 1000
Laptops
-- Apple MacBook (MV) Inv.Nr.: 401-810
(-- Apple MacBook Pro (MD) Inv Nr.: 401-831)
2x USB-Seriell Adapter
Netzwerkkabel
1 Trommel Ethernet-Kabel (100m, vom Walzel)
einige RJ-45 Stecker
2.5" externe HD
CD/DVD Rohlinge
Tools:
Diverse Adaptoren Lemo-BNC, Lemo-Lemo
Taschenlampe + 2x Hirnbirn
Massband
Multimeter
Werkzeug (Schraubenzieher & Co)
Pinzetten
Laserpointer
Schwarze Fetzen
Gaffa
Doppelscotch
Kabelbinder
Druckluft zur Reinigung
Adapter f. Steckdosen
Verteiler-Leisten
Kabeltrommel
Schaltbare Steckerleisten
Tixo klein & gross
Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer
Ethernet-Crimp-Zange
Eisensagl
Schublehre
Wasserwaage
Misc:
Fondueset
Spiegelreflex Digitalkamera
-- Stativ
-- Reflexionszelt
Scheinwerfer
-- 3 x 500 W
-- 2 x Stativ
Akkus+Ladegerät
Dickes Logbook
Kugelschreiber/Bleistifte
Pflaster
Carnet ATA |
Thu Sep 23 15:32:28 2010, Manfred Valentan, Micron Baby, Modul B2Micron_2826_7_Baby4 -> UNBRAUCHBAR, , , , 6x
|
p-side: Hybrid 42
APV2: viele gerissene bonds der inneren Bondreihe
APV3: gerissene bonds innen
n-side: Hybrid 32
APV4: 0-35 fail
APV5: 10-40, 68 fail
|
Thu Sep 23 15:37:54 2010, Manfred Valentan, Micron Baby, Modul B2Micron_2826_19_Baby4 -> TRACKING & best DUT candidate, , , , 6x
|
p-side: Hybrid 48
alles ok
n-side: Hybrid 35 (wurde repariert, nachdem ein paar bonds dran glauben mussten...)
APV4: 15-25 hoher noise, keine Fehler zu sehen -> Sensorfehler?
APV5: 127&128 kreuzen sich, beim Behebungsversuch mehr Schaden angerichtet -> besser mal die Finger davon lassen! |
|