Mon Oct 4 16:15:48 2010, Christian Irmler, Pt, run, run042, 25600, 04.10.2010 16:12:52, 04.10.2010 16:35:18
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A |
Mon Oct 4 14:15:22 2010, Manfred Valentan, Pt, run, run040 --> unusable --> no bias, 25600, 04.10.2010 14:?:?, 04.10.2010 14:32:14
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A |
Mon Oct 4 12:24:38 2010, Erik Huemer, Pt, run, run038, 25600, 04.10.2010 12:22:09, 04.10.2010 12:43:40
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A |
Mon Oct 4 11:43:05 2010, Christian Irmler, Pt, run, run037, 25600, 04.10.2010 11:40:15, 04.10.2010 12:15:03
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A |
Mon Oct 4 10:43:45 2010, Marko Dragicevic, Pt, run, run036, 25600, 04.10.2010 10:33:05, 04.10.2010 11:35:51
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A |
Sun Oct 3 21:49:19 2010, Erik Huemer, Pt, run, run032, 25600, 03.10.2010 21:44:30, 03.10.2010 22.40.07
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A |
Sun Oct 3 08:19:13 2010, Markus Friedl, ITE, run, run029, 75000, 03.10.2010 08:33:28, 03.10.2010 10:50:27
|
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample! |
Sat Oct 2 18:36:57 2010, Markus Friedl, ITE, run, run028, 162263, 02.10.2010 18:34:06, 03.10.2010 08:11:13
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 119 |
Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39
|
2 x SILC + 2 x ITE
HV=100V
telescope position: 107 |
Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51
|
2 x SILC + 2 x ITE
HV=100V
|
Sat Oct 2 09:57:20 2010, Thomas Bergauer, CNM, run, run025, 150k, 02.10.2010 09:54:28, 02.10.2010 14:21:20
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Fri Oct 1 23:55:12 2010, Thomas Bergauer, CNM, run, run024, 320k, 01.10.2010 23:53:12, 02.10.2010 09:47:37
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Thu Sep 30 23:09:29 2010, Thomas Bergauer, Micron Baby, run, run019, 162000, 30.09.2010 23:08:03, 01.10.2010 9:33:38
|
micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on |
Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05
|
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on |
Fri Oct 1 23:50:28 2010, Thomas Bergauer, CNM, run, run023, 2275, 01.10.2010 23:49:29, 01.10.2010 23:53:12
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Fri Oct 1 10:06:59 2010, Manfred Valentan, Micron Baby, run, run021, 75000, 01.10.2010 10:07:37, 01.10.2010 15:24:44
|
micron baby: 4 DUTs
HV=100V I=10.9uA (beginning) 13.6uA (end of run)
Beam on |
Wed Sep 15 10:25:13 2010, Marko Dragicevic, common, Equipment List, , , ,
|
[B]Slow Control:[/B]
3x Source Measurement Unit Keithley K2410
-- Inv.Nr.: 540-702, 1000EUR
|
Thu Sep 23 15:32:28 2010, Manfred Valentan, Micron Baby, Modul B2Micron_2826_7_Baby4 -> UNBRAUCHBAR, , , , 6x
|
p-side: Hybrid 42
APV2: viele gerissene bonds der inneren Bondreihe
APV3: gerissene bonds innen |
Thu Sep 23 15:37:54 2010, Manfred Valentan, Micron Baby, Modul B2Micron_2826_19_Baby4 -> TRACKING & best DUT candidate, , , , 6x
|
p-side: Hybrid 48
alles ok
n-side: Hybrid 35 (wurde repariert, nachdem ein paar bonds dran glauben mussten...) |
|