Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 7 of 8  Not logged in ELOG logo
Entry  Wed Sep 29 18:53:05 2010, Thomas Bergauer, Micron Baby, XY Positions, , , ,  
center position: 113/47/7.5
top left (direction jura): 121/53.5/7.5
bottom right (direction saleve): 105/40.5/7.5
Entry  Thu Sep 30 10:56:34 2010, Christian Irmler, common, Room numbers, , , ,  
Room and telefone numbers.
 

    
        
            Name
Entry  Thu Sep 30 15:06:28 2010, Markus Friedl, Micron Baby, cal, cal006, 83800, 30.09.2010 15:01:56,  
micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
Entry  Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,  ITE128_SlowControl_FirstRun.png
center position: 119/48/187,5
 
Entry  Sat Oct 2 17:27:14 2010, Thomas Bergauer, ITE, cal, cal007, 83800, 02.10.2010 17:11:18 ,  intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png
ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V
Entry  Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,  
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
Entry  Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,  cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Sun Oct 3 16:23:20 2010, Erik Huemer, Pt, XY/R Position, , , ,  
centerposition: 119/43/187,5
27 grad: 214,5
Entry  Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,  slowcontrol_pt_cal010.gif
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
Entry  Sun Oct 3 18:52:56 2010, Christian Irmler, Pt, run, run030, 25600, 03.10.2010 19:16:29,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
Entry  Sun Oct 3 20:44:40 2010, Erik Huemer, Pt, run, run031, 25600, 03.10.2010 19:42:34,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A
Entry  Mon Oct 4 09:31:25 2010, Manfred Valentan, Pt, run, run035, 25600, 04.10.2010 09:28:40,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
Entry  Mon Oct 4 15:39:34 2010, Christian Irmler, Pt, run, run041, 25600, 04.10.2010 15:46:22,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
Entry  Mon Oct 4 16:29:36 2010, Christian Irmler, common, beam settings, , , ,  beamprofile_run042.gifbeamsettings_run042.jpg
beam settings optimized by beamline operator
wire champer display fixed
Entry  Mon Oct 4 20:16:19 2010, Christian Irmler, BELLE, cal, cal011, 83800, 04.10.2010 20:15:00,  
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Wed Oct 6 10:15:26 2010, Marko Dragicevic, Micron Baby, XY Positions After Irradiation, , , ,  
center position: 119/50/(7.5)
top left (direction jura, bottom right on sensor): 127/56.5/7.5
bottom right (direction saleve, top left on sensor): 111/43.5/7.5
Entry  Wed Oct 6 11:03:59 2010, Marko Dragicevic, Micron Baby, cal, cal013, 83800, 06.10.2010 11:03:12,  
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off
Entry  Wed Oct 6 23:02:09 2010, Marko Dragicevic, common, Beam Configuration, , , ,  BeamProfile.gifBeamMagnets.gifBeamColli.gif
Beam Settings and Profile on 5.10.2010 - 17:00h
Saved as: H6B.801
Entry  Fri Oct 8 17:26:36 2010, Markus Friedl, BELLE, cal, cal015, 83800, 08.10.2010 17:22:44,  
Belle stack without Origami2
HV=11V I=32uA
beam on
Entry  Fri Oct 8 23:05:03 2010, Markus Friedl, BELLE, cal, cal016, 83800, 08.10.2010 23:03:16,  
Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA 
cooling: Origami only, chiller set to -25°C, 
ELOG V3.1.5-fc6679b