Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 4 of 8  Not logged in ELOG logo
Entry  Sat Oct 9 12:25:36 2010, Thomas Bergauer, BELLE, run, run057, 276475, 09.10.2010 12:22:21, 09.10.2010 15:08:46 
 
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 degree
Entry  Sat Oct 9 00:17:02 2010, Markus Friedl, BELLE, run, run056, 225k, 09.10.2010 00:15:53, 09.10.2010 09:54:28 
Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243 µA  
cooling: Origami only, chiller set to -25°C, 
Entry  Fri Oct 8 23:43:07 2010, Christian Irmler, BELLE, run, run055, 12316, 08.10.2010 23:42:51, 09.10.2010 00:14:56  
Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA 
cooling: Origami only, chiller set to -25°C, 
Entry  Fri Oct 8 18:12:43 2010, Markus Friedl, BELLE, run, run054, 90000, 08.10.2010 18:08:48, 08.10.2010 21:49:36  
Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
Entry  Fri Oct 8 18:12:15 2010, Christian Irmler, BELLE, run, run053, 98000, 08.10.2010 00:33:14, 08.10.2010 13:36:57 
Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
Entry  Wed Oct 6 23:48:49 2010, Markus Friedl, BELLE, run, run052, 165789, 06.10.2010 23:47:12, 07.10.2010 08:43:42 
Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
Entry  Wed Oct 6 23:03:15 2010, Marko Dragicevic, BELLE, cal, cal014, 83800, 06.10.2010 23:01:56, 06.10.2010 23:34:07 
Belle stack without Origami2
HV=80V I=227uA
beam on
Entry  Wed Oct 6 16:33:55 2010, Markus Friedl, Micron Baby, run, run051, 90000, 06.10.2010 16:32:03, 06.10.2010 20:59:58 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still rising); 203uA (end of run)
beam on, NIM trigger from TLU (no handshake)
Entry  Wed Oct 6 11:59:29 2010, Markus Friedl, Micron Baby, run, run050, 90000, 06.10.2010 11:57:55, 06.10.2010 15:30:37 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
Entry  Wed Oct 6 11:51:25 2010, Thomas Bergauer, Micron Baby, run, run049, 4489, 06.10.2010 11:38:21, 06.10.2010 11:49:23 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on 
not yet optimized XY-table positions (111/43.5/7.5)
Entry  Tue Oct 5 18:13:05 2010, Christian Irmler, ITE, run, run048, 533125, 05.10.2010 18:14:57, 06.10.2010 09:27:44 LongtermITERun2.png
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Tue Oct 5 17:50:23 2010, Christian Irmler, ITE, cal, cal012, 83800, 05.10.2010 17:50:26, 05.10.2010 18:09:48  
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Tue Oct 5 10:20:30 2010, Manfred Valentan, BELLE, run, run46, 350000, 05.10.2010 01:00:00, 05.10.2010 10:16:07 
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Mon Oct 4 23:59:05 2010, Manfred Valentan, BELLE, run, run45, , 04.10.2010 ??:??:??, 05.10.2010 00:56:48 
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Tue Oct 5 10:23:09 2010, Manfred Valentan, BELLE, run, run47, 30000, 05.10.2010 10:21:20, 05.10.2010  
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Mon Oct 4 12:50:13 2010, Erik Huemer, Pt, run, run039 --> run out of air --> repeat, 25600, 04.10.2010 12:45:17, 04.10.2010 14:00:00 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
Entry  Mon Oct 4 00:08:55 2010, Manfred Valentan, Pt, run, run034, 187000, 04.10.2010 00:03:18, 04.10.2010 09:22:07 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=21.9A h02=7.5A
Entry  Sun Oct 3 22:53:49 2010, Manfred Valentan, Pt, run, run033, 25600, 03.10.2010 22.47:38, 04.10.2010 00:02:37 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
Entry  Mon Oct 4 21:01:25 2010, Christian Irmler, BELLE, run, run43, 30000, 04.10.2010 20:59:48, 04.10.2010 23:04:24 
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Mon Oct 4 23:12:16 2010, Manfred Valentan, BELLE, run, run44, 30000, 04.10.2010 23:?:?, 04.10.2010 23.57.23 
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
ELOG V3.1.5-fc6679b