Entry  Sat Aug 22 19:19:20 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run020, 75k, 22.08.2009 19:17:29, 22.08.2009 22:09:53 

Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

Entry  Sat Aug 22 22:14:50 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode + cooling, cal010, , 22.08.2009 22:24:22,  

Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
external clock
cooling
chiller set to 13 deg.

Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm

Entry  Sat Aug 22 23:06:22 2009, Christian Irmler, BELLE, pedestal correction 40 MHz transparent mode + cooling, pedcorr007, , 22.08.2009 23:04:29, 22.08.2009 23:13:51 

Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction

chiller set to 13 deg, 2900 rpm

Entry  Tue Aug 25 20:21:31 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode, run042, 85189, 25.08.2009 20:18:18, 26.08.2009 01:27:12 

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

Entry  Wed Aug 26 01:32:25 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run043, 100600, 26.08.2009 01:46:38 , 26.08.2009 07:10:14 

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

Entry  Wed Aug 26 07:19:42 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run044, 13504, 26.08.2009 07:18:19, 26.08.2009 08:46:11 (beam shut down @ 8:00) 

Belle DUT, HV=80V,  31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

Entry  Wed Aug 19 15:37:37 2009, Christian Irmler, ITE128, internal calibration, cal001, , 15:31:29,  

8 modules, HV=70V, 40MHz, 1 sample
no beam

APV 4,5: inverter off, higher baseline = PAD modules

Entry  Wed Aug 19 20:43:14 2009, Christian Irmler, ITE128, ITE128 shooting into strips w/o pitch adapter, low position, run001, 100600, 19.08.2009 20:42:08, 19.08.2009 22:54:21 

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 154.0979

ITE128 shooting into strips w/o pitch adapter, low position

Entry  Wed Aug 19 22:56:07 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run002, 100600, 19.08.2009 22:54:23, 20.08.2009 00:11:31 

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 144.3099

ITE128 shooting into strips w pitch adapter, upper position

Entry  Thu Aug 20 00:16:45 2009, Christian Irmler, ITE128, pedestal correction, pedcorr001, , 20.08.2009 00:14:21, 20.08.2009 00:24:28 

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz

pedestal correction

beam on

 

Entry  Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,  

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 139.3100

ITE128 shooting into strips w pitch adapter, upper edge of sensor

Entry  Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Entry  Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=112.31

Entry  Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53 

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

Entry  Wed Aug 26 14:26:13 2009, Wolfgang Kiesenhofer, ITE128, S/N final Single-Metal, run001 & run002, , ,  sn-pos_h13-h14_strips_pa_5bins.pdf

Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices.

Entry  Wed Sep 2 14:15:17 2009, Wolfgang Kiesenhofer, ITE128, ITE 128 Cross-Talk, run002, , ,  stripcorr_modall_thrs3_ktau.pdf

Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise.

Entry  Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,  

HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)

h01-Pt: 10uA

h02-Pt: 1.6uA

3 SiLC DUTs mit je ca. 38nA

h07-ITE-512: 3.77uA

h05-ITE-512: breakthrough

h06-ITE-512: breakthrough

Entry  Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , ,  

Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6

run angle[deg] pos height (xy-table) importance events
1 1 center module   + 10k
2 2 center module   + 10k
3 3 center module   + 10k
4 4 center module   + 10k 
5 5 center module   + 10k 
6 6 center module   + 10k 
7 7 center module   + 10k 
8 8 center module   +  10k
9 9 center module   +  10k
10 10 center module   +  10k
11 12 center module   + 10k 
12 14 center module   - 10k 
13 16 center module   - 10k
14 0 center module   + ? depends on ite512
15 0 upper pos   + 10k
16 0 lower pos   + 10k

 

Entry  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,  IandRH_first_Pt_run.pngPicture_1.png

Current of Pt modules during first run

Data of the run was dicarded.

Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.

Timescales for RH and I graph are different!!!

after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again

 

Current of ITE512 plus 2 SiLC08 modules

HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable

 

Entry  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,  

Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316