ID Date Author Projectdown Subject Run Number Events StartTime EndTime
  92   Mon Aug 24 22:12:22 2009 Georg AuzingerPt_ITE512Pt_ITE512 15deg airrun0321945624.08.09 22:18:0824.08.09 23:25:52

Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
 
no beam
--> run stopped after 19456 events
  93   Tue Aug 25 01:33:18 2009 Georg AuzingerPt_ITE512Pt_ITE512 0deg airrun03315172425.08.09 01:35:1825.08.2009 08:44:27

Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  95   Tue Aug 25 09:01:12 2009 Marko DragicevicPt_ITE512Pt_ITE512 2deg air run03420k25.08.09 08:56:18 25.08.09 09:45:

Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  96   Tue Aug 25 09:53:16 2009 Marko DragicevicPt_ITE512Pt_ITE512 4deg NO air!run03520k25.08.2009 09:5025.08.2009 11:00

Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  97   Tue Aug 25 11:26:23 2009 Thomas BergauerPt_ITE512Pt_ITE512 6deg NO air!run03620k25.08.2009 11:2525.08.2009 12:19:55

Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD

  98   Tue Aug 25 12:30:04 2009 Marko DragicevicPt_ITE512Pt_ITE512 8deg NO air!run03720k25.08.2009 12:4525.08.2009 13:40:13

Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36
  99   Tue Aug 25 13:48:30 2009 Marko DragicevicPt_ITE512Pt_ITE512 10deg NO air!run03820k25.08.2009 13:54:5425.08.2009 15:22:38

Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36
  100   Tue Aug 25 15:33:07 2009 Marko DragicevicPt_ITE512Pt_ITE512 12deg NO air! run03920k25.08.2009 15:3525.08.2009 17:10

Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36
  101   Tue Aug 25 17:14:52 2009 Marko DragicevicPt_ITE512Pt_ITE512 17deg NO air!run04020k25.08.2009 17:17:1125.08.2009 18:08:57

Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36
Attachment 1: Pt-17deg.png
Pt-17deg.png
  102   Tue Aug 25 18:22:25 2009 Manfred ValentanPt_ITE512Pt_ITE512 40deg NO air! (for calibration)run04110k25.08.2009 18:20:3025.08.2009

Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV

ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36
  16   Wed Aug 19 15:37:37 2009 Christian IrmlerITE128internal calibrationcal001 15:31:29 

8 modules, HV=70V, 40MHz, 1 sample
no beam

APV 4,5: inverter off, higher baseline = PAD modules

  18   Wed Aug 19 20:43:14 2009 Christian IrmlerITE128ITE128 shooting into strips w/o pitch adapter, low positionrun00110060019.08.2009 20:42:0819.08.2009 22:54:21

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 154.0979

ITE128 shooting into strips w/o pitch adapter, low position

  19   Wed Aug 19 22:56:07 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00210060019.08.2009 22:54:2320.08.2009 00:11:31

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 144.3099

ITE128 shooting into strips w pitch adapter, upper position

  21   Thu Aug 20 00:16:45 2009 Christian IrmlerITE128pedestal correctionpedcorr001 20.08.2009 00:14:2120.08.2009 00:24:28

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz

pedestal correction

beam on

 

  22   Thu Aug 20 00:31:45 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00310060020.08.2009 00:27:36 

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 139.3100

ITE128 shooting into strips w pitch adapter, upper edge of sensor

  77   Sun Aug 23 01:46:03 2009 Thomas BergauerITE1282nd run with ITE128: central positionrun021100k23.08.09 00:10 (ca.)23.08.2009 02:15:10

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Attachment 1: Picture_1.png
Picture_1.png
  78   Sun Aug 23 02:18:20 2009 Thomas BergauerITE1282nd run with ITE128: top position (3mm below center); during nightrun02240789523.08.2009 02:16:2123.08.2009 08:04:09

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=112.31

Attachment 1: Picture_1.png
Picture_1.png
  79   Sun Aug 23 08:13:31 2009 Thomas BergauerITE1282nd run with ITE128: top position (4mm below center)run023100k23.08.2009 08:06:5823.08.2009 09:30:53

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

  106   Wed Aug 26 14:26:13 2009 Wolfgang KiesenhoferITE128S/N final Single-Metalrun001 & run002   

Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices.

Attachment 1: sn-pos_h13-h14_strips_pa_5bins.pdf
  107   Wed Sep 2 14:15:17 2009 Wolfgang KiesenhoferITE128ITE 128 Cross-Talkrun002   

Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise.

Attachment 1: stripcorr_modall_thrs3_ktau.pdf