Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
ID Date Author Projectdown Subject Run Number Events StartTime EndTime
  15   Fri Aug 14 21:36:17 2009 Markus Friedl Config files    

Status of config files as of Friday 14 August 2009 late evening

Config file name Timing adjusted Sensor definition Tested
cern09_ite128_single1 YES NOT YET (?) YES

cern09_ite128_multi6

YES NOT YET (?) YES

cern09_pt_ite512_single1

YES NOT YET (?) YES

cern09_pt_ite512_multi6

YES NOT YET (?) NO

cern09_alignment_beam_single1

YES NOT YET (?) YES

cern09_alignment_beam_multi6

YES NOT YET (?) YES

cern09_belle_single

YES NOT YET (?) YES

cern09_belle_multi6

YES NOT YET (?) YES
cern09_silc_all_single YES (2008) YES (2008) NO
cern09_silc_all_multi6 YES (2008) YES (2008) NO




  20   Wed Aug 19 22:57:13 2009 Marko Dragicevic How-To    

TLU (run from DAQPCHEPHY):

ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12

-t100 internal trigger
-aXX Mask for Szintis:
1   4 mm (front)
2   4 mm (front)
4   9 mm (back)
8   9 mm (back)

DAQ:

Hostname: DAQPCHEPHY.CERN.CH

XY Table PC:

Hostname: XYPCEUDET.CERN.CH

Beam Control:

Hostname: cwo-hna453-h6b1.cern.ch
137.138.61.206

Eudet DAQ:

vnc eudetmac001.cern.ch
Cycle Run:
o) stop DAQ
o) kill eudaq Run Control
o) restart: ./STARTRUN.FORTIS.1
o) load config: testfortis_with_eudrb_beam_backpressure_WITH_SILC
o) press: Config (wait ~1 min.)
o) press: Start

  55   Fri Aug 21 17:14:58 2009 Wolfgang Kiesenhofer S/N Histograms Raw (no data selection)run001 (strips), run002 (pitch adapter), run003 (upper edge)   
Attachment 1: sn_langaufit_raw_strips.pdf
Attachment 2: sn_langaufit_raw_pa.pdf
Attachment 3: sn_langaufit_raw_edgerun.pdf
  84   Sun Aug 23 23:38:27 2009 Georg Auzinger Phone numbers    

 Georg #70

Wolfgang - Building: 41, Room: 204, Tel: ?

Manfred: Building 38, Room 522, Tel: 70522

Chrisu: B39, room 309, Tel: 79309

Bergi: Tel Zimmer: 79112, Handy: 16-2471

Maks: Tel Zimmer: 79117

  94   Tue Aug 25 09:00:51 2009 Thomas Bergauer beam conditions    

manually changed TRIM3, TRIM4 and TRIM6

Attachment 1: magnet_settings_withH6B.802.jpg
magnet_settings_withH6B.802.jpg
Attachment 2: 20090825_0859_beam_conditions.jpg
20090825_0859_beam_conditions.jpg
  114   Fri Dec 4 12:21:56 2009 Wolfgang Kiesenhofer ITE128 strip correlation kendall tau (preliminary result)    

Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14),  module 6 (standard sensor 2 / h12)

 

 

Attachment 1: stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdf
Attachment 2: stripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdf
Attachment 3: stripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf
ELOG V3.1.5-fc6679b