| ID | Date | Author | Project  | Subject | Run Number | Events | StartTime | EndTime | 
| 33 | Thu Aug 20 15:54:45 2009 | Manfred Valentan | BELLE | temp/humidty logger data |  |  |  |  | 
| position: underneath telescope. dewpoint ~ 15 degree test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe | 
| Attachment 1: easylog_under_telescope.gif | 
|  | 
| 41 | Fri Aug 21 06:16:15 2009 | Christian Irmler | BELLE | internal calibration 40 MHz transparent mode | cal003 |  | 20.08.2009  23:27:12 | 21.08.2009  00:05:16 | 
| Belle DUT, intcalHV=80V, 40 MHz, no beam
 transparent mode | 
| 42 | Fri Aug 21 06:24:10 2009 | Christian Irmler | BELLE | APVDAQ + telescope (beam alignement) | run6872 | 5785 | 21.08.2009  00:12:26 | 21.08.2009  00:27:11 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam alignementOrigami is hit between in center of sensor (APV 1 and 2 on both sides)
 | 
| 43 | Fri Aug 21 06:31:29 2009 | Christian Irmler | BELLE | APVDAQ + telescope | run6873 | 80173 | 21.08.2009  00:47:38 | 21.08.2009  06:07:02 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample | 
| 44 | Fri Aug 21 06:34:39 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz | run005 | 75000 | 21.08.2009  06:10:41 | 21.08.2009  10:37:33 | 
| was originally  run004, renamed after run was stopped to avoid duplicate names4 Belle DUTs
 HV=80V, 40 MHz, 6 sample, 120 GeV
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 table position y (height):  94.3
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) same as run6873, but w improved timing  --> peak is now at sample 2 or 3 since eudetmac was not reachable by VNC, the telescope has not been restarted !   | 
| 45 | Fri Aug 21 12:05:31 2009 | Christian Irmler | BELLE | APVDAQ  standalone 40 MHz hit mode | run006 | interrupted | 21.08.2009  10:41:51 | 21.08.2009  10:54:37 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 table position y (height):  94.3
 zero supressed w/o bad strip definition of origami module JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)     | 
| 46 | Fri Aug 21 12:06:06 2009 | Christian Irmler | BELLE | APVDAQ  standalone 40 MHz | run007 | interrupted | 21.08.2009  11:06:45 | 21.08.2009  11:10:40 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side | 
| 47 | Fri Aug 21 12:06:29 2009 | Christian Irmler | BELLE | APVDAQ  standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009  11:15:09 | 21.08.2009  11:29:53 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) same as run6873, but w improved timing  --> peak is now at sample 2 or 3 since eudetmac was not reachable by VNC, the telescope has not been restarted !   zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side hit cut = 4 | 
| 48 | Fri Aug 21 12:06:39 2009 | Christian Irmler | BELLE | APVDAQ  standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009  11:48:22 | 21.08.2009  12:01:53 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) same as run6873, but w improved timing  --> peak is now at sample 2 or 3 since eudetmac was not reachable by VNC, the telescope has not been restarted !   zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side hit cut = 5 | 
| 49 | Fri Aug 21 12:08:44 2009 | Christian Irmler | BELLE | APVDAQ  standalone 40 MHz | pedcorr003 |  | 21.08.2009  12:08:33 | 21.08.2009  12:18:45 | 
| 4 Belle DUTsHV=80V, 40 MHz
 pedestal correction
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 
 | 
| 50 | Fri Aug 21 12:22:43 2009 | Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009  12:53:02 | 21.08.2009  13:35:01 | 
| 4 Belle DUTsHV=80V, 31.8 MHz, 6 sample, 120 GeV
 switched to external clock source
 processed mode, hit cut = 4
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) | 
| 51 | Fri Aug 21 13:38:20 2009 | Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009  13:35:25 |  | 
| 4 Belle DUTsHV=80V, 31.8 MHz, 6 sample, 120 GeV
 external clock source
 processed mode, hit cut = 5
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) | 
| 52 | Fri Aug 21 14:18:11 2009 | Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode | cal004 |  | 21.08.2009  14:21:40 | 21.08.2009  15:01:24 | 
| Belle DUT, intcalHV=80V, 31.8 MHz, no beam
 transparent mode
 Origami p-side APV 2&3 with reverse readout order | 
| 53 | Fri Aug 21 15:27:08 2009 | Christian Irmler | BELLE | internal calibration 31.8 MHz hit mode | cal005 |  | 21.08.2009  15:34:43 | 21.08.2009  16:29:47 | 
| Belle DUT, intcalHV=80V, 31.8 MHz, no beam
 hit mode
 Origami p-side APV 2&3 with reverse readout order | 
| 54 | Fri Aug 21 16:37:22 2009 | Christian Irmler | BELLE | internal calibration 40 MHz hit mode | cal006 |  | 21.08.2009  16:30:33 |  | 
| Belle DUT, intcalHV=80V, 40 MHz, no beam
 hit mode
 switched back to internal 40 MHz clock | 
| 56 | Fri Aug 21 18:07:57 2009 | Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz | pedcorr004 |  | 21.08.2009  17:49:10 | 21.08.2009  18:24:31 | 
| 4 Belle DUTsHV=80V, 31.8 MHz
 pedestal correction
 transparent mode
 beam on
 
 | 
| 57 | Fri Aug 21 18:35:13 2009 | Christian Irmler | BELLE | APVDAQ  + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009  18:31:01 | 21.08.2009  23:25:03 | 
| 4 Belle DUTsHV=80V, 31.8 MHz, 6 sample, 120 GeV
 external clock source
 transparent mode
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) APVDAQ and telescope runs are not synchronized | 
| 59 | Sat Aug 22 01:06:34 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009  23:49:38 | 22.08.2009  03:21:48 | 
| Belle DUT, tranparent modeHV=80V, 40 MHz, beam on, 120 GeV
 6 samples
 chiller set to 13 deg.
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mmJP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
 APVDAQ and telescope runs are not synchronized trigger rate: about 300 - 500 ev / spill there was probably no water flow throught the pipe of the origami module during this run --> must be repeated | 
| 60 | Sat Aug 22 03:27:13 2009 | Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009  03:25:23 | 22.08.2009  07:08:09 | 
|  HV=80V, 31.8 MHz, beam on, 120 GeV 6 samples chiller set to 13 deg.   
f=31.8 MHz config file: cern09_belle_31.8mhz_multi6.cfg   there was probably no water flow throught the pipe of the origami module during this run --> must be repeated | 
| 61 | Sat Aug 22 08:32:02 2009 | Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009  08:15:05 | 22.08.2009  09:25:21 | 
|  HV=80V, 31.8 MHz, beam on, 120 GeV 6 samples, hit mode, hitcut=4 chiller set to 13 deg.   
f=31.8 MHz config file: cern09_belle_31.8mhz_hit_multi6.cfg   there was probably no water flow throught the pipe of the origami module during this run --> must be repeated |