ID Date Author Projectdown Subject Run Number Events StartTime EndTime Text Attachments
  92   Mon Aug 24 22:12:22 2009 Georg AuzingerPt_ITE512Pt_ITE512 15deg airrun0321945624.08.09 22:18:0824.08.09 23:25:52Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
 
no
  
  93   Tue Aug 25 01:33:18 2009 Georg AuzingerPt_ITE512Pt_ITE512 0deg airrun03315172425.08.09 01:35:1825.08.2009 08:44:27Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  95   Tue Aug 25 09:01:12 2009 Marko DragicevicPt_ITE512Pt_ITE512 2deg air run03420k25.08.09 08:56:18 25.08.09 09:45: Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  96   Tue Aug 25 09:53:16 2009 Marko DragicevicPt_ITE512Pt_ITE512 4deg NO air!run03520k25.08.2009 09:5025.08.2009 11:00Pt: 4 Grad, HV=200V, 0% (start run) to
14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
  
  97   Tue Aug 25 11:26:23 2009 Thomas BergauerPt_ITE512Pt_ITE512 6deg NO air!run03620k25.08.2009 11:2525.08.2009 12:19:55Pt: 6 Grad, HV=200V, 20% (start run)
to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
  
  98   Tue Aug 25 12:30:04 2009 Marko DragicevicPt_ITE512Pt_ITE512 8deg NO air!run03720k25.08.2009 12:4525.08.2009 13:40:13Pt: 8 Grad, HV=200V, 28% (start run) to
31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table:
  
  99   Tue Aug 25 13:48:30 2009 Marko DragicevicPt_ITE512Pt_ITE512 10deg NO air!run03820k25.08.2009 13:54:5425.08.2009 15:22:38Pt: 10 Grad, HV=200V, 31.7% (start run)
to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  100   Tue Aug 25 15:33:07 2009 Marko DragicevicPt_ITE512Pt_ITE512 12deg NO air! run03920k25.08.2009 15:3525.08.2009 17:10Pt: 12 Grad, HV=200V, 34.4% (start run)
to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  101   Tue Aug 25 17:14:52 2009 Marko DragicevicPt_ITE512Pt_ITE512 17deg NO air!run04020k25.08.2009 17:17:1125.08.2009 18:08:57Pt: 17 Grad, HV=200V, 36.5% (start run)
to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
 Pt-17deg.png 
  102   Tue Aug 25 18:22:25 2009 Manfred ValentanPt_ITE512Pt_ITE512 40deg NO air! (for calibration)run04110k25.08.2009 18:20:3025.08.2009Pt: 40 Grad, HV=200V, 36.9% (start run)
to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
  
  16   Wed Aug 19 15:37:37 2009 Christian IrmlerITE128internal calibrationcal001 15:31:29 8 modules, HV=70V, 40MHz, 1 sample
no beam 
APV 4,5: inverter off, higher baseline
  
  18   Wed Aug 19 20:43:14 2009 Christian IrmlerITE128ITE128 shooting into strips w/o pitch adapter, low positionrun00110060019.08.2009 20:42:0819.08.2009 22:54:21DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  19   Wed Aug 19 22:56:07 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00210060019.08.2009 22:54:2320.08.2009 00:11:31DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  21   Thu Aug 20 00:16:45 2009 Christian IrmlerITE128pedestal correctionpedcorr001 20.08.2009 00:14:2120.08.2009 00:24:28DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction
  
  22   Thu Aug 20 00:31:45 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00310060020.08.2009 00:27:36 DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  77   Sun Aug 23 01:46:03 2009 Thomas BergauerITE1282nd run with ITE128: central positionrun021100k23.08.09 00:10 (ca.)23.08.2009 02:15:10ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
 Picture_1.png 
  78   Sun Aug 23 02:18:20 2009 Thomas BergauerITE1282nd run with ITE128: top position (3mm below center); during nightrun02240789523.08.2009 02:16:2123.08.2009 08:04:09ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
 Picture_1.png 
  79   Sun Aug 23 08:13:31 2009 Thomas BergauerITE1282nd run with ITE128: top position (4mm below center)run023100k23.08.2009 08:06:5823.08.2009 09:30:53ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
  
  106   Wed Aug 26 14:26:13 2009 Wolfgang KiesenhoferITE128S/N final Single-Metalrun001 & run002   Most probable S/N, Single Metal Layer,
2D histogram fitted with langau in 5 bin
(strips) slices.
 sn-pos_h13-h14_strips_pa_5bins.pdf 
  107   Wed Sep 2 14:15:17 2009 Wolfgang KiesenhoferITE128ITE 128 Cross-Talkrun002   Preliminary strip correlation (Kendalls
Tau) for threshold = 3*stripnoise.
 stripcorr_modall_thrs3_ktau.pdf 