Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 2 of 6  Not logged in ELOG logo
ID Date Author Projectdown Subject Run Number Events StartTime EndTime Text Attachments
  1   Mon Jul 6 12:22:47 2009 Stephan HänselSiLCMeasurements - hybrids with APV    Pt Modules: 
Hybrids with 4 APVs:
  
 
  
  2   Mon Jul 6 12:24:53 2009 Stephan HänselSiLCModule Drawings     Pt Modules: 

    
3D-View 
    technical drawings:
  
  5   Mon Jul 6 12:29:20 2009 Stephan HänselSiLCSensors - layout     Pt Modules: 
CMS OB1 Sensors:

    
 Wafer-Screenshot.png 
  7   Mon Jul 6 16:22:36 2009 Stephan HänselSiLCMeasurements - Sensors     Pt Modules: 
OB1-Sensors:
     30210331516116
  
  8   Mon Jul 6 16:23:51 2009 Stephan HänselSiLCModule Components     Pt Modules: 

Pt-1:
  
  9   Thu Jul 9 10:29:58 2009 Stephan HänselSiLCMeasurements - Modules     Pt Modules:

- Sensoren sind Luftfeuhtigkeitsempfindlich
  
  17   Wed Aug 19 15:41:17 2009 Wolfgang KiesenhoferSiLCangle scan templates    Linie am rechten Seitenrand (in der Vorschau
unten leider nicht gut zu sehen) sollte mit
dem rechten Rand der Basisplatte abschließen
 13x 
  14   Fri Aug 14 19:35:43 2009 Thomas BergauerPt_ITE512intcal    HV=100V except h05-ITE-512 and h06-ITE-512
(runaway, HV off)
h01-Pt: 10uA
  
  67   Sat Aug 22 13:28:53 2009 Wolfgang KiesenhoferPt_ITE512runlist for pt-module angle-scan    Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6
  
  80   Sun Aug 23 13:15:42 2009 Marko DragicevicPt_ITE512Current and Humindity during first Run    Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars
 IandRH_first_Pt_run.pngPicture_1.png 
  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
  
  82   Sun Aug 23 17:18:25 2009 Christian IrmlerPt_ITE512pedestal correctionpedcorr008 23.08.2009 17:17:36  Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V,
  
  83   Sun Aug 23 17:19:50 2009 Christian IrmlerPt_ITE512internal calibrationcal011 23.08.2009 16:30:4323.08.2009 17:02:14Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V,
  
  85   Mon Aug 24 11:58:23 2009 Georg AuzingerPt_ITE512Pt_ITE512 1deg airrun02520k24.08.09 11:24:3324.08.09 12:40:25Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  86   Mon Aug 24 13:01:14 2009 Georg AuzingerPt_ITE512Pt_ITE512 3deg airrun02620k24.08.09 11:24:3324.08.2009 14:11:45Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  87   Mon Aug 24 14:23:01 2009 Georg AuzingerPt_ITE512Pt_ITE512 5deg airrun02720k24.08.2009 14:27:0724.08.2009 15:26:20Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  88   Mon Aug 24 15:28:49 2009 Georg AuzingerPt_ITE512Pt_ITE512 7deg airrun02820k24.08.09 15:39:5024.08.09 16:40:54Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  89   Mon Aug 24 16:44:36 2009 Georg AuzingerPt_ITE512Pt_ITE512 9deg airrun02920k24.08.09 17:03:2124.08.09 18:20:55Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  90   Mon Aug 24 18:30:07 2009 Georg AuzingerPt_ITE512Pt_ITE512 11deg airrun03020k24.08.09 18:45:0924.08.09 20:37:04Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  91   Mon Aug 24 22:04:56 2009 Georg AuzingerPt_ITE512Pt_ITE512 13deg airrun03120k24.08.09 20:53:5024.08.09 22:00:49Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
ELOG V3.1.5-fc6679b