ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
74
|
Sat Aug 22 19:19:20 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009 19:17:29 | 22.08.2009 22:09:53 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm
water flow checked befor start of run |
75
|
Sat Aug 22 22:14:50 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode + cooling | cal010 | | 22.08.2009 22:24:22 | |
Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
external clock
cooling
chiller set to 13 deg.
Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm |
76
|
Sat Aug 22 23:06:22 2009 |
Christian Irmler | BELLE | pedestal correction 40 MHz transparent mode + cooling | pedcorr007 | | 22.08.2009 23:04:29 | 22.08.2009 23:13:51 |
Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction
chiller set to 13 deg, 2900 rpm |
103
|
Tue Aug 25 20:21:31 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009 20:18:18 | 26.08.2009 01:27:12 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
104
|
Wed Aug 26 01:32:25 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009 01:46:38 | 26.08.2009 07:10:14 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
105
|
Wed Aug 26 07:19:42 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009 07:18:19 | 26.08.2009 08:46:11 (beam shut down @ 8:00) |
Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
16
|
Wed Aug 19 15:37:37 2009 |
Christian Irmler | ITE128 | internal calibration | cal001 | | 15:31:29 | |
8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline = PAD modules |
18
|
Wed Aug 19 20:43:14 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009 20:42:08 | 19.08.2009 22:54:21 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 154.0979
ITE128 shooting into strips w/o pitch adapter, low position |
19
|
Wed Aug 19 22:56:07 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009 22:54:23 | 20.08.2009 00:11:31 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 144.3099
ITE128 shooting into strips w pitch adapter, upper position |
21
|
Thu Aug 20 00:16:45 2009 |
Christian Irmler | ITE128 | pedestal correction | pedcorr001 | | 20.08.2009 00:14:21 | 20.08.2009 00:24:28 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction
beam on
|
22
|
Thu Aug 20 00:31:45 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009 00:27:36 | |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 139.3100
ITE128 shooting into strips w pitch adapter, upper edge of sensor |
77
|
Sun Aug 23 01:46:03 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009 02:15:10 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=115.31
new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture |
78
|
Sun Aug 23 02:18:20 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009 02:16:21 | 23.08.2009 08:04:09 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=112.31 |
79
|
Sun Aug 23 08:13:31 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009 08:06:58 | 23.08.2009 09:30:53 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=111.31 |
106
|
Wed Aug 26 14:26:13 2009 |
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 | | | |
Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. |
107
|
Wed Sep 2 14:15:17 2009 |
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 | | | |
Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise. |
14
|
Fri Aug 14 19:35:43 2009 |
Thomas Bergauer | Pt_ITE512 | intcal | | | | |
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA
3 SiLC DUTs mit je ca. 38nA
h07-ITE-512: 3.77uA
h05-ITE-512: breakthrough
h06-ITE-512: breakthrough |
67
|
Sat Aug 22 13:28:53 2009 |
Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan | | | | |
Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6
run |
angle[deg] |
pos |
height (xy-table) |
importance |
events |
1 |
1 |
center module |
|
+ |
10k |
2 |
2 |
center module |
|
+ |
10k |
3 |
3 |
center module |
|
+ |
10k |
4 |
4 |
center module |
|
+ |
10k |
5 |
5 |
center module |
|
+ |
10k |
6 |
6 |
center module |
|
+ |
10k |
7 |
7 |
center module |
|
+ |
10k |
8 |
8 |
center module |
|
+ |
10k |
9 |
9 |
center module |
|
+ |
10k |
10 |
10 |
center module |
|
+ |
10k |
11 |
12 |
center module |
|
+ |
10k |
12 |
14 |
center module |
|
- |
10k |
13 |
16 |
center module |
|
- |
10k |
14 |
0 |
center module |
|
+ |
? depends on ite512 |
15 |
0 |
upper pos |
|
+ |
10k |
16 |
0 |
lower pos |
|
+ |
10k |
|
80
|
Sun Aug 23 13:15:42 2009 |
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run | | | | |
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!!
after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again
Current of ITE512 plus 2 SiLC08 modules
HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable
|
81
|
Sun Aug 23 14:03:14 2009 |
Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 | |
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316 |