Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 1 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue May 6 13:51:43 2008, Thomas Bergauer, other, Equipment list, , , ,  
[B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
Entry  Mon May 19 15:14:40 2008, Markus Friedl, other, Tentative Beam Test Schedule, , , ,  
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
Entry  Mon May 19 15:21:49 2008, Markus Friedl, other, CERN SPS page 1, , , ,  
SPS Status
SPS Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html

Manual - http://jwenning.web.cern.ch/jwenning/documents/SPS/Operation/Page-1%20description.htm

Linac,
Entry  Fri May 30 10:36:18 2008, Marko Dragicevic, other, Important Information/Contact, , , ,  
[B]IPs[/B]
Linksys Router
[LIST]
Entry  Sat May 31 18:33:50 2008, Thomas Bergauer, other, beam profile, , , ,  Picture_1.pngbeamline_settings.png
[SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Entry  Wed May 7 10:43:09 2008, Thomas Bergauer, SiLC, Documentation: twiki, Stephans Hardware Drawings,...., , , ,  
DUT, APVDAQ Documentation
CERN TWiki: https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam

Stephan's Documentation: http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/
Entry  Wed May 7 16:28:23 2008, stephan hänsel, SiLC, Photos, , , ,  module-top.jpgmodule-bottom.jpg8Modules.jpg
Module Photos

[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview of module (without cover)[/URL]
Entry  Fri May 9 11:46:36 2008, Markus Friedl, SiLC, Data file format, (work in progress), , ,  
APVDAQ Data Analysis
====================
Entry  Fri May 9 15:29:28 2008, Thomas Bergauer, SiLC, Sensor Layout, , , ,  test-AC-2.pdf070516-SiLC_WaferLayout.pdf

    
    
        
             
            pplus strip
            
Entry  Wed May 14 09:21:39 2008, stephan hänsel, SiLC, capacity measurements - HPK-ILC-TS-6687-24, , , ,  capacity-TS24.epscapacity_measurements_ACTS-24.opj
ich hab mal die Kapazitäts-Messungen vom Thomas in ein Diagram gegeben

interessant ist, dass die Kapazität mit 2 intermediate strips (int. strips) kleiner ist als mit einem int. strip -> das bedeutet, dass der eine int. strip
Entry  Fri May 23 15:17:49 2008, Markus Friedl, SiLC, Module/chip/strip/zone numbering scheme, (work in progress), , ,  telescope_single_dut.giftelescope_8_dut.gifsilc_dut_stack_beam.jpgsilc_dut_beam.jpg
The SILC DUT is a stack of 8 silicon sensors surrounded by the telescope.
The spacing between each of the 8 layers is 20mm. Seen with the beam, the fourth layer is exactly centered
between the telescope legs. This means that the stack as a whole is not exactly centered, as there is no
Entry  Mon May 26 15:38:53 2008, Markus Friedl, SiLC, How to run APVDAQ, , , ,  panel_instruction.gifcern08_silc_all_single.cfgcern08_silc_all_multi6.cfgcern08_silc_mod03_single.cfgcern08_silc_mod03_multi6.cfg
Power-on Procedure
==================
Entry  Fri May 30 19:42:13 2008, stephan hänsel, SiLC, APVDAQ only, run0001, 51803, 30.05.2008 19:38:04, 30.05.2008 22:54:59 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
Entry  Sat May 31 17:29:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2716, 20000, 31.05.2008 14:59:26, 31.05.2008 15:56:23 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Entry  Sat May 31 17:32:35 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) , run2717, 6490, 31.05.2008 15:57:58, 31.05.2008 16:09:21 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
Entry  Sat May 31 17:36:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2718, 100000, 31.05.2008 16:21:57, 31.05.2008 21:08:32 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
Entry  Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
Entry  Sun Jun 1 01:56:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2720, 100000, 01.06.2008 01:51:45, 01.06.2008 07:48:09 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Entry  Sun Jun 1 08:06:57 2008, stephan hänsel, SiLC, APVDAQ + telescope (raw), run2721-2737, 22000, 01.06.2008 - 08:01:53, 01.06.2008 - 14:19:13 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Entry  Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
ELOG V3.1.5-fc6679b