Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 3 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Jun 9 12:34:16 2015, Benedikt Würkner, SVD3 (H6B), Horizontal Beam Profile Run, 66, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the PMTs 1 and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 11:20:25 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 65, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the vertical PMTs (number 0 and 2) see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 10:01:03 2015, Lukas Bulla, SVD3 (H6B), TLU setup info, , , , , Unknown upstream.jpgdownstream.jpg
Channels:


Upstream vertical -> channel 0; (bitmask 1)
Upstream horizontal -> channel 1; (bitmask 2)
Downstream
vertical -> channel 2; (bitmask 4)
Downstream horizontal ->channel 3; (bitmask 8)


 
Entry  Tue Jun 9 09:57:56 2015, Hao Yin, Belle II FADC (H6A), Hardware, 019, 62k, 1, No, Good 
room temp

FIRRun002, PedestalRun007, Calibrationrun003
Entry  Tue Jun 9 09:50:15 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 64, 50000, 5, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 64

Mimosa Threshold 6
Entry  Tue Jun 9 09:33:33 2015, Hao Yin, Belle II FADC (H6A), Calibration, 003, , , , Good 
room temp
FIRRun002,
pedestalrun006;
Entry  Tue Jun 9 09:32:41 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 007, 10000, , , Good 
Room temp, fir002
Entry  Mon Jun 8 22:11:07 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 63, 490000, 4, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 63

Mimosa Threshold 6
Entry  Mon Jun 8 20:16:41 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 62, 50000, 3, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 62

Mimosa Threshold 6
Entry  Mon Jun 8 20:13:59 2015, Hao Yin, Belle II FADC (H6A), Hardware, 017, , 5, Yes, Good 
cooled (see attachment) in -21.24 out -18.54

cooling supply emty at ~24:00 ie first 30k is cooled.

FIRRun002, PedestalRun006
Entry  Mon Jun 8 18:08:49 2015, Thomas Bergauer, SVD3 (H6B), Telescope online monitor, , , , , Unknown 
a working version of the EUDET online monitor (which works also with the FE-I4) is at the following location

~/BELLETEST/eudaq-neu/build/monitors/onlinemon$ ./OnlineMon.exe -sc 0 -f /home/telescope/eudaq/data/run000060.raw
Entry  Mon Jun 8 18:00:06 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, hw061, 50000, 2, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 61

Mimosa Threshold 6
Entry  Mon Jun 8 16:53:13 2015, Benedikt Würkner, SVD3 (H6B), EUTelescope Fitter not working investigation, , , , , Unknown nice-alignment.pngbad-alignment.png
Apparently every problem can be attributed to a misalignment problem. The telescope has troubles with heavily misaligned DUTs. Was resolved by creating
different gear-files for each run with pretty precise coordinates of the DUT position calculated for the telescope coordinate system. 

Additionally one has to watch out for misaligned planes of the telescope itself. It was required to allow for more than 2mm offset for the telescope
Entry  Mon Jun 8 15:49:23 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 60, 50000, 10, No, Unknown Screenshot_2015-06-08_17.59.50.pngScreenshot_2015-06-08_17.41.03.png
Hardware run with FEI4, Telescope and FW&BW Modules

Pos 10: x= 136.08mm, y=68.9 mm (narrow
side down)
Entry  Mon Jun 8 15:03:53 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and FEI4 WORKING, 59, 19000, , , Unknown 
Testrun with the FEI4 working for the first time. 

Lessons learned about the configuration:

EnableDUTVeto needs to be set for the FEI4 to allow it to work
Entry  Mon Jun 8 14:48:27 2015, Hao Yin, Belle II FADC (H6A), Hardware, 016, ~96k, 9, Yes, Good 
cooled (see attachment) in --21.24 out -18-54

FIRRun002, PedestalRun006

target: fw, pos 9
Entry  Mon Jun 8 11:57:14 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw058, 50000, 10, No, Good 
RUN WITH SVD3 plus telescope

EUDET Run 58

Mimosa Threshold 6
Entry  Mon Jun 8 11:33:24 2015, Thomas Bergauer, common, beam profile, , , , , Unknown Beamprofile.png
120GeV hadrons, beam config H6A.BELLE.003
Entry  Mon Jun 8 10:47:44 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw057, 50000, 9, No, Good run000057-fitter-residuals.pdf
RUN WITH SVD3 plus telescope

EUDET Run 57

Mimosa Threshold 6
Entry  Mon Jun 8 09:37:30 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw056, 50000, 8, No, Good run000056-fitter-residuals.pdf
RUN WITH SVD3 plus telescope

EUDET Run 56

Mimosa Threshold 6
ELOG V3.1.5-fc6679b