Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 3 of 4  Not logged in ELOG logo
ID Date Authordown Project Subject Run Number Events StartTime EndTime Data Text Attachments
  75   Tue Oct 30 10:37:19 2012 Markus FriedlHPK_babycalcal0398380030.10.2012 10:35:35 30.10.2012 11:02:06 GoodTurned off cooling, now taking warm data
 
HPK baby stack after irradiation
  
  76   Tue Oct 30 11:05:32 2012 Markus FriedlHPK_babyrunrun039150k30.10.2012 11:03:1930.10.2012 14:57:57UnknownHPK baby stack after irradiation - no cooling
I =  420A and growing (warming
up)
  
  77   Tue Oct 30 17:24:01 2012 Markus FriedlMicronOrigami_grosscalcal0408380030.10.2012 17:20:28 30.10.2012 17:54:09UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
  
  79   Tue Oct 30 22:15:41 2012 Markus FriedlMicronOrigami_grossrunrun041100k30.10.2012 22:09:13 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run041.jpg 
  1   Fri Oct 12 15:04:55 2012 Marko DragiceviccommonNetwork configuration    UnknownRouter:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
  
  17   Sun Oct 14 20:12:14 2012 Marko DragicevicInfineonrunrun007110k14.10.2012 20:07:1214.10.2012 21:04:12UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3uA
  
  18   Sun Oct 14 23:01:11 2012 Marko DragicevicInfineoncalcal0048380014.10.2012 21:44:0014.10.2012 21:03:00UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
  
  19   Mon Oct 15 00:08:26 2012 Marko DragicevicInfineonrunrun00833907515.10.2012 01:49:3315.10.2012 08:04:24Unknown Infineon Stack Version
2 (no height information, BabyStrips vertical
  
  20   Mon Oct 15 18:52:18 2012 Marko DragicevicMicronOrigami_grossStack configuration, Belle Stack 2    UnknownBelle stack 2:
Modules:

    Origami #4
    Origami
  
  21   Mon Oct 15 19:21:56 2012 Marko DragiceviccommonBeam settings and profile    UnknownBeam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad)
PARALL IN H6A; RD42
 NetBeans_IDE_3.5_15-Oct-12_19-28-32.png 
  22   Mon Oct 15 19:40:03 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun0093165015.10.2012 19:28:30 15.10.2012 22:08:31 CrapATTENTION! Bias voltage was +-100 V instead
of +-50 V 
Origami Stack 2: Origami #4, #3,
  
  23   Mon Oct 15 22:13:28 2012 Marko DragicevicMicronOrigami_grosscal ATTENTION: wrong bias voltage cal0058380015.10.2012 22:16:2615.10.2012 23:07:37 UnknownATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  24   Mon Oct 15 23:26:52 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun010158k15.10.2012 23:10:40 16.10.2012 05:05:35CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Same as run009.
  
  32   Wed Oct 17 01:21:50 2012 Marko DragicevicInfineonrunrun009150k15.10.2012 08:20:1515.10.2012 11:01:11Unknown This run was not recorded in original
sequence in the ELOG!!!
 
  
  7   Sat Oct 13 06:55:47 2012 Manfred ValentanMicronBabyrunrun00223401913.10.2012 06:50:0013.10.2012 13:50:40UnknownMicron baby stack
HV = -100V   I=5.4uA
beam on
  
  8   Sat Oct 13 14:44:47 2012 Manfred ValentanMicronOrigami_grossStack configuration, Belle Stack 3    UnknownModule in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
  
  9   Sat Oct 13 19:04:02 2012 Manfred ValentanMicronOrigami_grossrun with Belle stack 3run00330k13.10.2012 19:02:31 Unknown Belle stack 3: 2DSSD-Origami, Wedge_New_1,
Wedge_old
HV = +- 50V
  
  13   Sun Oct 14 02:00:12 2012 Manfred ValentanMicronBabyConfiguration of intermediate stack    UnknownMicron baby stack with every other strip
connected to APV chips
n-side faces the beam, p-side not
  
  14   Sun Oct 14 02:02:39 2012 Manfred ValentanMicronBabyrunrun005300k14.10.2012 02:00:0814.10.2012 08:17:02UnknownMicron baby intermediate stack
HV = -100V   I=6.3uA
beam on
  
  15   Sun Oct 14 08:25:10 2012 Manfred ValentanMicronBabycalcal0038380014.10.2012 08:21:4614.10.2012 08:51:58UnknownMicron baby intermediate stack
HV = -100 V
I = 6.9 uA
  
ELOG V3.1.5-fc6679b