Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012 16:04:47, 23.10.2012 23:04:56, Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sun Oct 14 20:12:14 2012, Marko Dragicevic, Infineon, run, run007, 110k, 14.10.2012 20:07:12, 14.10.2012 21:04:12, Unknown
|
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V I=3uA
beam on |
Fri Oct 19 00:45:52 2012, Markus Friedl, MicronOrigami_gross, run, run016, 11855, 19.10.2012 00:24:05, 19.10.2012 00:48:24, Crap
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A |
Tue Oct 16 05:24:21 2012, Christian Irmler, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run011, 150k, 16.10.2012 05:19:28 , 16.10.2012 09:59:24, Crap
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V |
Tue Oct 16 13:59:46 2012, Christian Irmler, MicronOrigami_gross, run, run013, 150k, 16.10.2012 13:43:05, 16.10.2012 20:21:04, Unknown
|
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=5.2µA |
Tue Oct 16 23:35:28 2012, Christian Irmler, MicronOrigami_gross, run, run014, 150k, 16.10.2012 23:32:24, 17.10.2012 04:59:02 , Unknown
|
Same as run011, but now with +- 50V bias voltage.
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-10V |
Wed Oct 17 01:21:50 2012, Marko Dragicevic, Infineon, run, run009, 150k, 15.10.2012 08:20:15, 15.10.2012 11:01:11, Unknown
|
This run was not recorded in original sequence in the ELOG!!!
|
Sat Oct 27 21:49:08 2012, Markus Friedl, MicronOrigami_gross, run, run031, 150k, 27.10.2012 21:42:46, 28.10.2012 02:35:55 (+1h due to winter time), Good
|
Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA |
Sun Oct 28 02:51:49 2012, Markus Friedl, MicronOrigami_gross, run, run032, 150k, 28.10.2012 02:47:24, 28.10.2012 08:31:19 , Good
|
Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA |
Tue Oct 30 11:05:32 2012, Markus Friedl, HPK_baby, run, run039, 150k, 30.10.2012 11:03:19, 30.10.2012 14:57:57, Unknown
|
HPK baby stack after irradiation - no cooling
I = 420A and growing (warming up)
positioned centered on p and n |
Sun Oct 21 16:04:06 2012, Markus Friedl, MicronOrigami_gross, run, run022, 151282, 21.10.2012 18:16:53, 22.10.2012 00:04:42, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Mon Oct 15 23:26:52 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run010, 158k, 15.10.2012 23:10:40 , 16.10.2012 05:05:35, Crap
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Same as run009.
Origami Stack 2: Origami #4, #3, Wedge new1, old |
Mon Oct 22 00:57:05 2012, Markus Friedl, MicronOrigami_gross, run, run023, 176629, 22.10.2012 00:55:59, 22.10.2012 10:04:38, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Fri Oct 19 00:56:16 2012, Markus Friedl, MicronOrigami_gross, run, run017, 197899, 19.10.2012 00:54:21, 19.10.2012 14:10:02 , Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=76A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Tue Oct 16 11:23:43 2012, Christian Irmler, MicronOrigami_gross, run, run012, 20k, 16.10.2012 11:16:01, 16.10.2012 12:27:03 , Unknown
|
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA |
Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
SPS Status during whole run: Still problems with North |
Sat Oct 13 06:55:47 2012, Manfred Valentan, MicronBaby, run, run002, 234019, 13.10.2012 06:50:00, 13.10.2012 13:50:40, Unknown
|
Micron baby stack
HV = -100V I=5.4uA
beam on |
Mon Oct 22 19:19:53 2012, Markus Friedl, MicronOrigami_gross, run, run024, 260000, 22.10.2012 19:18:16, 23.10.2012 08:17:20 , Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Mon Oct 29 04:02:16 2012, Manfred Valentan, MicronBaby, run, run036, 296294, 29.10.2012 03:53:33, 29.10.2012 11:05:35, Unknown
|
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36 uA |
Sat Oct 20 19:35:30 2012, Markus Friedl, MicronOrigami_gross, run, run020, 300000, 20.10.2012 19:34:19, 21.10.2012 08:55:28, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
|