Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 2 of 5  Not logged in ELOG logo
Entry  Wed Mar 7 15:44:25 2012, Christian Irmler, BELLE, Origami Module #4, cal112, 83800, 07.03.2012 15:42:53, , Unknown 
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Tue Oct 4 00:11:31 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones w & h-w, run002, 760000, 04.10.2011 00:11:06, 04.10.2011 09:01:06, Good 
hit modules in bottom left corner -> Zones wide and half-wide for all modules
Position of HEPHY x-z-table:
x = 336
Entry  Mon Oct 10 21:54:24 2011, Marko Dragicevic, Micron, Micron-Baby-Stack p-spray, run bottom right, run027, 700k, 10.10.2011 22:40:31, 11.10.2011 09:49:11, Unknown 
hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
timing corrected w.r.t. run004
Position of HEPHY x-z-table:
Entry  Mon Oct 10 00:50:23 2011, Christian Irmler, HPK, baby_add, run023, 680k, 10.10.2011 00:51:26, 10.10.2011 09:15:35, Good 
no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
Entry  Sun Oct 9 13:12:32 2011, Karl-Heinz Hoffmann, HPK, baby_add, run022, 670k, 09.10.2011 13:09:32, 10.10.2011 00:48:16, Good 
no cooling
beam on; xy table position x=330  y=64
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
Entry  Mon Feb 20 17:17:27 2012, Christian Irmler, BELLE, Origami Module #4, run100, 50k, 20.02.2012 17:07:21, 20.02.2012 17:17:22, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Feb 20 17:20:20 2012, Christian Irmler, BELLE, Origami Module #4, cal100, 50k, 20.02.2012 17:19:03, 20.02.2012 17:29:58, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Wed Feb 22 18:10:29 2012, Christian Irmler, BELLE, Origami Module #4, run106, 50k, 22.02.2012 17:39:10 , 22.02.2012 18:23:47, Good run106.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 18:32:24 2012, Christian Irmler, BELLE, Origami Module #4, run107, 50k, 22.02.2012 18:30:33, 22.02.2012 18:40:11, Good run107_apv5_raw_data.jpgrun107.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Mon Mar 5 19:27:56 2012, Christian Irmler, BELLE, Origami Module #4, run111, 50k, 05.03.2012 19:26:28, , Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,30µA
Entry  Sat Oct 8 23:27:44 2011, Karl-Heinz Hoffmann, HPK, baby_std, run020, 382000, 08.10.2011 23:24:16, 09.10.2011 09:24:20, Good 
no cooling
beam on; xy table position x=327,5  y=65
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
Entry  Wed Oct 5 20:49:11 2011, Markus Friedl, BELLE, Origami stack cooled, run009, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
Entry  Thu Oct 6 09:22:34 2011, Christian Irmler, BELLE, Origami stack cooled, run010, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
Entry  Tue Oct 4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011 22:09:37, 05.10.2011 09:11:54, Crap 
Origami6
HV=+-40V, no cooling
beam on
Entry  Mon Oct 10 16:26:20 2011, Marko Dragicevic, CNM, CNM stack, run026, 300000, 10.10.2011 16:23:46, 10.10.2011 20:30:00, Good 
no cooling
beam on; xy table position x=328  y=69.5
HV_CNM=20V, HV_BSTD1-N=200V
Entry  Fri Oct 7 00:20:15 2011, Christian Irmler, BELLE, Origami stack cooled, run012, 250k, 07.10.2011 00:15:54 , 07.10.2011 09:13:55, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=352 y=89
Entry  Sat Oct 8 14:33:25 2011, Thomas Bergauer, HPK, baby_std, run016, 250k, 08.10.2011 14:31:40, , Crap 
falsches config file (single statt multi6)
 
no cooling
Entry  Wed Oct 5 13:00:41 2011, Christian Irmler, BELLE, Origami stack cooled , run006, 24692, 05.10.2011 12:55:53, 05.10.2011 14:05:49, Crap 
Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo
Origami6
HV=+-40V
Entry  Mon Feb 20 17:27:02 2012, Christian Irmler, BELLE, Origami Module #4, run101, 24497, 20.02.2012 17:33:33, 20.02.2012 17:38:21, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Oct 3 21:01:00 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones n & h-n, run001, 200k, 03.10.2011 20:54:22, 03.10.2011 23:25:47, Good 
hit modules in top right corner -> Zones narrow and half-narrow for all modules
Position of HEPHY x-z-table:
x = 324
ELOG V3.1.5-fc6679b